EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Sling2
-
Listing for Category : Show all entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (194)
Research
- (1)
Workshop
Empennage
- (104)
Fuselage
- (8)
Firewall
Tail Feathers
- (1)
Wings
- (80)
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
GARY WOLD
-
Project:
The Airplane Factory - Sling 2
-
VIEW REPORTS
Total Hours:
231.9
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Nov 01, 2019 - No Finish Date
Engine:
Rotax 912iS
Panel:
Garmin
Friendly URL:
https://eaabuilderslog.org?s=Sling2
Home or Last Project Picture
Apr 15, 2024
Filler
- (1.5 hours)
Category: Wings
Finished sanding off excess filler from rivet heads - top right wing
Apr 14, 2024
Filler
- (1.2 hours)
Category: Wings
Sand off excess filler from rivet heads - top right wing
Apr 13, 2024
Filler
- (1.0 hour)
Category: Wings
Sand off excess filler from rivet heads - top of right wing
Apr 12, 2024
Filler
- (6.1 hours)
Category: Wings
After delay for vacation trip: Filled all rivet heads on top of both wings
Mar 11, 2024
Aileron
- (1.1 hours)
Category: Wings
Sanded off excess filler from right aileron rivet heads. Aileron complete
20240309_134147.jpg
Mar 09, 2024
Aileron
- (1.0 hour)
Category: Wings
Filled rivet heads of right aileron
Mar 02, 2024
Ailerons
- (2.1 hours)
Category: Wings
Finished riveting right aileron assembly. Removed and realigned left aileron hinge z-bracket. Reinstalled.
Feb 29, 2024
Aileron
- (0.9 hour)
Category: Wings
Riveting right aileron skin on ribs
Feb 28, 2024
Aileron
- (1.0 hour)
Category: Wings
Cleco'd right aileron skin to ribs. Ready to rivet together
20240228_160814.jpg
Feb 27, 2024
Aileron
- (0.8 hour)
Category: Wings
Adjusted Z-bracket (hinge) in order to align attachment bolt holes. Completed assembly of ribs.
20240227_140059.jpg
Feb 26, 2024
Aileron
- (0.8 hour)
Category: Wings
Assemble & rivet internal brackets of right aileron
Feb 24, 2024
Aileron
- (0.5 hour)
Category: Wings
Clecod right aileron internal brackets
Feb 19, 2024
Aileron
- (1.2 hours)
Category: Wings
Cleaned and primed right aileron parts.
Feb 17, 2024
Aileron
- (1.1 hours)
Category: Wings
Deburred new right aileron parts. Prepped for primer
Feb 01, 2024
Aileron
- (1.4 hours)
Category: Wings
Removed plastic from new right aileron parts. Next step is deburring
20240201_155458.jpg
Jan 04, 2024
Filling rivets
- (0.7 hour)
Category: Wings
Finished filling rivets on bottom of left wing. Sanding the excess is next
Jan 03, 2024
Filling rivets
- (1.7 hours)
Category: Wings
Filling rivets on underside of left wing. Will finish next session
Dec 31, 2023
Elevator
- (1.0 hour)
Category: Empennage
Sanded off excess filler from rivet heads on top side of elevator
Dec 30, 2023
Elevator
- (1.1 hours)
Category: Empennage
Filled rivets on top side of elevator
Dec 21, 2023
Elevator
- (0.9 hour)
Category: Empennage
Sanded off excess filler from rivet heads - underside of elevator (new method)
20231221_151343.jpg
Dec 20, 2023
Elevator
- (0.4 hour)
Category: Empennage
Filled other half of the rivet heads on bottom of elevator. (new method)
20231221_141157.jpg
Nov 28, 2023
Elevator
- (1.3 hours)
Category: Empennage
Filled rivet heads on half of elevator bottom
Oct 14, 2023
Right aileron fix
- (0.8 hour)
Category: Wings
Drilled out rivets from control and attach brackets. Inventory parts to be replaced
20231014_130441.jpg
Oct 13, 2023
Right aileron fix
- (2.3 hours)
Category: Wings
Finished drilling out rivets from skin of right aileron. Need to remove control/attach brackets then determine parts required for reorder.
Aug 22, 2023
Right aileron fix
- (0.7 hour)
Category: Wings
Drilling out rivets on leading edge right aileron
Aug 05, 2023
Horizontal Stabilizer
- (0.8 hour)
Category: Empennage
Finished filling rivets on horizontal stabilizer
Jul 06, 2023
Horizontal stabilizer
- (1.0 hour)
Category: Empennage
After a multiple month pause due to hand surgery, I filled half of the rivet heads on the bottom side of the horizontal stabilizer
Mar 25, 2023
Horizontal stabilizer
- (1.2 hours)
Category: Empennage
Filled rivet heads on top side of horizontal stabilizer
Mar 18, 2023
Vertical stabilizer
- (0.6 hour)
Category: Empennage
Filled rivet heads on left side of vertical stabilizer
Mar 17, 2023
Vertical stabilizer
- (0.6 hour)
Category: Empennage
Filled rivets on right side of vertical stabilizer
Feb 20, 2023
Rudder
- (0.5 hour)
Category: Empennage
Removed plastic and ground 10 rivet heads on rudder
Feb 15, 2023
Rudder
- (1.0 hour)
Category: Empennage
Finished filling rivet heads on rudder
Feb 14, 2023
Rudder
- (1.1 hours)
Category: Empennage
Filled rivet heads on one side of rudder
Feb 08, 2023
Ailerons
- (1.3 hours)
Category: Wings
Finished removing plastic from ailerons
Jan 30, 2023
Ailerons
- (1.0 hour)
Category: Wings
Removing plastic from exterior of ailerons
Jan 29, 2023
Ailerons
- (.6 hour)
Category: Wings
Filled rivet heads underside of ailerons
Jan 28, 2023
Aileerons
- (1.1 hours)
Category: Tail Feathers
Filled rivet heads top side of ailerons
Oct 05, 2022
Fill rivet heads
- (2.0 hours)
Category: Wings
Filling rivet heads
Sep 24, 2022
Flaps
- (1.1 hours)
Category: Wings
Filled rivet heads on left flap
Aug 15, 2022
Right flap
- (0.9 hour)
Category: Wings
Finished filling rivet heads on right flap
Aug 14, 2022
Right flap
- (0.5 hour)
Category: Wings
Filling rivet heads on right flap
Aug 10, 2022
Right flap
- (0.2 hour)
Category: Wings
Added extra rivet in right flap leading edge
Jul 20, 2022
Right flap
- (0.5 hour)
Category: Wings
Pulled balance of rivets on bottom of right flap and removed it from the fixture
Jul 12, 2022
Flap
- (1.0 hour)
Category: Wings
Pulled rivets on bottom of right flap
Jul 07, 2022
Flap
- (0.3 hour)
Category: Wings
Drilled holes and pulled some rivets on bottom of right flap
Jul 04, 2022
Right flap
- (1.4 hours)
Category: Wings
Finished pulling rivets on top skin of right flap and flipped over in fixture
Jul 03, 2022
Right flap
- (0.3 hour)
Category: Wings
Drilled/pulled some rivets on top of right flap
Jun 25, 2022
Right flap
- (3.0 hours)
Category: Wings
Cleco'd rib to right flap skin bottom. Put flap in fixture. Cleco'd top skin in place. Installed some rivets along nose of the rib.
Flap - right in fixture.jpg
Jun 22, 2022
Right flap
- (0.9 hour)
Category: Wings
Deburred, scuffed, clean, and primed right flap rib
Jun 21, 2022
Right flap
Category: Wings
Missing flap rib arrived today
Jun 07, 2022
Aft fuselage
- (1.5 hours)
Category: Fuselage
Inserted 4 grommets and pulled 2 wire cables through the tight grommets
Jun 02, 2022
Aft fuselage
- (0.1 hour)
Category: Fuselage
Reinstalled 3rd rivet on aft end of fuselage
May 30, 2022
Aft fuselage
- (0.2 hour)
Category: Fuselage
Reinstalled 2 of 3 bad rivets on aft end of fuselage
May 26, 2022
Aft fuselage
- (0.6 hour)
Category: Fuselage
Removed bad 3/32 rivets for anchor nuts on aft end of fuselage
May 22, 2022
Aft section
- (0.2 hour)
Category: Fuselage
Riveted fuselage skin around hole for elevator control tube pass-thru
May 05, 2022
Aft fuselage
- (3.2 hours)
Category: Fuselage
Finished countersinking rivet holes. Cleco'd anchor nuts and riveted. Need a few more rivets to replace those that not seat right.
Apr 04, 2022
Aft fuselage
- (0.3 hour)
Category: Fuselage
Started countersinking rivet holes for anchor nuts - rear of fuselage
Mar 07, 2022
Flap
- (2.7 hours)
Category: Wings
Left flap - cleco'd top of skin. Pulled all rivets for assembly
Flap - left assembly 1.jpg
Flap - left assembly 2.jpg
Flap - left assembly 3.jpg
Mar 06, 2022
Flap
- (1.7 hours)
Category: Wings
Cleco'd ribs to lower left flap skin. Put flap in fixture to square it up upon assembly
Flap - left in fixture.jpg
Feb 23, 2022
Flap
- (0.8 hour)
Category: Wings
Cleaned and primed left flap skin
Feb 22, 2022
Flap
- (1.4 hours)
Category: Wings
Deburred and scuffed left flap skin
Feb 15, 2022
Flap
- (1.3 hours)
Category: Wings
Cleco'd ribs in bottom of right flap skin. received a wrong rib in my kit. Have to wait for correct rib to complete this flap.
Flap - right in process.jpg
Feb 05, 2022
Flap
- (1.3 hours)
Category: Wings
Removed plastic from inside left flap skin. Melted and removed exterior plastic along rivet lines.
Feb 05, 2022
Flap
- (0.4 hour)
Category: Wings
Started to cleco ribs in right flap skin. Found a fit problem which I need to check with the dealer.
Jan 18, 2022
Flaps
- (1.1 hours)
Category: Wings
Scuffed, cleaned, and primed right flap skin
Flap skin - right.jpg
Jan 17, 2022
Flap
- (0.6 hour)
Category: Wings
Deburred right flap skin. Prepped for priming
Jan 12, 2022
Flaps
- (0.4 hour)
Category: Wings
Finished removing plastic along rivet lines exterior right flap skin
Dec 15, 2021
Flaps
- (1.6 hours)
Category: Wings
Removing plastic along rivet lines exterior right flap
Nov 30, 2021
Flaps
- (1.9 hours)
Category: Wings
Finished removing plastic from inside right flap. Taped exterior rivet lines for plastic removal.
Nov 29, 2021
Flaps
- (0.9 hour)
Category: Wings
Removing plastic from inside right flap
Nov 10, 2021
Flaps
- (0.7 hour)
Category: Wings
Removing plastic from inside of right flap skin
Oct 04, 2021
Lag on project
Category: Wings
Was working on a rack for the components in July. Have not been able to work on my project since Airventure due to injury of my foot. Hope to get back at it slowly 2nd half October.
Jul 05, 2021
Flaps
- (0.7 hour)
Category: Wings
Cleco'd and riveted rib assemblies for left flap
Flap structure assemblies.jpg
Jul 04, 2021
Flaps
- (0.4 hour)
Category: Wings
Completed right flap subassemblies
Jul 01, 2021
Flaps
- (0.4 hour)
Category: Wings
Riveted one of the flap subassemblies
Jun 30, 2021
Flaps
- (0.5 hour)
Category: Wings
Cleco'd flap structure subassemblies
Jun 28, 2021
Flaps
- (1.9 hours)
Category: Wings
Cleaned and primed flap structure parts
Jun 26, 2021
Flaps
- (0.5 hour)
Category: Wings
Finished scuffing flap structure parts
Jun 21, 2021
Flaps
- (1.0 hour)
Category: Wings
Scuffing flap structure parts for primer
Jun 06, 2021
Aileron
- (0.3 hour)
Category: Wings
Finished riveting leading edge of right aileron. Gabrielle helped.
Aileron (right) completion with Gabrielle.jpg
May 27, 2021
Aileron
- (1.5 hours)
Category: Wings
Put right aileron in the fixtures. Riveted all but leading edge.
May 25, 2021
Aileron
- (1.1 hours)
Category: Wings
Finished riveting left aileron
Aileron complete - left.jpg
May 24, 2021
Aileron
- (2.0 hours)
Category: Wings
Cleco'd aileron assemblies. Riveted underside of left aileron.
Aileron assemblies.jpg
May 04, 2021
Aileron
- (1.1 hours)
Category: Wings
Assembled aileron structure subassemblies.
May 03, 2021
Aileron
- (1.0 hour)
Category: Wings
Enlarged mounting holes on anchor nuts. Cleco'd aileron structure parts for subassemblies.
Apr 17, 2021
Flaps
- (1.7 hours)
Category: Wings
Finished deburring flap structure parts
Apr 14, 2021
Flaps
- (1.7 hours)
Category: Wings
Deburring flap structure parts
Apr 13, 2021
Flaps
- (1.5 hours)
Category: Wings
Finished removing plasticfrom flap structure parts
Apr 10, 2021
Flaps
- (2.1 hours)
Category: Wings
Found all flap parts. Started removing plastic.
Apr 05, 2021
Aileron
- (1.8 hours)
Category: Wings
Cleaned and primed aileron parts
Aileron parts primed.jpg
Apr 03, 2021
Aileron
- (1.0 hour)
Category: Wings
Scuffed aileron parts for primer
Mar 30, 2021
Aileron
- (0.9 hour)
Category: Wings
Finished deburring aileron skins. Set up for priming.
Mar 29, 2021
Aileron
- (1.7 hours)
Category: Wings
Removed plastic along aileron rivet lines. Deburred one skin.
Mar 27, 2021
Aileron
- (1.5 hours)
Category: Wings
Taped plastic along rivet lines on aileron skin, melted, and started removing plastic
Mar 13, 2021
Aileron
- (2.0 hours)
Category: Wings
Removed plastic from inside aileron skins (what a bear to get off)
Aileron skin - removing plastic.jpg
Feb 18, 2021
Aileron
- (0.8 hour)
Category: Wings
Deburr aileron structure parts
Feb 17, 2021
Aileron
- (0.2 hour)
Category: Wings
Deburr aileron structure parts
Feb 16, 2021
Aileron
- (0.9 hour)
Category: Wings
Deburr aileron structure parts
Feb 08, 2021
Aileron
- (1.3 hours)
Category: Wings
Finished removing plastic from aileron ribs and brackets.
Feb 07, 2021
Aileron
- (.5 hour)
Category: Wings
Started removing plastic from aileron ribs
Feb 03, 2021
Elevator
- (1.6 hours)
Category: Empennage
Installed elevator fiberglass 'wing' tips
Feb 02, 2021
Elevator
- (1.6 hours)
Category: Empennage
Completed riveting elevator leading edge, removed from fixtures, and installed rivnuts in trim servo
Feb 01, 2021
Elevator
- (.4 hour)
Category: Empennage
Enlarged trim servo mounting holes for 4M rivnuts
Jan 30, 2021
Elevator
- (2.0 hours)
Category: Empennage
Riveted other side of elevator skin and part of leading edge.
Jan 27, 2021
Elevator
- (1.7 hours)
Category: Empennage
Riveted skin on the top of the elevator
Elevator top finished.jpg
Jan 19, 2021
Elevator
- (2.0 hours)
Category: Empennage
Flipped elevator over and put back in the fixtures. Cleco'd skins on other side. Started pulling rivets.
Jan 18, 2021
Elevator
- (1.3 hours)
Category: Empennage
Cleco'd skins on bottom side of elevator
Elevator skinning.jpg
Jan 16, 2021
Elevator
- (0.3 hour)
Category: Empennage
Finished putting elevator structure in fixtures
Jan 12, 2021
Elevator
- (0.6 hour)
Category: Empennage
Setting up elevator structure in fixtures for skinning
Jan 10, 2021
Elevator
- (.7 hour)
Category: Empennage
Cut rivets for elevator trailing edge
Dec 16, 2020
Elevator
- (1.7 hours)
Category: Empennage
Attached trim mounting channel. Set up table extensions for fixtures to install skins.
Dec 12, 2020
Elevator
- (1.7 hours)
Category: Empennage
Drilled out rivets in tip rib counterweight. Assembled tip ribs to structure
Nov 21, 2020
Elevator
- (1.3 hours)
Category: Empennage
Cleaned and primed elevator skins
Nov 16, 2020
Elevator
- (.6 hour)
Category: Empennage
Scuffed elevator skins for primer
Nov 14, 2020
Elevator
- (2.2 hours)
Category: Empennage
Deburred elevator skins
Elevator skins deburred.jpg
Nov 08, 2020
Elevator
- (1.5 hours)
Category: Empennage
Melted plastic along tape and removed tape/plastic
Nov 07, 2020
Elevator
- (.8 hour)
Category: Empennage
Taped off elevator skins for plastic removal along rivet lines
Nov 03, 2020
Elevator
- (1.7 hours)
Category: Empennage
Added primer, riveted counterweights in tip ribs, glued brackets in trim mounting channel to aid in assembly
Oct 26, 2020
Elevator
- (1.5 hours)
Category: Empennage
Fixed fouled rivet and reassembled center section. Installed larger rivet in hole in hole that was fouled.
Oct 05, 2020
Elevator
- (.3 hour)
Category: Empennage
Remove center section bracket due to fouled rivet
Sep 30, 2020
Elevator
- (1.0 hour)
Category: Empennage
Inserted and torqued 4 bolts in elevator center section and closing it out
Sep 23, 2020
Elevator
- (.3 hour)
Category: Empennage
Additional priming of parts
Sep 21, 2020
Elevator
- (1.1 hours)
Category: Empennage
Riveting elevator structure together
Sep 16, 2020
Elevator
- (1.5 hours)
Category: Empennage
Elevator assembly
Sep 12, 2020
Elevator
- (1.7 hours)
Category: Empennage
Completed trim tab. Assembling elevator. Drawings are confusing.
Sep 10, 2020
Elevator
- (0.8 hour)
Category: Empennage
Reshaped and reassembled cut rivets
Sep 08, 2020
Elevator
- (1.0 hour)
Category: Empennage
Cutting rivets for trim tab
Sep 05, 2020
Elevator
- (4.3 hours)
Category: Empennage
Cleaned and primed elevator parts
Elevator - clean and prime.jpg
Aug 18, 2020
Elevator
- (1.1 hours)
Category: Empennage
Test fit elevator parts
Aug 06, 2020
Elevator
- (2.5 hours)
Category: Empennage
Finished scuffing elevator parts
Aug 04, 2020
Elevator
- (.2 hour)
Category: Empennage
Scuff elevator parts
Jul 27, 2020
Elevator
- (.7 hour)
Category: Empennage
Deburr elevator parts
Jul 24, 2020
Elevator
- (.6 hour)
Category: Empennage
Deburr elevator parts
Jul 21, 2020
Elevator
- (.6 hour)
Category: Empennage
Deburr elevator parts
Jul 14, 2020
Elevator
- (1.0 hour)
Category: Empennage
Deburring elevator structure parts
Jul 14, 2020
Horizontal Stabilizer
- (.4 hour)
Category: Empennage
Finished riveting skins on horizontal stabilizer
Jul 09, 2020
Horizontal Stabilizer
- (2.4 hours)
Category: Empennage
Riveted horiz stab skin on flip side. Had to take rivet tool apart twice to clear jams
Horiz stab skinning.jpg
Jul 08, 2020
Horizontal Stabilizer
- (1.4 hours)
Category: Empennage
Riveted skins on one side of horiz stab
Jul 03, 2020
Elevator
- (.5 hour)
Category: Empennage
Finished removing plastic from elevator structure parts
Jul 01, 2020
Elevator
- (.5 hour)
Category: Empennage
Removed plastic from elevator parts
Jun 24, 2020
Horizontal Stabilizer
- (.8 hour)
Category: Empennage
Riveting skins on horiz stab. Riveting puller jamed again (#2) so pretty much dead in my tracks until getting it back from repair or I find something to work on given constraints in garage
Jun 23, 2020
Horizontal Stabilizer
- (1.3 hours)
Category: Empennage
Finished clecoing horiz stab skins on structure
Jun 22, 2020
Horizontal Stabilizer
- (.4 hour)
Category: Empennage
Put horiz stab back in fixtures and started clecoing skins on
Jun 20, 2020
Horizontal Stabilizer
- (1.3 hours)
Category: Empennage
Drill out 24 rivets that must go in as the skin is put on
Jun 19, 2020
Horizontal Stabilizer
- (.3 hour)
Category: Empennage
Completed riveting horiz stab structure
Jun 16, 2020
Horizontal Stabilizer
- (2.5 hours)
Category: Empennage
Riveted horiz stab structure
Horiz stab structure riveting.jpg
Jun 15, 2020
Horizontal Stabilizer
- (1 hour)
Category: Empennage
Extended worktable. Got horiz stab in the fixtures for riveting
Jun 06, 2020
Horizontal Stabilizer
- (1.3 hours)
Category: Empennage
Scuffed, clean, and prime the inside of the horiz stab skins
May 30, 2020
Horizontal Stabilizer
- (1.8 hours)
Category: Empennage
Removed plastic along rivet lines and deburred skins
Horiz stab plastic removed.jpg
May 26, 2020
Horizontal Stabilizer
- (.6 hour)
Category: Empennage
Removing plastic from horiz stab skins
May 17, 2020
Horizontal Stabilizer
- (1.7 hours)
Category: Empennage
Started assembling horiz stab structure. Feeding trim motor wire through the grommets was a bear.
May 16, 2020
Horizontal Stabilizer
- (3 hours)
Category: Empennage
Cleaned and primed horizontal stabilizer structure parts
May 11, 2020
Horizontal Stabilizer
- (1 hour)
Category: Empennage
Completed test assembly of horiz stab structure
May 04, 2020
Horizontal Stabilizer
- (1.5 hours)
Category: Empennage
Clecoed most of the horizontal stabilizer structure for test fit.
Apr 23, 2020
Horizontal Stabilizer
- (1.2 hours)
Category: Empennage
Finished scuffing horizontal stabilizer structure
Horiz stab structure scuffing.jpg
Apr 21, 2020
Horizontal Stabilizer
- (1 hour)
Category: Empennage
Scuffed horizontal stabilizer structure parts
Apr 16, 2020
Rudder
- (1.5 hours)
Category: Empennage
Cut rivets for rudder. Finished riveting skins. Part complete
Rudder completed.jpg
Apr 14, 2020
Rudder
- (1.6 hours)
Category: Empennage
Fixed mismatched holes in rudder skin and riveted one side of skin
Rudder ready for rivets.jpg
Apr 06, 2020
Rudder
- (1.2 hours)
Category: Empennage
Cleco'd main rudder skin in place
Apr 05, 2020
Horizontal Stabilizer
- (1.3 hours)
Category: Empennage
Finished deburring horizontal stab structure
Mar 31, 2020
Horizontal Stabilizer
- (.8 hour)
Category: Empennage
Deburr horizontal stabilizer parts
Mar 30, 2020
Horizontal Stabilizer
- (1.8 hours)
Category: Empennage
Deburr horizontal stab parts
Mar 26, 2020
Horizontal Stabilizer
- (2.0 hours)
Category: Empennage
Removed plastic from horizontal stabilizer structure parts
Horizontal stabilizer structure.jpg
Mar 21, 2020
Rudder
- (1.0 hour)
Category: Empennage
Cleaned and primed inside of rudder skins
Mar 19, 2020
Rudder
- (1.3 hours)
Category: Empennage
Deburr and scuff rudder skins
Rudder skin being scuffed.jpg
Mar 18, 2020
Rudder
- (1.7 hours)
Category: Empennage
Retrieve and remove plastic from rudder skins
Mar 14, 2020
Rudder
- (1.5 hours)
Category: Empennage
Searched for rudder tip and strobe mounting plate. No Joy. Studied rudder plans and parts for assembly
Mar 11, 2020
Rudder
- (2.0 hours)
Category: Empennage
Assembled rudder internal structure
Rudder structure.jpg
Mar 08, 2020
Vertical stabilizer
- (2.0 hours)
Category: Empennage
Completed riveting vert stab skin. Component complete
Vert stab complete.jpg
Mar 07, 2020
Rudder
- (.7 hour)
Category: Empennage
Clean and prime rudder structure parts
Mar 07, 2020
Vertical stabilizer
- (4.0 hours)
Category: Empennage
Primed inside vert stab skin. When dry, fit the skin on vert stab structure and began riveting.
Vert stab skinning 1.jpg
Mar 06, 2020
Rudder
- (1.0 hour)
Category: Empennage
Located rudder parts and scuffed in prep for primer
Mar 06, 2020
Vertical stabilizer
- (.3 hour)
Category: Empennage
Scuffed inside of vert stab skin in prep for primer
Mar 05, 2020
Vertical stabilizer
- (1.7 hours)
Category: Empennage
Find and deburr vertical stabilizer skin
Mar 03, 2020
Vertical stabilizer
- (.5 hour)
Category: Empennage
Ground off remaining rivet head, punched the rivet out and installed new rivet correctly
Feb 27, 2020
Vertical stabilizer
- (1.8 hours)
Category: Empennage
Finished riveting internal structure of vert stab, installed 4 rivnuts, and installed wiring for strobe
Vert stab structure complete.jpg
Feb 26, 2020
Vertical stabilizer
- (2.0 hours)
Category: Empennage
Cleco and start riveting vert stab structure
Feb 25, 2020
Vertical stabilizer
- (0.2 hour)
Category: Empennage
Drilled out 4 rivnuts from rear spar. Error in installation.
Feb 23, 2020
Vertical stabilizer
- (2.5 hours)
Category: Empennage
Started vert stab assembly. Installed rivnuts and protective sleeves for wiring
Initial vert stab assembly.jpg
Feb 22, 2020
Vertical stabilizer
- (1.5 hours)
Category: Empennage
Primed all internal vert stab parts
Feb 21, 2020
Vertical stabilizer
- (1.2 hours)
Category: Empennage
Drill holes for larger rivnuts and screws. Deburr and re-clean parts.
Feb 12, 2020
Vertical stabilizer
- (1.5 hours)
Category: Empennage
Reamed holes for grommets. Cleaned all parts for primer.
Feb 07, 2020
Vertical stabilizer
- (0.5 hour)
Category: Empennage
Completed test assembly of vert stab parts. Removed clecos for priming
Feb 04, 2020
What needs to be done
- (2.2 hours)
Category: Fuselage
Compared fuselage plans to quickbuild fuselage. Determined what needs to be done yet.
Jan 31, 2020
Vertical stabilizer
- (2 hours)
Category: Empennage
Trial assembly of internal vertical stab parts. Ran out of 5/32 clecos so have to wait for order.
Trial assembly of vert stab.jpg
Jan 28, 2020
Vertical stabilizer
- (.2 hour)
Category: Empennage
Separated rudder parts from vertical stabilizer parts which had gotten mixed in. Wrapped in plastic to protect while in the box
Jan 25, 2020
Vertical stabilizer
- (2.0 hours)
Category: Empennage
Scuffed internal vertical stabilizer parts for primer
Scuffing vert stab parts.jpg
Jan 22, 2020
Vertical stabilizer
- (2.7 hours)
Category: Empennage
Finished deburring the internal parts of the vertical stabilizer. Next step is to scuff and prime mating surfaces.
Jan 06, 2020
Vertical stabilizer
- (1.5 hours)
Category: Empennage
Finished removing plastic from parts and started deburring.
Dec 21, 2019
Vertical stabilizer
- (0.3 hour)
Category: Empennage
Plastic removed from additional vert stab parts
Dec 04, 2019
Vertical stabilizer
- (1 hour)
Category: Empennage
Removed plastic from vertical stabilizer aluminium parts
Nov 18, 2019
Vertical stabilizer
- (.7 hour)
Category: Empennage
Identified vertical stabilizer parts and started prep for primer
Nov 11, 2019
Quickbuild Kit
Category: Research
Sling 2 quickbuild kit was delivered today. Need to determine where the dealer ended and I start.
20191111_083258.jpg
20191111_095701.jpg
20191111_095710.jpg
IMG951005.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.