Builder Name:Andrew Broxholme   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:299.5
Total Flight Time:
Total Expense:$57938.68
Start/Last Date:Mar 15, 2021 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=BroxyRV14

Home or Last Project Picture

Feb 02, 2023     Rudder, final assembly - (1.5 hours)       Category: Fin & Rudder
Completed rivetting the rudder skins to the bottom ribs and also to the lower counter balance rib so ready to fit the weight then the final top rib. Once the top rib is in place will rivet down either side of the spar then start on the trailing edge, still a bit nervous about that.


 
Jan 29, 2023     Rudder, final assembly - (1 hour)       Category: Fin & Rudder
Fitted the spar assembly to the rivetted left and right skins and attached spar to the shear clips, starting to final rivet the structure, the trailing edge rivets are the last items to be installed.


 
Jan 28, 2023     Rudder pre-assembly - (1 hour) Category: Fin & Rudder
Completed countersinking of the trailing edge wedge and have trial assembled the left and right skins plus wedge, happy with the way that the skins join down the trailing edge.
 
Jan 22, 2023     Rudder, final assembly - (1 hour)       Category: Fin & Rudder
Back rivetted the stiffners to the left side rudder skin and began machine countersinking the trailing edge wedge.


 
Jan 21, 2023     Rudder, final assembly - (1 hour) Category: Fin & Rudder
Back rivetted the skin stiffners to the right hand rudder skin and fitted the shear clips, left side skin is next then its onto trailing edge wedge.
 
Jan 21, 2023     Rudder pre-assembly - (1.5 hours)       Category: Fin & Rudder
Completed dimpling all parts and the skins and have clecoed the right side skin stiffeners into place ready to begin back rivetting and final assembly. Just broke the 200 hour mark on the project so far.


 
Jan 19, 2023     Rudder pre-assembly - (1 hour) Category: Fin & Rudder
Started dimpling the skins and stiffners in preparation for final assembly
 
Jan 14, 2023     Rudder pre-assembly - (2 hours)       Category: Fin & Rudder
Deburred and primed the left and right rudder skins, trimmed the trailing edge wedge to length and have preassembled it for final drilling, Majority of the holes do not need final drilling but some do, then skin can be dimpled ready to start installing the skin stiffners.


 
Jan 04, 2022     Rudder, parts preparation - (0.5 hour) Category: Fin & Rudder
Last two pairs of stiffners trimed, deburred and primed, first work in some months but wing and fuselage kits now not likely to arrive until May.
 
Oct 06, 2021     Assembly Rudder skeleton - (0.5 hour)       Category: Fin & Rudder
Two more pairs of rudder skin stiffners cleaned up and primed ready for pre-assembly, first work on the aircraft for a while.


 
Sep 21, 2021     Assembly Rudder skeleton - (0.5 hour)       Category: Fin & Rudder
Cleaned up and prepared plus primed several more shear clip and rudder skin stiffners, temporarily attached to the rear spar.


 
Sep 19, 2021     Part payment - Wings & Fuselage 2,500 USD Category: Fin & Rudder
Testing wire transfer to pay Vans outstanding balance, xe.com only about 1% cheaper but on what I owe that saves me several hundred dollars.
 
Sep 15, 2021     Rudder, parts preparation - (0.5 hour) Category: Fin & Rudder
Trimming and deburring of rudder skin stiffners and shear clips ready for priming
 
Sep 08, 2021     Assembly Rudder skeleton - (0.5 hour) Category: Fin & Rudder
Further priming of spar, prepared and attached counter balance rib.
 
Sep 01, 2021     Assembly Rudder skeleton - (0.5 hour) Category: Fin & Rudder
Not much time available today as still short of primer but have rivetted the doublers to the rudder spar and attached the lower rib.
 
Aug 31, 2021     Rudder, parts preparation - (1.5 hours) Category: Fin & Rudder
Deburring and final drilling of rudder spar, doubler plates and lower rib ready for priming and initial assembly.
 
Aug 29, 2021     Rudder, parts preparation - (1 hour) Category: Fin & Rudder
While I wait for lockdown to lift so I can get some primer I have gone back to preparing the parts for the rudder.
 
Aug 18, 2021     Vert Stabilizer, Final Assembly, Completed - (1 hour)       Category: Fin & Rudder
Rivetted the rear spar to the fin after double checking the rivets inside, combination of rivet gun and hand squeezer plus first three pop rivets. The fibreglass tip will be trimmed and fitted once the rudder is built.


 
Aug 14, 2021     Forward spar & rib rivets - (0.5 hour) Category: Fin & Rudder
After having the forward spar and rib rivets checked it was recommended that they be compressed a little more before I rivet on the rear spar of the fin after which they will be inaccessible.
 
Aug 07, 2021     Vert Stabilizer, Final Assembly, Rerivetting - (1 hour) Category: Fin & Rudder
Drilling out and replacing the rivets I was not too happy with, mostly where shop head was distorted.
 
Jul 29, 2021     Rudder, parts preparation - (1 hour) Category: Fin & Rudder
Used my new bandsaw to seperate the shear clips and rudder skin stiffeners where multiple and paired parts are a single component in the kit.
 
Jul 20, 2021     Vert Stabilizer, Final Assembly - (1.5 hours)       Category: Fin & Rudder
Completed priming the skin and dimpled the holes for flush rivets. Riveted the internal spars and ribs together and reattached the skin to the structure ready for rivetting of the forward spar to the skin.


 
Jul 15, 2021     rib and spar prining and dimpling - (1 hour) Category: Fin & Rudder
I have now primed all the ribs and front spar of the vertical stabilizer, dimpled ready to install the skin. Have not dimpled the holes that will be used to attach the stabilizer fairing and those holes are covered on the skin so no risk of putting in rivets where they are not supposed to be.
 
Jul 09, 2021     Prep, priming & dimpling ribs - (1 hour) Category: Fin & Rudder
Three of the five ribs now deburred, scuffed, primed and dimpled, working on last rib and forward spar then will start getting skin ready for final assembly.
 
Jul 03, 2021     Vert Stabilizer, Rear Spar, Rudder brackets - (1 hour)       Category: Fin & Rudder
Rivetted the rudder brackets to the rear spar, assembly of this now complete.


 
Jun 30, 2021     Vert Stabilizer, Rear Spar - (1 hour)       Category: Fin & Rudder
36 universal head AN470-AD4-6 and 12 countersunk AN426AD4-6 rivets installed to fix doubler to the spar. Next step is to attach the steel rudder brackets then onto final prep of the ribs and skin. I need to show this to an engineer to confirm its OK, but overall I'm pretty happy with my first serious rivetting effort.


 
Jun 28, 2021     Vert Stabilizer, Rear Spar - (1 hour)       Category: Fin & Rudder
Final drilled Vert Stabibilizer skin then dimpled the rivet holes on the rear spar flange for skin rivets, completed cleanup, prepped and primed ready to attach the rear spar doubler and rudder hinge brackets.


 
Jun 27, 2021     Vert Stabilizer, Pre-assembly - (1 hour)       Category: Fin & Rudder
Fully assembled vertical stailizer to test fit skin, match drilled holes into ribs, final drilled one side of skin.


 
Jun 25, 2021     VS Preassembly, Spars Ribs & Skin - (1 hour)       Category: Fin & Rudder
Countersinked the rear spar doubler and primed one side that fits up against rear spar, preassembled and final drilled holes for rib and spar rivets, tested fitted the skin, need to slightly straighten the ribs before final driling the skin. I need a bigger assembly table!!!


 
Jun 25, 2021     Rear spar doubler, prep - (1 hour) Category: Fin & Rudder
Deburred the VS rear spar doubler prior to countersinking and priming. dimpled the rear spar ready to match the countersinking in the doubler
 
Jun 20, 2021     VS Main Spar preassembly - (.5 hour) Category: Fin & Rudder
Final drilled rudder mounting brackets and main spar doubler to #30 for AD4 rivets. Lower rudder bracket is next then can debur and prime.
 
Jun 18, 2021     VS Front spar doubler primed and rivetted - (1.5 hours)       Category: Fin & Rudder
After cleaning up and priming the doubler plate for the vertical stabilizer front spar I dimpled six of the holes then rivetted it in place, one rivet maybe slightly over squeezed, am asking about that. Started pre-assembly of main spar of vertical stabilizer. Final drilled rudder attachment brackets to AN3 (#12 hole).


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.