Project: DaveBellairs   -  
            Listing for Category : Avionics
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Mar 25, 2024     More engine sensor wires - (3 hours)       Category: Avionics
Spliced the remaining engine sensor wires to the fuel, oil and manifold pressure wires with heat shrink for support and stain relief. Finished the molex connector for the manifold pressure wires. These molex pins were larger than the ones I've installed before so had to use the “B” portion of the crimpers. Also added a ring terminal for the oil temp sensor wire and connected it to the oil temp sensor. Looked at the mag rpm wires and not sure about where to add the 30k resistors per the drawing and even if they are necessary. Also not sure how to wire up the ElectroAir mag. Gonna check the installation instructions.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.