Project: N524JL/N87JL   -  
            Listing for Category : workshop
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Jeremy Leonard   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1026
Total Flight Time:
Start/Last Date:Mar 17, 2021 - No Finish Date
Engine:Lycoming IO360M1B
Propeller:Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
 
Friendly URL: https://eaabuilderslog.org?s=N524JL/N87JL

Home or Last Project Picture

Mar 12, 2024     Back on track       Category: Workshop
It's been a little bit since I did any real meaningful work since I've been moving into and arranging everything in the hangar. But with everything moved in and mostly organized, I'm back at the building. I need to go back and figure out on what I need to complete that I had to skip due to space constraints.


 
Feb 29, 2024     BIG DAY!!!!!!       Category: Workshop
After 3+ years on hangar waiting lists, I received a call from the closest airport to me and they advised me that a hangar was ready to go. They asked if I still wanted it and without hesitation I said YES!!!!!! I am so happy that this popped up when it did.

So with the help my buddy Nick and his dad, we were able to move everything in a day with two trips of a 26 foot U-Haul. I am incredibly thankful for them for helping me on short notice!

The fridge is stocked :)


 
Dec 01, 2022     Hangar issues and a temporary fix Category: Workshop
So there is a big issue and shortage in my area with Hangar availability. My fuselage kit is suppose to be shipped at any moment and with out the ability to build it and get it out of my basement and no hangar to continue the build, I had to buy a shed to assemble the fuselage until I can get into a hangar. Hopefully a hangar will come available in the next 1-1.5 years or there will be a bigger issue. PLEASE BUILD MORE HANGARS!!!
 
Mar 01, 2021     Workshop ready       Category: Workshop
Basement workshop ready for the build.


 
Feb 01, 2021     Two more small tables - (12 hours) Category: Workshop
Had left over MDF boards, so I purchased more lumber and screws to make 2 more smaller EAA workbenches.
 
Jan 30, 2021     Purchased and built tables - (12 hours)       Category: Workshop
Purchased the lumbar at Lowes and built the 2 EAA workbenches.


 
Jan 28, 2021     MDF Tops/Saw - (3 hours) Category: Workshop
Purchased MDF boards, screws, glue and skill saw for project.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.