EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
cwagner
-
Listing for Category : fuel system
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (87)
Research
- (1)
Inventory
- (1)
Workshop
- (1)
Fuselage
- (45)
Empennage
- (10)
Firewall
Tail Feathers
Wings
- (17)
Controls
- (4)
Avionics
- (1)
Lighting
Instrument Panel
Landing Gear
- (2)
Engine
Propeller
Fuel System
- (2)
Interior Finish
Paint / Decals
- (3)
Inspection
Tools
Builder Name:
Chris Wagner
-
Project:
Tucano Replica
-
VIEW REPORTS
Total Hours:
612
Total Flight Time:
Start/Last Date:
Apr 12, 2022 - No Finish Date
Engine:
Rotax 912iS
Panel:
Advance Flight Systems
Friendly URL:
https://eaabuilderslog.org?s=cwagner
Home or Last Project Picture
Nov 26, 2023
Fuel Tank Assembly
- (4 hours)
Category: Fuel System
Complete assembly of the second wing tank.
I used the support brackets which made it mush easier to assemble and was less messy.
I pressure test it in a few days.
Assembling
Applying sealant
Riveting
Completed fuel tanks
Cleco'ing
Nov 19, 2023
Fuel tanks
- (8 hours)
Category: Fuel System
Began assembly of the two wing fuel tanks.
The construction is similar to a flap - but thicker.
However, fuel tank sealant has to be applied during the final assemble - messy task.
Fuel tanks pop rivets are used - something I've never seen before.
Completed the final assembly of one of the tanks. Will need to add more sealant on the outside.
Once the sealant is dry - in a few days - I'll check for leaks.
apllying sealant to ribs
ribs with trap door to reduce fuel movement inside the tanks
cleaning off excess sealant
fuel tanks pop rivet
riveting fuel tank
initial assembls
final assembly with sealant applied
added another layer of sealant around the edges the