Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:538.2
Total Flight Time:
Start/Last Date:May 09, 2020 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=S-21

Home or Last Project Picture

Dec 26, 2020     Rear baggage floor - (2 hours)       Category: Interior Finish
Worked on the rear baggage floor in preparation for fitting the station 4 large PVC closeout.


 
Dec 31, 2021     Seat assembly - (2 hours) Category: Interior Finish
Gathered parts for both seats, begin assembly on first seat. Countersink plates, assemble roller bearings onto seat bottom frame, assemble frame.
 
Nov 27, 2022     Seat assembly - (2 hours)       Category: Interior Finish
Gathered parts for both seat assemblies and started on first one. Countersink plates, roller bearings to seat bottom frame, assembly of rest of frame.


 
Nov 28, 2022     Seat frames assembled - (2.5 hours)       Category: Interior Finish
Finish assembling first seat frame and then do second one also. Video attached to show adjusting action.


 
Nov 29, 2022     Seat back pieces and bottom of first seat installed - (1.5 hours)       Category: Interior Finish
Lowest part of the three seat back panels had an update to add two holes and then use SS rivets in the 4 lowest holes. The safety wire wrap is to hold the inside tube in place until the cover/seat pad assembly will hold the seat assembly together. After lower pan (bottom) installed, the head rest frame was fit into place and holes drilled for rivnuts. One rivnut installed shows in last picture.


 
Dec 01, 2022     Seat assembly - (1 hour)       Category: Interior Finish
Finish installing rivnuts for first seat's headrest, test fit headrest as shown. Began installing seat back panels on second seat.


 
Dec 02, 2022     Seat assembly - (1.2 hours)       Category: Interior Finish
Attach seat back panels and seat bottom pan on second seat. Began to fit headrest frame on second seat.


 
Dec 03, 2022     Seat assembly - (1.5 hours)       Category: Interior Finish
Finish assembly and headrest install on second seat.


 
Dec 04, 2022     Seat padding/cushions - (2.5 hours)       Category: Interior Finish
Begin installing seat back cushion on first seat. Using a Phillips screwdriver heated with a torch to burn holes for zip ties. Had to open seat bottom up and rearrange foam as this cushion was very lopsided.


 
May 11, 2023     Wasted time Bedliner floor cover. - (1 hour)       Category: Interior Finish
I had used Dupli-Color rattle can bed liner spray on my baggage floor panels and it seems to be sticking well. I thought that might be a good way to extend the life of the floor right under pilot/passenger feet in the footwell area. Acid etched the pans and masked off, shot the material on just before quitting for the night. Looks promising.

Next morning the material began to peel off with the masking tape. Perhaps it wasn't cured enough, but it came off pretty easily once started. Decided that wasn't the answer and peeled it all off the following day.

The baggage floor pieces were painted outside on an 80 degree plus day, in the sun. I think that is contributing to the success of themselves pieces.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.