Project: DaveBellairs   -  
            Listing for Category : landing gear
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1452.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Dec 08, 2022     Wheel pant brackets and rudder tip - (3 hours)       Category: Landing Gear
Jacked up the fuselage and reinstalled correctly the inboard wheel pant brackets and jack points. Fabricated an extension to the saw horse to support the gear while we completed the installation. Sam also epoxied the aluminum backer plate to the interior of the upper rudder tip and should be able to install rivets tomorrow.


 
Dec 06, 2022     Wheel removal - (1 hour)       Category: Landing Gear
Sam and I began removing the wheel and tire on the right side to install the wheel pant bracket that was not previously installed.


 
Jul 21, 2022     Flyboy Jack Pionts - (1 hour)       Category: Landing Gear
Used the Flyboy Jack point I bought a while ago to jack up the gear and rotate the tires to prevent getting flat spots. It worked great on the left wheel, but I was unable to remove it from the right wheel due to interference between the bolt on the jack point and the rotor of the brake.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.