EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
DaveBellairs
-
Listing for Category : lighting
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (648)
Research
Workshop
- (4)
Empennage
- (14)
Fuselage
- (54)
Firewall
- (78)
Tail Feathers
- (40)
Wings
- (105)
Controls
- (6)
Avionics
- (145)
Lighting
- (13)
Instrument Panel
- (9)
Landing Gear
- (4)
Engine
- (159)
Propeller
- (1)
Fuel System
- (7)
Interior Finish
- (3)
Paint / Decals
- (6)
Inspection
Tools
Builder Name:
Dave Bellairs
-
Project:
Vans - RV-7
-
VIEW REPORTS
Total Hours:
1452.9
Total Flight Time:
Start/Last Date:
Jun 24, 2017 - No Finish Date
Engine:
Lycoming IO-360
Propeller:
Whirlwind 200RV
Panel:
Advanced Flight Systems Avionics
Friendly URL:
https://eaabuilderslog.org?s=DaveBellairs
Home or Last Project Picture
Feb 18, 2024
Tail light wire
- (2 hours)
Category: Lighting
Found a way to route the tail light wire through the aft bulkheads F-711 and F-712. I used a gap in the F-711 longeron stiffener to route the wire and drilled a hole in the aft bulkhead per Dwg OP 56-2. Used pitot tubing to protect the wire from chafing on the bulkheads and also for strain relief. It was the perfect size
IMG_3289.jpeg
IMG_3288.jpeg
IMG_3287.jpeg
IMG_3286.jpeg
Aug 16, 2023
Epoxied tail light backer
- (1 hour)
Category: Lighting
Mixed up some epoxy and glued the brass backer to the inside of the bottom rudder fairing. Took a little time to get the screws lined up due to the tight quarters.
IMG_2850.jpeg
IMG_2862.jpeg
Aug 15, 2023
Tail light installation
- (3 hours)
Category: Lighting
Added a pigtail to the FlyLeds tail light using some extra 18 AWG wire I had. Pulled out the bottom rudder fairing and installed the tail light. Super tight working quarters at the aft end of the bottom rudder fairing. Had to trim the interior of the fairing to allow installation of the aluminum backer. Not sure if I need the exterior aluminum plate or not. Sent an email to Paul at FlyLeds to determine a good course of action. Tested the light with a 9 volt battery and it worked great. Big warning about not using a 12 volt battery.
IMG_2851.jpeg
IMG_2849.jpeg
IMG_2852.jpeg
IMG_2848.jpeg
IMG_2847.jpeg
IMG_2846.jpeg
IMG_2845.jpeg
Jan 02, 2023
Tail light
- (1 hour)
Category: Lighting
Ran wire for tail light
E7D39CCC-2F3D-49E3-AB7C-AB77E63F99DE.jpeg
B2419D21-D1F9-4BBE-ADD6-B84B445FE15C.jpeg
Dec 21, 2022
Wires for left wing lights
- (1 hour)
Category: Lighting
Sam pulled/cut out old bulky wires for lights that came with the wing, circa 2005, and ran new ones for “The Works” LED lights from FlyLeds.
DC6A948B-55DC-4D25-BC95-C0234A8916F1.jpeg
2B5463A7-1F85-41A5-A897-60D07FB556AC.jpeg
863FAFAB-023F-4DA9-B2CF-ACE8A848AC4C.jpeg
F9483D32-A15B-4472-A4D3-C9E0F8C4F554.jpeg
Nov 08, 2021
Wingtip light lens
- (1 hour)
Category: Lighting
Tried to install last collimator lens into lens holder, but just wouldn't seat down far enough to engage hooks on lens holder. Emailed FlyLeds and said to return for new parts from Flyboys Accessories. All the other lens installed without a problem.
0180CB57-AC3D-4B94-9CC7-F025CE29AE09.jpeg
Oct 22, 2021
Right wingtip leds
- (4 hours)
Category: Lighting
Match drilled right forward facing PCB to right wingtip cove for nut plates. Installed 4 nut plates since the 5th on on top of the left wingtip was difficult to install and seemed excessive. Stripped and soldered wire ribbons that connect the two PCBs. Installed wire ribbons on outboard facing PCBs. Installed taxi/landing for fit. Installation was a PITA.
F6304869-FA05-464C-B739-744F2C0C5685.jpeg
FCC74A55-986C-41C9-99E2-38B395BEA7FF.jpeg
9203E845-A383-46D1-8E0D-B4251795D753.jpeg
086CC470-73CF-4738-B814-1E80B4572C92.jpeg
7FFB4B10-74D3-4A54-89E6-AA7D4C0F0F77.jpeg
848C2496-ECD6-481B-A5C9-91A4A72FF939.jpeg
Oct 22, 2021
FlyLeds taxi and lndg lights
- (6 hours)
Category: Lighting
Started part 3 of FlyLeds build. Riveted nut plates to boards. Single leg nut plate was a PITA due to the rivets being so close together made it difficult to squeeze separately. Damaged one of the Leds. Ordered some clear glue to cover bulb per instructions. Installed heat sinks and lens covers. Installed all lens but the one damaged led. Trimmed left (red) wingtip to allow room for backside components. Drilled nut plates on fwd facing wingtip cove. Trimmed right wingtip cove for PCBs. Left a little more material than the left side.
27721BA7-6EF7-4C9D-BB48-D789945A77F9.jpeg
5A03E11F-2B9B-4518-ACCE-FAF58B439502.jpeg
59737844-614F-407A-8399-9EDDF0549446.jpeg
FE41FD45-B173-42E1-AB25-3B3DD922E3A8.jpeg
1B1A00BF-5CFB-40A7-8F51-7EAC48ADBF45.jpeg
DFA5BFDA-DDE8-4BED-BF95-EC202EFA8F79.jpeg
87AD1EA0-DAFE-4B54-8309-5757B4C59D55.jpeg
6E815A84-4D53-4312-B7C6-75F4A35216AF.jpeg
AE26295A-EF5F-4FD8-A039-1B4CC7717C85.jpeg
C2531893-24A5-4BC7-8F93-67C11DEDD947.jpeg
F8F8E66F-F1E8-4218-AC7B-67582A8416E1.jpeg
3E21A7E2-CB40-481C-A820-D9A2D3AA3267.jpeg
F87F76B1-536F-48A1-B72D-EA2023CC918E.jpeg
4BD09CDA-7CAD-4CAE-8990-F0ED0A615E48.jpeg
Oct 20, 2021
FlyLeds right tip lights and controller board
- (4 hours)
Category: Lighting
Finished right side forward facing and outboard facing PCBs. Soldered all resistors and connectors to back of both boards. Installed strobe light heat sinks. Tested both boards with 9V battery to check lights and all functioned as advertised. Populated and prepped all components for the controller PCB. Soldered all components and connectors. Tested controller board indicator lights and seems to function well.
57ADB934-E472-4614-91B4-1BCD5DD742FB.jpeg
0BCB456B-2A98-486A-802B-D51ECB4679A2.jpeg
F3C0B6E7-B98E-42CB-8008-3E842662E20C.jpeg
F88624C6-85DA-4482-A9B0-1D7332CE7F2C.jpeg
F6F41EF9-DA11-4A57-AD66-E872322BD3D4.jpeg
CE15DFD1-1601-4360-A8ED-B76717770DE2.jpeg
81D4805E-087C-4476-BD22-BB1CA836EBB8.jpeg
Oct 19, 2021
FlyLeds Finished left light CBs and started right
- (4 hours)
Category: Lighting
Prepped and installed left resistors and green connectors. Bent and cut leads, used a spacer to lift the resistors off the PCB for heat dissipation and soldered in place on back of PCB. Installed heat sinks opposite the strobe lights on the back side of PCBs. Soldered green connectors and tested lights with 9V battery. All worked as advertised. Began working on right ( green) lights. Trimmed PCBs to right wing tip and marked cutouts for both PCBs on wingtip cove. Prepped right strobe lights and green nav light and attached with thermal grease, being careful of orientation.
8BA76E59-E2FB-4A43-BB5F-F531F26A9448.jpeg
765937A9-38CD-4576-A635-461BCD7543C7.jpeg
0793F09F-7EF4-44B8-9677-31FD675C3C5C.jpeg
B14B29BA-E6AA-494E-AE74-E467E6A881E5.jpeg
F22BD7D8-722E-415B-8AC1-3A962729B9CE.jpeg
BD5C4982-F6E9-47C9-948E-2CFBF060F24D.jpeg
AE3E806D-D24B-44D5-B036-F6580E2EEA60.jpeg
5E787435-2E5F-4A8C-B11E-45E3E94F7ACF.jpeg
Oct 18, 2021
Strobes and red nav Led lights
- (2 hours)
Category: Lighting
Prepped more strobe light legs. Applied thermal grease to strobes and red Leds. Mounted and soldered all. Used template and cut out wing tip for forward facing lights.
22A94B5C-934E-4F21-B65B-066DBF76C0F6.jpeg
15ADDED6-1797-4DEA-BF0D-33160ED27455.jpeg
F22BCC82-835C-4B2D-A497-7FA21EDF370D.jpeg
7AF627F9-AAB0-44CA-8DA0-FBCD5BBBCE0A.jpeg
0D163F13-8A60-439B-9D22-499D4AE32640.jpeg
Oct 17, 2021
Wing tip lights
- (2 hours)
Category: Lighting
Used FlyLeds template to make make cutouts for both the forward facing and outboard facing circuit boards. Trimmed the forward facing circuit board circuit board to fit the left wingtip light cove. Also beveled the aft edge of the outboard facing PCB to sit flush against the forward facing PCB.
0B8D0AA2-8CDF-47EC-9F7A-B9C0FB966179.jpeg
4B2D8C35-DB37-46D1-97B2-2CD5BE49B7B0.jpeg
3B2CA77A-3900-4CA6-818E-DE8C5911AB6C.jpeg
3D553C39-A131-4C2D-B3FE-E3D11D05767D.jpeg
Oct 16, 2021
Wing tip lights
- (2 hours)
Category: Lighting
Trimmed outboard facing circuit board to match wingtip light cove. Began prepping LEDs for solder installation and cut out template for wing tip trimming.
112BCE88-FCDC-4171-AEB3-E6F6F94DE61B.jpeg
80747E82-9CA5-4CAF-8024-2FC30D890577.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.