Project: S-21   -  
            Listing for Category : Wings
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Kent Ingram   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:538.2
Total Flight Time:
Start/Last Date:May 09, 2020 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=S-21

Home or Last Project Picture

Oct 16, 2023     Correct Aileron Cable Twist - (1 hour) Category: Wings
Determined that the right side Aileron cable had a twist (the bell-crank had flipped during paint/storage) was able to correct without undoing anything inside of wing. Also determined that I had left off the male end of the pushrod that was to be attached to the bell-crank before the wing skins were attached. I will correct at next work session.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.