Project: rjanzen   -  
            Listing for Category : instrument panel
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Ron Janzen   -  
Project:   Luscombe EAB
Total Hours:32.5
Total Flight Time:
Total Expense:N/A
Start/Last Date:Jan 04, 2019 - No Finish Date
Engine:Continental 0-200
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=rjanzen

Home or Last Project Picture

Nov 07, 2022     wiring       Category: Instrument Panel
I didn't think there could be so many wires in a simple, no auto pilot basic VFR aircraft. However, the fuel injection and electronic ignition add a lot more complexity to the wiring process. There will be a huge benefit in not ever having carb ice (0-200) and being able to adjust fuel flow individually to the cylinders to even out EGT and CHT. At this point it's like drinking from a fire hose but as they say - 1 wire at a time and label the ends.


 
Mar 07, 2022     switch and panel layout       Category: Instrument Panel
Finally getting preplanning ideas onto the panel. Drilled, filed and fit the instruments and switches into their places. Finished paint and lettering and installed. Now the wiring phase starts.


 
Jan 27, 2020     Butchered       Category: Instrument Panel
Why would someone do this? It is a structural piece and is now rendered useless. A new panel is over $500 and needs to to fitted. I will cut a piece to fit and fill in and glue it in (Norton Speed Grip) as tig welding will cause way too much distortion.

New thought - I think I'll buy a new one.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.