EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
ToddsCruzer
-
Listing for Category : elevator
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (43)
Research
- (1)
Inspection
- (1)
Rudder
- (3)
Horz. Stab.
- (9)
Elevator
- (8)
Rt O/B Flprn
- (2)
Lt O/B Flprn
- (3)
Rt l/B Flprn
- (1)
Lt I/B Flprn
- (1)
Right Wing
- (14)
Builder Name:
Todd Osborne
-
Project:
Zenair - CH 750 Cruzer
-
VIEW REPORTS
Total Hours:
116.1
Start/Last Date:
Dec 27, 2020 - No Finish Date
Engine:
Viking 130
Panel:
Custom (GlassPack)
Friendly URL:
https://eaabuilderslog.org?s=ToddsCruzer
Home or Last Project Picture
May 15, 2021
Completed
- (4 hours)
Category: Elevator
Reassembled and riveted all components. Tested trim system.
0001.jpg
0002.jpg
0003.jpg
May 12, 2021
Disassemble, Prime, and Paint
- (5 hours)
Category: Elevator
Disassembly, prime, and paint. The weather was cold and rainy, very high humidity, and the paint took forever to dry. Final assembly will have to wait.
0001.jpg
0002.jpg
0003.jpg
0004.jpg
0005.jpg
0006.jpg
May 11, 2021
Trim Tab and Teardown
- (5 hours)
Category: Elevator
Fit and drilled trim tab. Installed servo motor for trim and reinforcement L under the skin. Tear down, deburring, cleaning parts for primer and paint.
May 07, 2021
Support Tabs and L's
- (1.8 hours)
Category: Elevator
Cut and drilled support tabs, L angles, and other control horn fittings.
May 05, 2021
Drilling Hinge, Control Horns, and Doublers
- (2.2 hours)
Category: Elevator
Cleco'd top skin, joined with horizontal stabilizer, and started drilling rivet line. Fit and drilled control horns and doublers.
0001.jpg
0002.jpg
0003.jpg
0004.jpg
May 04, 2021
Top Skin
- (1 hour)
Category: Elevator
Cleco'd top skin, joined with horizontal stabilizer, and started drilling rivet line.
0001.jpg
0002.jpg
May 03, 2021
Started Elevator
Category: Elevator
Started fitting ribs and other components. Cut connectors for inside center channel and drilled and clecoed into position. Leveled on steel beams. Next up it to weight it down and cleco the top skin, setting the final position.
0001.jpg
0002.jpg
May 02, 2021
Preparing Elevator
- (1 hour)
Category: Elevator
Pulled out elevator parts and deburred them.