Project: ToddsCruzer   -  
            Listing for Category : horz. stab.
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Todd Osborne   -  
Project:   Zenair - CH 750 Cruzer   -   VIEW REPORTS
Total Hours:116.1
Start/Last Date:Dec 27, 2020 - No Finish Date
Engine:Viking 130
Panel:Custom (GlassPack)
 
Friendly URL: https://eaabuilderslog.org?s=ToddsCruzer

Home or Last Project Picture

May 02, 2021     Painting Trim - (1.2 hours)       Category: Horz. Stab.
Prep and Paint black trim


 
May 01, 2021     Install Hinge and Tip Plastics - (3.2 hours) Category: Horz. Stab.
Installed hinge (had to cut and trim to clear tip ribs), installed trailing edge tips ribs, and painted the plastics.
 
Apr 25, 2021     Drilled Hinge and Started Plastics - (2.1 hours) Category: Horz. Stab.
Drilled hinge up through final A5 size, fitted trailing edge end ribs, and started installing plastic tip on right side.
 
Apr 14, 2021     Final Skinning - (2 hours)       Category: Horz. Stab.
Installed new rear attachment bracket and started final fitting of top skin and end ribs. Riveted top skin and end ribs.


 
Mar 21, 2021     Skinning - (4 hours)       Category: Horz. Stab.
Test fit and trimmed skin. Riveted bottom side of skin to skeleton. Fabricated end rip attachment brackets. Deburred and primed. Tom Hathaway helped out a lot today.


 
Mar 20, 2021     Reassemble Skeleton - (3.9 hours)       Category: Horz. Stab.
Reassembled and riveted complete skeleton. I ordered a replacement rear attachment bracket from Zenith that has not arrived yet. Since that needs to be installed before skinning, I am limited to how much more I can do. Deburred and primed skin.


 
Mar 15, 2021     Deburring and Priming - (2.1 hours) Category: Horz. Stab.
Deburring and priming skeleton parts before final assembly.
 
Mar 14, 2021     Front Spar Work - (2.5 hours)       Category: Horz. Stab.
Deburred, primed, and riveted front spar. Still need to rivet attachment brackets, but they are primed and ready for installation.


 
Mar 06, 2021     Started - (2 hours)       Category: Horz. Stab.
Fabricated rear spar mounting tab. Prepped and riveted rear spar lower caps and doublers.


 