Jan 12, 2024     Fuel flow test - (2 hours) Category: Fuel System
Boost fuel pump flow tested. Supplies 48 gallons per hour. Replaced O-rings on pitot and AOA to fuselage interconnect. Minor additional adjustments made to left wing spar pass through during folding and unfolding operation.
 
May 12, 2023     Fuel vents - (2 hours)       Category: Fuel System


 
May 01, 2023     Fuel controller reinstalled - (5 hours)       Category: Fuel System
Fuel control unit re-installed with sniffle valve placed by Performance airflow. All fuel hoses connected fuel flow transducer mounted to firewall with an offset bracket, allowing a more gentle band for the firewall fuel pass-through connection. Some additional securing of wires and hoses to reduce chafing.
Final bend for crank case, ventilation line, so that oil will drip on the exhaust stack and burn away.


 
Mar 25, 2023     Boost pump installation - (4 hours)       Category: Fuel System
Finished installation of boost pump. Needed a 1/8 inch shim under the rear of the assembly so that a fitting could be screwed onto the filter.
Installed fuel pressure and oil, pressure and oil temperature sensors. Hydraulic sealant applied. Torqued temperature sensor 160 inch pounds. Drilled a small hole into the side of the sensor facets and drilled an additional 16th inch hole into the oil adapter tab to allow placement of safety wire for temperature sensor.


 
Mar 09, 2023     Cockpit fuel lines - (6 hours)       Category: Fuel System
Fabricated and assembled cockpit, fuel lines, utilizing vibrant performance, 6AN fuel hose and fittings,. Completed assembly and installation of oil, cooler lines, utilizing vibrant performance, 8 AN fuel hose and fittings.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.