EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Star
-
Listing for Category : inspection
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (647)
Research
- (15)
Workshop
- (20)
Empennage
- (5)
Fuselage
- (40)
Firewall
- (41)
Tail Feathers
- (5)
Wings
- (113)
Controls
- (20)
Avionics
- (28)
Lighting
Instrument Panel
- (51)
Landing Gear
- (23)
Engine
- (169)
Propeller
- (17)
Fuel System
- (42)
Interior Finish
- (49)
Paint / Decals
Inspection
- (8)
Tools
- (1)
Builder Name:
Phil Martineau
-
Project:
Glastar
-
VIEW REPORTS
Total Hours:
1893.85
Total Expense:
$31242.81
Start/Last Date:
Jun 26, 2021 - No Finish Date
Engine:
Lycoming IO360
Propeller:
Hartzell constant speed
Panel:
Garmin
Friendly URL:
https://eaabuilderslog.org?s=Star
Home or Last Project Picture
Feb 01, 2022
EAA Tech Counselor Visit
- (2 hours)
Category: Inspection
Mike Hilger made initial visit to this project. Valuable inspection and discussions.
Nov 29, 2021
Remeasured the dihedral angles again.
- (1.5 hours)
Category: Inspection
Excellent results. 1.4 to 1.5 , and a few spots at 1.3 degrees.
Nov 27, 2021
A dog's breakfast
- (2.4 hours)
Category: Inspection
A little bit of everything. workshop, parts ordering, clevis pin replacements, etc.
Aug 14, 2021
Control Yoke Assembly Removal
- (3.5 hours)
Category: Inspection
Removed and inspected control yoke assembly.
Reinstalled...very difficult.
Aug 14, 2021
Shearwebs and ANOR
- (3 hours)
Category: Inspection
Reviewed sections VIII and IX for ANORS applicability.
Detailed inspection of shearwebs as well as templates.
Aug 13, 2021
Dual Brakes
- (2.5 hours)
Category: Inspection
Section IV step 4, page 30. Inspection of pilot and copilot rudder and brake pedals.
Email ordered dual brake option from Glasaier. p/n 991-01000-01
Aug 12, 2021
Hang rudder
- (3 hours)
Category: Inspection
Vertical fin spar at bottom needs rework and anti-corrosion.
Rudder travel 25 degrees both sides OK.
Missing drain holes in bulkhead D and E
Aug 11, 2021
Removal of seat frames, seat pans, seats & Inspection
- (4 hours)
Category: Inspection
Removal basically identical to Sportsman twtt work. Then to ongoing inspection of prior work to step 40
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.