Project: DaveBellairs   -  
            Listing for Category : Lighting
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Feb 18, 2024     Tail light wire - (2 hours)       Category: Lighting
Found a way to route the tail light wire through the aft bulkheads F-711 and F-712. I used a gap in the F-711 longeron stiffener to route the wire and drilled a hole in the aft bulkhead per Dwg OP 56-2. Used pitot tubing to protect the wire from chafing on the bulkheads and also for strain relief. It was the perfect size


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.