EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
ToddsCruzer
-
Listing for Category : horz. stab.
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (43)
Research
- (1)
Inspection
- (1)
Rudder
- (3)
Horz. Stab.
- (9)
Elevator
- (8)
Rt O/B Flprn
- (2)
Lt O/B Flprn
- (3)
Rt l/B Flprn
- (1)
Lt I/B Flprn
- (1)
Right Wing
- (14)
Builder Name:
Todd Osborne
-
Project:
Zenair - CH 750 Cruzer
-
VIEW REPORTS
Total Hours:
116.1
Start/Last Date:
Dec 27, 2020 - No Finish Date
Engine:
Viking 130
Panel:
Custom (GlassPack)
Friendly URL:
https://eaabuilderslog.org?s=ToddsCruzer
Home or Last Project Picture
May 02, 2021
Painting Trim
- (1.2 hours)
Category: Horz. Stab.
Prep and Paint black trim
0001.jpg
0002.jpg
0003.jpg
0004.jpg
0005.jpg
May 01, 2021
Install Hinge and Tip Plastics
- (3.2 hours)
Category: Horz. Stab.
Installed hinge (had to cut and trim to clear tip ribs), installed trailing edge tips ribs, and painted the plastics.
Apr 25, 2021
Drilled Hinge and Started Plastics
- (2.1 hours)
Category: Horz. Stab.
Drilled hinge up through final A5 size, fitted trailing edge end ribs, and started installing plastic tip on right side.
Apr 14, 2021
Final Skinning
- (2 hours)
Category: Horz. Stab.
Installed new rear attachment bracket and started final fitting of top skin and end ribs. Riveted top skin and end ribs.
Left.jpg
Rear Attachment Bracket.jpg
Right.jpg
Mar 21, 2021
Skinning
- (4 hours)
Category: Horz. Stab.
Test fit and trimmed skin. Riveted bottom side of skin to skeleton. Fabricated end rip attachment brackets. Deburred and primed. Tom Hathaway helped out a lot today.
End Ribs.jpg
Skinning.jpg
Mar 20, 2021
Reassemble Skeleton
- (3.9 hours)
Category: Horz. Stab.
Reassembled and riveted complete skeleton. I ordered a replacement rear attachment bracket from Zenith that has not arrived yet. Since that needs to be installed before skinning, I am limited to how much more I can do. Deburred and primed skin.
Center Section 2.jpg
Center Section.jpg
Skeleton Riveted 2.jpg
Skeleton Riveted.jpg
Skin Deburred and Primed.jpg
Mar 15, 2021
Deburring and Priming
- (2.1 hours)
Category: Horz. Stab.
Deburring and priming skeleton parts before final assembly.
Mar 14, 2021
Front Spar Work
- (2.5 hours)
Category: Horz. Stab.
Deburred, primed, and riveted front spar. Still need to rivet attachment brackets, but they are primed and ready for installation.
0001.jpg
0002.jpg
0003.jpg
0004.jpg
Mar 06, 2021
Started
- (2 hours)
Category: Horz. Stab.
Fabricated rear spar mounting tab. Prepped and riveted rear spar lower caps and doublers.
0001.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.