Project: DaveBellairs   -  
            Listing for Category : controls
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1452.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Nov 09, 2023     Cabin air and parking brake cables - (1 hour)       Category: Controls
Fit cabin air and parking brake cables to the firewall in preparation of cutting to length once I get the panel back in. Plan to cut the plate from AFS to install it on the outside edges of the panel. Sat in the cockpit to see if I had knee room with those in place.


 
Nov 06, 2023     Throttle cable cont'd - (1 hour)       Category: Controls
Reinstalled the throttle cable with a cotter pin, torque seal, and secured the cable bolts.


 
Jul 04, 2022     Alt air door cable - (1 hour)       Category: Controls
Secured the alt air door cable to the bottom of the engine with an Adel clamp. Seems to work ok in the rare event I need to use it.


 
Jun 20, 2022     Cable control bracket - (1 hour)       Category: Controls
Trimmed and opened up the lower control bracket for the added cables. Left room on both edges for heated seat control knobs. Now to ship of to Advanced flight for power coat and labeling.


 
Jun 14, 2022     Throttle bracket - (1 hour)       Category: Controls
Drilled holes and trimmed lower throttle bracket.


 
Aug 04, 2020     Engine Controls - (5 hours)       Category: Controls
Installed mixture and throttle cable brackets and connected cable end bearings to ensure full throw and no interference with surrounding structures.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.