EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
S-21
-
Listing for Category : Wings
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (272)
Research
- (1)
Workshop
- (1)
Empennage
- (36)
Fuselage
- (48)
Firewall
- (14)
Tail Feathers
- (1)
Wings
- (93)
Controls
- (10)
Avionics
- (10)
Lighting
Instrument Panel
- (4)
Landing Gear
- (5)
Engine
- (30)
Propeller
Fuel System
- (1)
Interior Finish
- (12)
Paint / Decals
- (4)
Inspection
Tools
- (2)
Builder Name:
Kent Ingram
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
538.2
Total Flight Time:
Start/Last Date:
May 09, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=S-21
Home or Last Project Picture
Jul 23, 2020
Aileron cable (left) and wire grommets, flap cable
- (2.0 hours)
Category: Wings
Determined proper orientation of aileron cable and install, safety wire to bell crank. Drilled electrical wire grommet holes to size and install grommets. Installed telex cable for flaps and safety wired to anchor.
0B06A554-0D95-4632-8E2D-233D33E57BBF.jpeg
15F9D549-668E-456E-A7A0-F2FC9FB048B1.jpeg
6D0EFA41-4566-4499-9187-3115AA6DEAFE.jpeg
7276B4CE-4AA8-471E-9497-DF270DF4AB75.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.