EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
S-21
-
Listing for Category : Fuselage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (272)
Research
- (1)
Workshop
- (1)
Empennage
- (36)
Fuselage
- (48)
Firewall
- (14)
Tail Feathers
- (1)
Wings
- (93)
Controls
- (10)
Avionics
- (10)
Lighting
Instrument Panel
- (4)
Landing Gear
- (5)
Engine
- (30)
Propeller
Fuel System
- (1)
Interior Finish
- (12)
Paint / Decals
- (4)
Inspection
Tools
- (2)
Builder Name:
Kent Ingram
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
538.2
Total Flight Time:
Start/Last Date:
May 09, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=S-21
Home or Last Project Picture
Apr 04, 2021
Firewall deburred, priming forward floor, wingtips
- (3.0 hours)
Category: Fuselage
Removed firewall which had been clecoed in place to fit boot cowl. Enlarged holes for engine mount bolts to pass through and deburred all holes that were drilled to fit boot cowling. Masked seat rails and primed forward floor area (inside) of fuselage. Also started to fit left wingtip, beginning work on the support rib only.
E8D73EB8-2E96-45C3-A60B-9A6A32701A5F.jpeg
6901BE2B-E854-408A-A071-A81AF07959F8.jpeg
D4ADB1F1-CA15-47E4-9636-67740C1C5C5F.jpeg
006CEEEE-A802-4100-BE23-66F647492588.jpeg
8E9598C1-830A-4522-8DBE-D86B9C729695.jpeg
D6246DB1-E14E-454B-89A2-E87A6D470844.jpeg
2A0C3AEA-48C1-4118-BDA6-B85B3EF859D3.jpeg
95D14457-44F5-4875-BC3E-71CA281A1EEF.jpeg
64A1CD2D-D511-4407-949A-6DE95F37C8BD.jpeg
0C3FBBF8-F7D4-4BFD-8FA1-111A5920B518.jpeg
3844A796-27F2-486F-A679-D27FED92D0D4.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.