EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
carlocilliers
-
Listing for Category : Show all entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (75)
Research
Workshop
Empennage
Fuselage
- (2)
Firewall
Tail Feathers
Wings
- (70)
Controls
- (2)
Avionics
Lighting
Instrument Panel
Landing Gear
- (1)
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
carlo cilliers
-
Project:
Bearhawk - Patrol
-
VIEW REPORTS
Total Hours:
376.8
Total Flight Time:
Total Expense:
$1899.67
Start/Last Date:
Sep 17, 2023 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=carlocilliers
Home or Last Project Picture
Mar 18, 2024
torque tube
- (1.5 hours)
Category: Controls
machined rear slot in stick torque tube
Mar 17, 2024
tank ribs
- (45 hours)
Category: Wings
drilled and riveted fuel tank support ribs
Mar 16, 2024
rib drilling
- (2 hours)
Category: Wings
drilled center ribs to spars
Mar 14, 2024
fuel tank ribs
- (4 hours)
Category: Wings
drilled and riveted fuel tank ribs and false spar
Mar 13, 2024
brake caliper flange
- (3 hours)
Category: Landing Gear
turned and welded flanges for caliper attachment
Mar 13, 2024
false spar brackets
- (2.5 hours)
Category: Wings
prosealed and riveted false spar rib attach brackets
Mar 13, 2024
tank ribs
- (3.5 hours)
Category: Wings
drilled fuel tank end ribs to spars and tank spar
Mar 11, 2024
rib dry fitment
- (3 hours)
Category: Wings
dry fitted outboard ribs to spars
Mar 10, 2024
spar setup
- (3.5 hours)
Category: Wings
moved rh wing to airport. setup and leveled spars in wing jig for rib installation.
Feb 28, 2024
rib attachment
- (4 hours)
Category: Wings
Drilled Rib T/E to rear spar
Feb 27, 2024
ribs
- (3.5 hours)
Category: Wings
Drilled nose of center ribs to spar brackets
Feb 25, 2024
spar leveling
- (5 hours)
Category: Wings
leveled and set up spars on horizontal wing jig
Feb 24, 2024
Steel brackets
- (6 hours)
Category: Fuselage
Fabricated various steel brackets for fuselage
Feb 15, 2024
ribs
- (5 hours)
Category: Wings
Trimmed and filed forward edges of center ribs for spar cap allowance
Feb 15, 2024
ribs
- (5 hours)
Category: Wings
Trimmed and filed forward edges of center ribs for spar cap allowance
Feb 01, 2024
spars
- (3.5 hours)
Category: Wings
Drilled rib supports
Jan 30, 2024
spars
Category: Wings
Drilled rib attach brackets to main spars
Jan 24, 2024
spars
- (3 hours)
Category: Wings
riveted rib brackets and spacer onto RH spar
Jan 24, 2024
spars
- (25 hours)
Category: Wings
clamped and laid out holes on main spar caps
Jan 23, 2024
spars
- (2 hours)
Category: Wings
rib brackets on main spar
Jan 20, 2024
spars
- (7 hours)
Category: Wings
drilled capstrips to main spar web
Jan 19, 2024
spars
- (4 hours)
Category: Wings
drilled capstrips to webs
Jan 17, 2024
spars
- (3 hours)
Category: Wings
clamped and laid out holes on main spar caps
Jan 16, 2024
main spar
- (3 hours)
Category: Wings
set up and clamped main spar web to fixture
Jan 15, 2024
rear spar
- (7 hours)
Category: Wings
finalized riveting on rear spars
Jan 14, 2024
rear spars
- (6 hours)
Category: Wings
Riveted caps and brackets on rear spars
Jan 13, 2024
Rear Spars
- (5.5 hours)
Category: Wings
Riveted capstrips on rear spars
Jan 09, 2024
rear spar
- (3 hours)
Category: Wings
drilled rh rear spar rib brackets
Jan 08, 2024
rear spar
- (3 hours)
Category: Wings
drilled capstrips to web on RH rear spar
Jan 03, 2024
ailerons
- (2 hours)
Category: Wings
drilled aileron nose skins and tip gussets
Jan 03, 2024
aileron
- (2.5 hours)
Category: Wings
Drilled aileron nose skins
Jan 01, 2024
flaps
- (3.5 hours)
Category: Wings
drilled flap nose skins
Dec 30, 2023
flaps
- (2.5 hours)
Category: Wings
drilled and dimpled flap nose skins
Dec 26, 2023
flaps
- (2.5 hours)
Category: Wings
riveted flap nose skin
Dec 25, 2023
flaps
- (3 hours)
Category: Wings
dimpled flap nose skins and assembly
Dec 24, 2023
flaps
- (35 hours)
Category: Wings
match drilled nose skin to flaps
Dec 23, 2023
flaps
- (4 hours)
Category: Wings
riveted trailing edges and clamped a nose skin
Dec 21, 2023
ailerons
- (3 hours)
Category: Wings
bent and clamped lh aileron nose skin
Dec 20, 2023
ailerons
- (4 hours)
Category: Wings
finish riveted aileron
Dec 20, 2023
ailerons
- (2 hours)
Category: Wings
riveted aileron
Dec 19, 2023
flaps
- (3.5 hours)
Category: Wings
drilled gussets and TE to flaps
Dec 12, 2023
aileron
- (2 hours)
Category: Wings
drilled and dimpled outer nose skins to aileron
Dec 11, 2023
flaps riveting
- (2.5 hours)
Category: Wings
riveted flap ribs to spar
Dec 09, 2023
ailerons and flaps
- (8.5 hours)
Category: Wings
riveted flap nutplates. primed all gussets and hinges.drilled aileron gussets
Dec 08, 2023
ailerons
- (3 hours)
Category: Wings
riveted aileron structures
Dec 07, 2023
ailerons
- (6 hours)
Category: Wings
riveted aileron structures
Dec 06, 2023
aileron gussets
- (3 hours)
Category: Wings
bent flanges on aileron end rib gussets
Dec 05, 2023
aileron nose skin
- (2.5 hours)
Category: Wings
drilled 1 aileron nose skin to nose ribs
Dec 04, 2023
spars
- (3 hours)
Category: Wings
cut main spar cap strips from 4 by 12 sheets. Glued aileron mass balance tubes into aileron nose ribs
Dec 02, 2023
cap strips
- (4 hours)
Category: Wings
cut rear spar and some main spar cap strips from 4 by 12 sheets
Nov 28, 2023
aileron ribs
- (2.5 hours)
Category: Wings
drilled and clecoed aileron rear ribs to angles
Nov 23, 2023
ailerons
- (2 hours)
Category: Wings
cut aileron end rib gussets
Nov 12, 2023
spar webs
- (5 hours)
Category: Wings
Cutting of main spar lightening holes and root shape
Nov 11, 2023
spar webs
- (7 hours)
Category: Wings
Cutting of rear spar lightening holes and layout of front spar holes
Nov 10, 2023
Spar webs
- (6.5 hours)
Category: Wings
layout and cutting of rear spar webs
Oct 28, 2023
center ribs
- (2 hours)
Category: Wings
riveted center rib stiffeners
Oct 25, 2023
priming
- (3.5 hours)
Category: Wings
scuffed and primed center ribs
Oct 24, 2023
hinge fittings
- (3.5 hours)
Category: Wings
Finished welding flap hinge brackets and scotch brited center ribs
Oct 24, 2023
wing root and spar joint fittings
- (8 hours)
Category: Wings
cut and laid out spar fittings
Oct 23, 2023
hinge fittings
- (4 hours)
Category: Wings
fabricated and welded aileron and flap hinge brackets
Oct 21, 2023
hinge brackets
- (8 hours)
Category: Wings
fabricated and welded aileron and flap hinge brackets
cost is waterjet process
Oct 20, 2023
root rib doublers and rib attach angles
- (3 hours)
Category: Wings
fabricated more doublers and angle brackets for center ribs
Oct 19, 2023
misc brackets
- (2 hours)
Category: Fuselage
cut some fuselage lower brackets
Oct 19, 2023
priming
- (3 hours)
Category: Wings
scuffed and primed nose and .032 center ribs
spruce.pdf
Oct 18, 2023
rib stiffeners
- (5 hours)
Category: Wings
drilled and riveted rib stiffener angles
Oct 17, 2023
hammer forming
- (4 hours)
Category: Wings
hammer formed and fluted nose ribs
Oct 16, 2023
hammer forming
- (4.5 hours)
Category: Wings
hammer formed and fluted nose ribs
Oct 15, 2023
hydroforming
- (6.5 hours)
Category: Wings
hydroformed nose and center ribs
Oct 11, 2023
flap and aileron ribs
- (2 hours)
Category: Wings
routed ribs
Oct 10, 2023
center rib routing
- (4.5 hours)
Category: Wings
used templates from another builder to rout center ribs
Oct 09, 2023
rib routing
- (4.5 hours)
Category: Wings
routed out nose ribs with template supplied by fellow builder
Sep 17, 2023
flap quadrant
- (1.5 hours)
Category: Controls
laid out and cut the flap quadrant
Sep 17, 2023
wing spacers
- (4 hours)
Category: Wings
rib spacers and splice plates
Sep 17, 2023
wing fittings
- (3 hours)
Category: Wings
Main spar root spacers and splice plate
Sep 15, 2023
spar fittings
- (3.8 hours)
Category: Wings
cut out spar root fittings
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.