EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
S-21
-
Listing for Category : Empennage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (272)
Research
- (1)
Workshop
- (1)
Empennage
- (36)
Fuselage
- (48)
Firewall
- (14)
Tail Feathers
- (1)
Wings
- (93)
Controls
- (10)
Avionics
- (10)
Lighting
Instrument Panel
- (4)
Landing Gear
- (5)
Engine
- (30)
Propeller
Fuel System
- (1)
Interior Finish
- (12)
Paint / Decals
- (4)
Inspection
Tools
- (2)
Builder Name:
Kent Ingram
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
538.2
Total Flight Time:
Start/Last Date:
May 09, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=S-21
Home or Last Project Picture
Jul 02, 2020
Attach trim tab hinges
- (1.5 hours)
Category: Empennage
Drilled and attached hinge halves to trim tab. Three hinges total. Work ended more quickly than anticipated as I drilled under a fingernail with a thankfully small drill bit while drilling through the rear elevator spar to attach opposite hinge halves.
72994889-7FC9-43F5-BF8B-FAF690F8A6E8.jpeg
98AA76DC-5D8F-4604-A1D1-39F989546C01.jpeg
488FFAE8-3889-4E32-88FE-27CFBB4DFD8F.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.