EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
cbecker
-
Listing for Category : landing gear
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (163)
Avionics
- (1)
Controls
- (4)
Empennage
- (1)
Engine
Firewall
Fuel System
Fuselage
- (83)
Inspection
Instrument Panel
Interior Finish
Landing Gear
- (4)
Lighting
Paint / Decals
Propeller
Research
- (4)
Tail Feathers
- (9)
Tools
- (7)
Wings
- (34)
Flaps
- (2)
Workshop
Auto Entry
- (14)
Builder Name:
Charlie Becker
-
Project:
Pirate Cub
-
VIEW REPORTS
Total Hours:
103.5
Start/Last Date:
Jan 30, 2011 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=cbecker
Home or Last Project Picture
Aug 14, 2019
Welded gear leg step
- (1 hour)
Category: Landing Gear
Finish welded right gear leg step crossed tube.
4EE2AE37-6652-4B21-BD7E-A00A344FD44C.jpeg
9F0B0393-A436-457F-AC8E-23739E9189CE.jpeg
F5A8D556-6E64-4E24-A9A1-E057E1CF2D5C.jpeg
Aug 13, 2019
Landing Gear reinforcement
- (2 hours)
Category: Landing Gear
Added upper and middle cross tubes for landing gear. Top cross tube was 1/2 x.035 and middle was 7/8 x .035. The middle tube will also act as a step.
IMG_3821.jpg
IMG_3822.jpg
Aug 11, 2019
Added Step
- (1 hour)
Category: Landing Gear
Copying off what Javron Aircraft does, added a reinforcing crossmember that can also function as a step to get in and out of the aircraft. Tube is 7/8 x .035.
D0F818CC-1C5D-4295-BC50-EAFDA4D90BB4.jpeg
3DE19324-87DD-4E8C-A426-4A52F5636298.jpeg
7E22D1C0-F347-4546-A24B-14085D8C8314.jpeg
986A5121-56C8-4760-913A-E9BBF8AA6328.jpeg
Jan 31, 2012
Axles
Category: Landing Gear
IMG_8805.jpg
IMG_8806.jpg
IMG_8807.jpg
IMG_8809.jpg
IMG_8811.jpg
IMG_8812.jpg
IMG_8813.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.