Aug 21, 2021
Day 1
- (6 hours)
Category: Workshop
This was day one of Chapter 524's Veteran's Build. The 750 Cruzer airframe kit was donated to the chapter with the intent of giving local veterans the opportunity to build and eventually fly this aircraft as part of their own club. Today was spent on inventory and the building of a suitable workbench using the crate as a base. A lot was done in a remarkably short time. The only glitch seems to be that we are missing almost all the parts for the vertical stabilizer. Not only are the parts missing but there is no inventory sheet for those parts. So somehow it appears they weren't included. The next session will probably be a little workshop on the use of tools and techniques presented by Jerry Blake perhaps followed by some actual building. That session will be next Saturday, August 28th.