EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
S-21
-
Listing for Category : Fuselage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (272)
Research
- (1)
Workshop
- (1)
Empennage
- (36)
Fuselage
- (48)
Firewall
- (14)
Tail Feathers
- (1)
Wings
- (93)
Controls
- (10)
Avionics
- (10)
Lighting
Instrument Panel
- (4)
Landing Gear
- (5)
Engine
- (30)
Propeller
Fuel System
- (1)
Interior Finish
- (12)
Paint / Decals
- (4)
Inspection
Tools
- (2)
Builder Name:
Kent Ingram
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
538.2
Total Flight Time:
Start/Last Date:
May 09, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=S-21
Home or Last Project Picture
Dec 09, 2020
Magnetometer mount and work on the big attach
- (3 hours)
Category: Fuselage
Had picked up the factory magnetometer mount at Hays so installed before the tail cone got closed. Still working on the attachment of fuse to tail. Primed the doubler strips that will be touching both aluminum and metal.
IMG_3297.jpeg
IMG_3298.jpeg
IMG_3299.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.