EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
LMRPanther
-
Listing for Category : avionics
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (159)
Research
- (1)
Workshop
Empennage
- (6)
Fuselage
- (48)
Firewall
- (2)
Tail Feathers
- (20)
Wings
- (25)
Controls
- (10)
Avionics
- (8)
Lighting
- (3)
Instrument Panel
Landing Gear
- (5)
Engine
- (21)
Propeller
- (1)
Fuel System
- (5)
Interior Finish
- (1)
Paint / Decals
Inspection
- (3)
Tools
Builder Name:
Louis Rosner
-
Project:
Sport Performance - Panther
-
VIEW REPORTS
Total Hours:
800
Total Flight Time:
Total Expense:
$10.00
Start/Last Date:
Mar 15, 2021 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=LMRPanther
Home or Last Project Picture
Nov 24, 2023
Control stick wiring
- (2 hours)
Category: Avionics
Wire control stick with three conductor with shield Teflon wire. PTT and CWS connected to Ry stick button. Auto pilot disconnect wired to pilots left trim. Will need to find out a better solution for auto pilot disconnect.
Nov 21, 2023
Antennas
- (4 hours)
Category: Avionics
Attached com ads-b and transponder antennas to lower fuselage. Manufactured antenna wires with appropriate BNC and TNC connectors.
IMG_1646.jpeg
IMG_1645.jpeg
IMG_1647.jpeg
Nov 19, 2023
GPS Attachment
- (3 hours)
Category: Avionics
Manufactured GPS attachment shelf and secured to seat roll bar with appropriate hardware. Shortened control stick and installed control switches.
IMG_1625.jpeg
IMG_1624.jpeg
IMG_1623.jpeg
Jun 14, 2023
Installed PTOT static system
- (4 hours)
Category: Avionics
IMG_1008.jpeg
IMG_1009.jpeg
IMG_1010.jpeg
IMG_1011.jpeg
IMG_1012.jpeg
May 20, 2023
More wiring
- (6 hours)
Category: Avionics
Finished wiring of P mags. Additional cleanup of wires and ignition. Not yet the final product but decent. Finally flipped the switch. No smoke. A great day. Have to troubleshoot the alternator field which shows +12 V even with the alternator off. Possibly a wrong pin in the connector on the forward Fuselage cable.
IMG_0934.jpeg
IMG_0933.jpeg
IMG_0932.jpeg
IMG_0931.jpeg
IMG_0930.jpeg
Apr 11, 2023
More panel
- (3 hours)
Category: Avionics
Cut additional openings in panel for remote Avionics boxes
B5B54A0A-ADE2-44DD-A97B-1DA6898AB387.jpeg
Apr 09, 2023
HDX1100 mounted
- (4 hours)
Category: Avionics
Cut out in panel to template of HDX 1100. Secured with MK 1000–06 nut plates.
0F40A860-E669-42BF-8AC1-217A5816CF9F.jpeg
ACE5F094-D89F-438C-B5F7-2C06228BEE61.jpeg
Apr 03, 2023
Avionics started
- (4 hours)
Category: Avionics
Mounted several boxes with 8-32 rivnuts.
Removed starter in preparation for 12v exchange. Measured hose lengths in preparation for order of completed conductive Teflon hose package.
C23D1241-5BFD-4E5D-9A08-D114405D9244.jpeg
8117A954-AE2D-4C7D-89D8-BAE9E38684E1.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.