Project: "Aluminaire"   -  
            Listing for Category : lighting
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Glenn Gordon   -  
Project:   Timber Tiger - ST-L Clipped-wing   -   VIEW REPORTS
Total Hours:583.9
Start/Last Date:Jun 01, 2022 - No Finish Date
Engine:Rotax 912ULS with big bore cylinder upgrade
Propeller:Sensenich Ground Adjustable
Panel:VFR / Glass / ADS-B / Comm / Xpndr / 2 Axis Autopilot
 
Friendly URL: https://eaabuilderslog.org?s="Aluminaire"

Home or Last Project Picture

Nov 17, 2023     Installed tip light mounts. Added micro balloon slurry. - (2 hours)       Category: Lighting
Installed tip light mounts. Added micro balloon slurry.


 
Jan 14, 2024     Added lighting wiring grommets and wiring to wings prior to cover. - (2 hours)       Category: Lighting
Added lighting wiring grommets and wiring to wings prior to cover.


 
Dec 02, 2023     Fabrication, positioning, and installation of wing avionics bay access panel. - (5 hours)       Category: Lighting
Fabrication, positioning, and installation of wing avionics bay access panel.


 
Oct 08, 2023     Complete Landing Light opening mounts - (2 hours)       Category: Lighting
Complete Landing Light opening mounts


 
Nov 08, 2023     Painted Taxi and Landing Light Bays - (2 hours)       Category: Lighting
Painted Taxi and Landing Light Bays


 
Aug 17, 2023     Navigation, Position, and Strobe Light mount 3D Print & Test Fit. - (3 hours)       Category: Lighting
Navigation, Position, and Strobe Light mount 3D Print & Test Fit.


 
Aug 15, 2023     Navigation, Position, and Strobe Light mount design. - (6 hours)       Category: Lighting
Navigation, Position, and Strobe Light mount design.


 
Jul 15, 2023     Landing light openings cut and finished. - (4 hours)       Category: Lighting
Landing light openings cut and finished.


 
Jul 02, 2023     Landing Light Mount Fabrication. - (7 hours)       Category: Lighting
Landing Light Mount Fabrication.


 
Jun 01, 2023     Landing Light Design, CAD. - (20 hours)       Category: Lighting
Landing Light Design, CAD.


 
Jul 05, 2023     Leading edge landing light cutout layout. - (2 hours)       Category: Lighting
Leading edge landing light cutout layout.


 
NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.