Aug 12, 2023
Day 74
- (15 hours)
Category: Controls
After a long hiatus due to other things going on, a small group met to organize and plan for a re-start of the build. Most of the time was devoted to discussion of next steps and a reassessment of the 750's current status. The engine has been delayed, but is supposedly nearing completion. Measurements were taken and the supports for the horizontal stabilizer were riveted to the fuselage. This was in preparation for a test rigging of tail surfaces and cables. Zenith's plans call for a small bungee cord rigged to separate the elevator cables. Not happy with that arrangement, plans are in the works to install a more permanent and dependable pulley instead. Plumbing for the fuel system was also discussed and parts located.