Project: DaveBellairs   -  
            Listing for Category : Avionics
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Feb 25, 2024     Stick grips and wire ties - (1 hour)       Category: Avionics
Spent some time comparing the AFS wire diagram for the stick grips versus the Infinity grip drawing. I've got two buttons on the grip that may not be functional due to lack of inputs on the stick grip connector. Need to contact AFS for some assistance. Installed some lacing cord on the pitot lines and wires coming into the fuse from the wing. Secured the wires coming forward from the rear of the aircraft thru the wing spar.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.