Project: BobCollins     -     Project Expenses by Category - By Week - By Month - By Quarter - By Year
CategoryDateExpense Entry title
Canopy    
 Aug 08, 2023$7.08 Canopy latch odds and ends
 Aug 09, 2023$26.00 Added canopy blocks
 May 02, 2024$29.25 Bonded foam block
Total for: Canopy$62.33  
 
Service B's    
 Feb 06, 2020$390.00 SB 19--08-26 Replaced nose gear
 Oct 26, 2020$245.08 Began SD-00001 fix
 May 15, 2021$674.13 Complied with SB-00023
 Mar 10, 2022$36.29 Getting ready to start on SB-00053
 Feb 07, 2023$51.22 SB fix kits arrive
 Mar 08, 2023$15.00 Complied with SB-00064-RV12
 May 08, 2023$15.00 Complied with Stabilator counterweight service bulletin
 Dec 25, 2023$60.33 SL-00070
 Apr 15, 2024$26.38 Completed SB-00088
Total for: Service B's$1513.43  
 
Empennage    
 Jan 14, 2017$3059.49 Kit inventory
 Jan 27, 2017$8.20 Completed rudder
 Feb 23, 2017$52.76 Riveted aft bulkhead
 Mar 25, 2017$11.90 Fit control surfaces to tailcone
 Mar 28, 2017$1.77 Completed the empennage subkit
 Jan 30, 2024$59.67 How to waste an afternoon
Total for: Empennage$3193.79  
 
Finishing    
 Apr 09, 2018$12185.51 Finishing kit arrived
 Jul 28, 2020$17.00 Canopy trimming
 Aug 02, 2020$6.00 More trimming and fitting of the top cowling
 Aug 10, 2021$34.64 Doing stuff I already did
 Sep 15, 2021$840.00 Starting over on rear window
 Oct 05, 2021$20.08 Cotter pins in wheel axles
 Aug 16, 2022$174.91 Routed new fuel valve cable
 Sep 06, 2022$23.99 Installed gear leg covers. Started fit of rear window
 May 29, 2023$20.46 Window drilled
 Jun 01, 2023$25.00 Finished final adjustments to rear window
Total for: Finishing$13347.59  
 
Lighting    
 Dec 05, 2022$117.85 Completed AOA installation, wire ID.
 Dec 24, 2022$12.03 Completed right wing electrical connector fix
 Mar 10, 2023$5.16 Miscellaneous puttering
Total for: Lighting$135.04  
 
Avionics    
 Jun 01, 2021$27997.12 Ordered avionics
 May 16, 2022$130.00 Enlarged holes
 May 26, 2022$14.99 Finished pilot-side wing pin sensor install
 Jul 19, 2022$443.89 Connections to stick grip, installed OAT
 Jul 20, 2022$42.21 Installed headphone jack and wing connectors
 Aug 03, 2022$86.92 Crimped on connectors. Added Bushing brackets
 Aug 22, 2022$10.00 Added chafing prevention to ADS-B IN antenna
 Oct 15, 2022$17.76 Installed GTR 200 and GTX 35R racks
 Oct 17, 2022$400.00 Putting stuff back together and installing more avionics
 Nov 06, 2022$20.00 Installed platenuts for instrument panel
 Dec 16, 2022$15.25 Prepped panel for MFD
 Jan 25, 2023$11.33 Closed up the panel
 Jan 29, 2023$536.83 Ground power unit
 Mar 05, 2023$35.84 Mucking around the engine
Total for: Avionics$29762.14  
 
Fuel System    
 Aug 27, 2021$73.64 Remade tank to vent fuel line
Total for: Fuel System$73.64  
 
Firewall    
 Jun 30, 2021$15.73 Heater cable installation
Total for: Firewall$15.73  
 
Engine    
 Jun 05, 2020$35503.04 Engine shipped
 Jun 27, 2020$70.00 Uncrated the ROTAX 912iS
 Jun 30, 2020$24.82 Completed Section 27
 Jul 05, 2020$30.00 Engine mount bolted to engine
 Jul 27, 2020$20.00 Started the cowling
 Jun 16, 2021$6.37 Overflow bottle and air filter
Total for: Engine$35654.23  
 
Propeller    
 Feb 22, 2021$13.02 Set propeller pitch
Total for: Propeller$13.02  
 
Fuselage    
 Nov 18, 2017$6323.00 Fuselage kit arrives
 May 27, 2020$249.98 Repainted rollbar. Primed canopy frame
Total for: Fuselage$6572.98  
 
Interior Finish    
 May 07, 2020$82.21 Primer and etching
Total for: Interior Finish$82.21  
 
Wings    
 Jun 05, 2017$11219.21 Wing kit arrives
Total for: Wings$11219.21  
 
 
Project Total:$101645.34  