EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
pchang
-
Listing for Category : tail feathers
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (108)
Tail Feathers
- (4)
Empennage
- (2)
Wings
- (94)
Research
Workshop
Fuselage
Firewall
Controls
Avionics
- (1)
Engine
Lighting
Instrument Panel
Landing Gear
Propeller
Fuel System
- (1)
Interior Finish
Paint / Decals
Inspection
Tools
- (5)
Craddles
- (1)
Builder Name:
Paul Chang
-
Project:
Vans - RV-10
-
VIEW REPORTS
Total Hours:
619.75
Total Flight Time:
Start/Last Date:
Jun 22, 2022 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=pchang
Home or Last Project Picture
Oct 12, 2022
Section 9 : Elevators
- (42.5 hours)
Category: Tail Feathers
Built the Elevators, first time using ProSeal.
20221210_175627.jpg
20221211_125501.jpg
20220921_141459.jpg
20220924_072036.jpg
20220924_163952.jpg
20220925_085648.jpg
20220925_101717.jpg
20220925_141252.jpg
20220928_094354.jpg
20221001_121627.jpg
20221003_192928.jpg
20221007_095811.jpg
20221008_132104.jpg
20221008_132113.jpg
20221012_090733.jpg
20221012_091247.jpg
20221012_134830.jpg
20221012_135950.jpg
20221012_142442.jpg
20221012_182641.jpg
20221013_102627.jpg
20221013_132505.jpg
20221013_175852.jpg
20221014_164807.jpg
20221017_144753.jpg
20221018_160720.jpg
20221018_160723.jpg
20221207_095538.jpg
20221209_161751.jpg
Aug 03, 2022
Section 8 :Horizontal Stabilzer
- (30.5 hours)
Category: Tail Feathers
Built the Horizontal stabilizer per instruction. Largest piece to date.
20220803_104620.jpg
20220805_101108.jpg
20220805_101122.jpg
20220805_141850.jpg
20220805_164320.jpg
20220805_172008.jpg
20220809_093811.jpg
20220809_093904.jpg
20220809_094709.jpg
20220819_091820.jpg
20220819_093914.jpg
20220819_192745.jpg
20220820_095407.jpg
20220820_113137.jpg
20220820_113139.jpg
20220821_103827.jpg
20220902_094403.jpg
20220903_101650.jpg
20220904_100700.jpg
20220905_104830.jpg
20220905_120746.jpg
20220905_120750.jpg
20220905_120758.jpg
20220906_163551.jpg
20220916_130634.jpg
20220918_182059.jpg
20220918_182103.jpg
20220918_182106.jpg
20220919_091630.jpg
20220921_084900.jpg
Jul 25, 2022
Section 7: Rudder
- (42.6 hours)
Category: Tail Feathers
Rudder build, took a lot of time making sure everything was fitting properly. Primed parts
20220625_081705.jpg
20220627_093423.jpg
20220628_154434.jpg
20220701_131842.jpg
20220702_143326.jpg
20220702_174738.jpg
20220703_160546.jpg
20220704_102701.jpg
20220704_134559.jpg
20220729_133816.jpg
20220729_133824.jpg
20220729_191236.jpg
20220624_132957.jpg
20220711_201234.jpg
20220711_205536.jpg
Jul 08, 2022
Section 6 Vertical Stabilizer
- (23.4 hours)
Category: Tail Feathers
Right out of the gate, made a few mistakes and had to order parts to this section up to 3 times. This took much longer than needed but glad it did. Made mistakes that taught me directions to be aware of and mistakes to avoid.
20220801_110324.jpg
20220801_151554.jpg
20220801_160257.jpg
20220801_194818.jpg
20220801_194827.jpg
20220624_132957.jpg
20220711_201234.jpg
20220712_194840.jpg
20220713_162502.jpg
20220714_093555.jpg
20220730_112851.jpg
20220801_094546.jpg
20220801_095036.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.