EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RV-6A
-
Listing for Category : workshop
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (35)
Research
- (2)
Workshop
- (4)
Empennage
Fuselage
- (4)
Firewall
Tail Feathers
Wings
- (9)
Controls
- (1)
Avionics
- (1)
Lighting
Instrument Panel
Landing Gear
Engine
- (1)
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
- (2)
Logistics
- (5)
General
- (6)
Builder Name:
Nathan Schenk
-
Project:
Vans - RV-6A
-
VIEW REPORTS
Total Hours:
105.5
Total Flight Time:
Start/Last Date:
Dec 05, 2021 - No Finish Date
Engine:
Lycoming 0-320-A1A
Friendly URL:
https://eaabuilderslog.org?s=RV-6A
Home or Last Project Picture
Mar 02, 2024
Assembled some “free” shelves!
- (3 hours)
Category: Workshop
IMG_1544.jpeg
IMG_1515.jpeg
IMG_1486.jpeg
Dec 08, 2021
Organized small parts
- (2 hours)
Category: Workshop
Organized the small parts into boxes.
This is just the first step in the organization process.
Began reading the construction manual. This is going to be quite the project!
Found one of the original packing slips. Looks like the kit was originally purchased in 1993.
IMG_4367.jpg
IMG_4368.jpg
IMG_4369.jpg
IMG_4370.jpg
IMG_4371.jpg
IMG_4372.jpg
IMG_4373.jpg
Dec 05, 2021
Clean and prepare the workshop
- (6 hours)
Category: Workshop
Cleaned up the workshop, found enough floor to store the aircraft.
IMG_4365.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.