EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Summary
Hours
Entries
Expenses
Dtl. Expenses
Flight Time
Viewers
Categories
Project:
HMCRV12
- Project Summary
- Optional PDF document function
Add entry descriptions
Project PDF with:
Title Only
Title & Description
All
All w/ Picture Title
-
Last Entry First
First Entry First
Create PDF
Entry #
Created
Title
Category
Hours
Cost
# Pictures
103
Apr 26, 2023
Ready for flight?
Wings
2.5
$0.00
1
102
Apr 19, 2023
Post Hanger Trip
Rudder
2
$0.00
3
101
Apr 12, 2023
Baby's first steps!
Landing Gear
0.5
$0.00
3
100
Apr 05, 2023
Greasing parts
Landing Gear
$0.00
1
99
Apr 05, 2023
Frontal landing gear support
Rudder
$0.00
1
98
Apr 05, 2023
Flap crank assembly
Rudder
$0.00
1
97
Mar 22, 2023
Vans RV-7 Rudder
Rudder
3.5
$0.00
1
96
Mar 22, 2023
Engine mount
Engine
3.5
$0.00
0
95
Mar 22, 2023
Flaperon pushrod
Wings
3.5
$0.00
1
94
Mar 22, 2023
Hinges for lower cowl
Fuselage
3.5
$0.00
1
93
Mar 22, 2023
Roll Bar
Fuselage
3.5
$0.00
1
92
Mar 08, 2023
Assembled rear bulkhead
Fuselage
$0.00
1
91
Mar 08, 2023
F1202 B firewall panelbase
Fuselage
$0.00
0
90
Mar 08, 2023
Attaching the rollbar
Fuselage
$0.00
1
89
Mar 01, 2023
canopy rib
Fuselage
3.5
$0.00
1
88
Mar 01, 2023
flap crank
Fuselage
3.5
$0.00
1
87
Mar 01, 2023
roll bar
Fuselage
3.5
$0.00
1
86
Mar 01, 2023
control stick rod
Controls
3.5
$0.00
1
85
Feb 22, 2023
Sealing the Deal (Deal = Firewall)
Fuselage
3.5
$0.00
8
84
Feb 22, 2023
More exciting photos of our work on the fuselage (+ rudder)!
Workshop
3.5
$0.00
8
83
Feb 08, 2023
2/8/23 Assorted Projects!
Fuselage
3.5
$0.00
5
82
Jan 18, 2023
First day working with the new spring team!
Fuselage
1.5
$0.00
6
81
Dec 07, 2022
Last Day! Fall 2022
Workshop
3
$0.00
3
80
Nov 30, 2022
Riveting is riveting!
Workshop
3
$0.00
5
79
Nov 16, 2022
Build Update!
Workshop
$0.00
5
78
Nov 02, 2022
Working on the airplane!
Fuselage
3
$0.00
6
77
Oct 12, 2022
Fuselage update
Fuselage
3
$0.00
3
76
Sep 21, 2022
Progress Journal 09/21/33
Empennage
3
$0.00
4
75
Sep 14, 2022
Fuselage Updates
Fuselage
3
$0.00
0
74
Sep 07, 2022
First Aerolab of Fall 2022!
Workshop
3
$0.00
4
73
Apr 27, 2022
Empennage Complete
Empennage
$0.00
0
72
Mar 23, 2022
Riveting Stiffening Clips
Wings
$0.00
1
71
Mar 23, 2022
Pushrod to actuator to stabilator
Wings
$0.00
1
70
Mar 23, 2022
Riviting wing tips skins
Wings
$0.00
2
69
Mar 02, 2022
Wing Fairing Electrical
Wings
2
$0.00
1
68
Mar 02, 2022
Electrical Work on Wings
Wings
2
$0.00
1
67
Mar 02, 2022
Positional Lights Installed
Wings
2
$0.00
2
66
Feb 23, 2022
Empennage tip fairings
Empennage
5
$0.00
1
65
Feb 23, 2022
Wing lights
Wings
3
$0.00
1
64
Feb 23, 2022
Wing tip
Wings
2
$0.00
1
63
Feb 23, 2022
Stabilator Fairings
Stabilator
3
$0.00
1
62
Dec 08, 2021
Stabilator Assembly
Stabilator
2
$0.00
1
61
Dec 08, 2021
Wing Lights
Wings
2
$0.00
2
60
Dec 08, 2021
Building the Servo
Empennage
1.5
$0.00
1
59
Dec 08, 2021
Tailcone Assembly
Tailcone
3
$0.00
2
58
Dec 01, 2021
Light covers
Lighting
3
$0.00
1
57
Dec 01, 2021
Clevis alignment
Empennage
1
$0.00
1
56
Dec 01, 2021
Fitting the stabilator assembly to the tailcone
Empennage
2
$0.00
2
55
Dec 01, 2021
Riveting install doublers to servo tray
Tailcone
1.5
$0.00
1
54
Dec 01, 2021
Gluing felt into the tool cabinet
Tools
0.5
$0.00
1
53
Nov 17, 2021
Riveting skins to stabilator
Stabilator
3
$0.00
1
52
Nov 17, 2021
Riveting the skins to the wing
Wings
3
$0.00
1
51
Nov 17, 2021
Riveting skins to tailcone
Tailcone
3
$0.00
1
50
Nov 03, 2021
Stabilator-- mass riveting
Stabilator
2.5
$0.00
0
49
Nov 03, 2021
Attaching skin, wires to tailcone
Tailcone
2.5
$0.00
1
48
Nov 03, 2021
Wing Light Installation
Wings
2.5
$0.00
1
47
Nov 03, 2021
Stripped Bolt Extraction Process
V Stabilizer
2.5
$0.00
2
46
Oct 27, 2021
Vertical Stabilizer Skins
V Stabilizer
1.5
$0.00
1
45
Oct 27, 2021
Stabilator skins
Stabilator
1.5
$0.00
2
44
Oct 27, 2021
Wing skins
Wings
1.5
$0.00
1
43
Oct 27, 2021
Installing the static air system
Tailcone
1.5
$0.00
3
42
Oct 20, 2021
Stabilator Ribs
Stabilator
2.5
$0.00
3
41
Oct 20, 2021
Tailcone fuselage bulkhead and skins
Tailcone
2.5
$0.00
3
40
Oct 20, 2021
Prepping and attaching V Stabilizer Skin
V Stabilizer
2.5
$0.00
2
39
Oct 20, 2021
Wing Tips
Wings
2.5
$0.00
2
38
Oct 13, 2021
Bending tabs on wing tips
Wings
2.5
$0.00
1
37
Oct 13, 2021
Constructing tailcone-fuselage bulkhead
Tailcone
$0.00
1
36
Oct 13, 2021
Assembling tailcone
Tailcone
$0.00
1
35
Oct 13, 2021
aft spar for stabilator
Stabilator
$0.00
1
34
Oct 13, 2021
Fore spar for stabilator
Stabilator
2.5
$0.00
1
33
Oct 13, 2021
Riveting spar caps (v. stabilizer)
V Stabilizer
2.5
$0.00
1
32
Oct 06, 2021
Assembling ribs for vertical stabilizer
V Stabilizer
3
$0.00
1
31
Oct 06, 2021
Assembling spar cap assembly
Stabilator
3
$0.00
1
30
Oct 06, 2021
Match drilling Fuselage bulkhead
Tailcone
3
$0.00
1
29
Oct 06, 2021
Priming and sealing the Wing Walks
Wings
3
$0.00
1
28
Oct 06, 2021
Assembling Tailcone Skins
Tailcone
3
$0.00
1
27
Sep 29, 2021
Deburring Tailpieces
Tailcone
3
$0.00
1
26
Sep 29, 2021
Affixing Rudder Skin
Rudder
3
$0.00
1
25
Sep 29, 2021
Match Drilling Piano Hinges
AntiServoTab
3
$0.00
1
24
Sep 29, 2021
Inspecting wing ribs
Wings
3
$0.00
1
23
Sep 29, 2021
Assembling vertical stabilizer hinges
V Stabilizer
3
$0.00
1
22
Sep 29, 2021
Attatching spar caps to the spars
Stabilator
3
$0.00
1
21
Sep 22, 2021
Riveting the wings
Wings
3
$0.00
2
20
Sep 22, 2021
Riveting the rudder
Rudder
3
$0.00
2
19
Sep 22, 2021
Riveting Anti-Servio Tab
AntiServoTab
3
$0.00
2
18
Sep 22, 2021
Fabricating the skid bracket for the tail cone
Tailcone
3
$0.00
2
17
Sep 22, 2021
Assembling the spar cap for the stabilator
Stabilator
3
$0.00
1
16
Sep 22, 2021
Preparing the spar for the vertical stabilizer
V Stabilizer
3
$0.00
1
15
Sep 15, 2021
Hinge Angle and Horn Attach Angle for Stabilator
Stabilator
3
$0.00
1
14
Sep 15, 2021
Rudder Spar Assembly
Rudder
3
$0.00
2
13
Sep 15, 2021
Drill bit holder — drilling holes for bits
DrillBitHold
3
$0.00
3
12
Sep 15, 2021
Attaching Wig Skins (left wing)
Wings
3
$0.00
2
11
Sep 15, 2021
Riveting Anti-Servo Tab ribs
AntiServoTab
3
$0.00
1
10
Sep 15, 2021
Fluting tailcone ribs
Tailcone
3
$0.00
1
9
Sep 15, 2021
Assembling Spar Cap for Vertical Stabilizer
V Stabilizer
3
$0.00
3
8
Sep 08, 2021
Bit Holder
DrillBitHold
$0.00
0
7
Sep 08, 2021
Hinge Angle Preparation
Stabilator
2.5
$0.00
1
6
Sep 08, 2021
Preparing AST Skin
AntiServoTab
2.5
$0.00
1
5
Sep 08, 2021
Hinge Bracket and Spar Cap Preparation
V Stabilizer
2.5
$0.00
2
4
Sep 08, 2021
Final Drilling and Deburring and Match Drilling
Rudder
2.5
$0.00
1
3
Sep 08, 2021
Left Wing Riveting and flaperons
Wings
2.5
$0.00
3
2
Sep 08, 2021
Breaking edges of the top and bottom skins of the tailbone
Tailcone
2.5
$0.00
2
1
Sep 01, 2021
First Build Day: Riveting the Wings
Wings
1
$0.00
4
------------
--------------
-------------
Totals
235.5
$0.00
179
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.