EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
S-21
-
Listing for Category : Wings
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (272)
Research
- (1)
Workshop
- (1)
Empennage
- (36)
Fuselage
- (48)
Firewall
- (14)
Tail Feathers
- (1)
Wings
- (93)
Controls
- (10)
Avionics
- (10)
Lighting
Instrument Panel
- (4)
Landing Gear
- (5)
Engine
- (30)
Propeller
Fuel System
- (1)
Interior Finish
- (12)
Paint / Decals
- (4)
Inspection
Tools
- (2)
Builder Name:
Kent Ingram
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
538.2
Total Flight Time:
Start/Last Date:
May 09, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=S-21
Home or Last Project Picture
Sep 05, 2020
Gretz pitot mount pt 3
- (1.0 hour)
Category: Wings
Finish filing hole to allow Gretz mount to fit easily. Shortened aluminum tubes from Garmin pitot to the point I could work them through the mount. Nut plates not riveted to mount yet so this is just a test fit. Primed the steel airfoil shaped mount in preparation for riveting on the nut plates.
21D9A336-8754-4BB4-AD5C-FB71D25DA384.jpeg
5622A2B9-B13E-4E17-BB69-B91718AF7C44.jpeg
9236A0CD-B6EF-4E31-92E3-F7EB60FA8EE3.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.