Project: Sling2   -  
            Listing for Category : wings
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:GARY WOLD   -  
Project:   The Airplane Factory - Sling 2   -   VIEW REPORTS
Total Hours:231.9
Total Flight Time:
Total Expense:N/A
Start/Last Date:Nov 01, 2019 - No Finish Date
Engine:Rotax 912iS
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=Sling2

Home or Last Project Picture

Apr 15, 2024     Filler - (1.5 hours) Category: Wings
Finished sanding off excess filler from rivet heads - top right wing
 
Apr 14, 2024     Filler - (1.2 hours) Category: Wings
Sand off excess filler from rivet heads - top right wing
 
Apr 13, 2024     Filler - (1.0 hour) Category: Wings
Sand off excess filler from rivet heads - top of right wing
 
Apr 12, 2024     Filler - (6.1 hours) Category: Wings
After delay for vacation trip: Filled all rivet heads on top of both wings
 
Mar 11, 2024     Aileron - (1.1 hours)       Category: Wings
Sanded off excess filler from right aileron rivet heads. Aileron complete


 
Mar 09, 2024     Aileron - (1.0 hour) Category: Wings
Filled rivet heads of right aileron
 
Mar 02, 2024     Ailerons - (2.1 hours) Category: Wings
Finished riveting right aileron assembly. Removed and realigned left aileron hinge z-bracket. Reinstalled.
 
Feb 29, 2024     Aileron - (0.9 hour) Category: Wings
Riveting right aileron skin on ribs
 
Feb 28, 2024     Aileron - (1.0 hour)       Category: Wings
Cleco'd right aileron skin to ribs. Ready to rivet together


 
Feb 27, 2024     Aileron - (0.8 hour)       Category: Wings
Adjusted Z-bracket (hinge) in order to align attachment bolt holes. Completed assembly of ribs.


 
Feb 26, 2024     Aileron - (0.8 hour) Category: Wings
Assemble & rivet internal brackets of right aileron
 
Feb 24, 2024     Aileron - (0.5 hour) Category: Wings
Clecod right aileron internal brackets
 
Feb 19, 2024     Aileron - (1.2 hours) Category: Wings
Cleaned and primed right aileron parts.
 
Feb 17, 2024     Aileron - (1.1 hours) Category: Wings
Deburred new right aileron parts. Prepped for primer
 
Feb 01, 2024     Aileron - (1.4 hours)       Category: Wings
Removed plastic from new right aileron parts. Next step is deburring


 
Jan 04, 2024     Filling rivets - (0.7 hour) Category: Wings
Finished filling rivets on bottom of left wing. Sanding the excess is next
 
Jan 03, 2024     Filling rivets - (1.7 hours) Category: Wings
Filling rivets on underside of left wing. Will finish next session
 
Oct 14, 2023     Right aileron fix - (0.8 hour)       Category: Wings
Drilled out rivets from control and attach brackets. Inventory parts to be replaced


 
Oct 13, 2023     Right aileron fix - (2.3 hours) Category: Wings
Finished drilling out rivets from skin of right aileron. Need to remove control/attach brackets then determine parts required for reorder.
 
Aug 22, 2023     Right aileron fix - (0.7 hour) Category: Wings
Drilling out rivets on leading edge right aileron
 
Feb 08, 2023     Ailerons - (1.3 hours) Category: Wings
Finished removing plastic from ailerons
 
Jan 30, 2023     Ailerons - (1.0 hour) Category: Wings
Removing plastic from exterior of ailerons
 
Jan 29, 2023     Ailerons - (.6 hour) Category: Wings
Filled rivet heads underside of ailerons
 
Oct 05, 2022     Fill rivet heads - (2.0 hours) Category: Wings
Filling rivet heads
 
Sep 24, 2022     Flaps - (1.1 hours) Category: Wings
Filled rivet heads on left flap
 
Aug 15, 2022     Right flap - (0.9 hour) Category: Wings
Finished filling rivet heads on right flap
 
Aug 14, 2022     Right flap - (0.5 hour) Category: Wings
Filling rivet heads on right flap
 
Aug 10, 2022     Right flap - (0.2 hour) Category: Wings
Added extra rivet in right flap leading edge
 
Jul 20, 2022     Right flap - (0.5 hour) Category: Wings
Pulled balance of rivets on bottom of right flap and removed it from the fixture
 
Jul 12, 2022     Flap - (1.0 hour) Category: Wings
Pulled rivets on bottom of right flap
 
Jul 07, 2022     Flap - (0.3 hour) Category: Wings
Drilled holes and pulled some rivets on bottom of right flap
 
Jul 04, 2022     Right flap - (1.4 hours) Category: Wings
Finished pulling rivets on top skin of right flap and flipped over in fixture
 
Jul 03, 2022     Right flap - (0.3 hour) Category: Wings
Drilled/pulled some rivets on top of right flap
 
Jun 25, 2022     Right flap - (3.0 hours)       Category: Wings
Cleco'd rib to right flap skin bottom. Put flap in fixture. Cleco'd top skin in place. Installed some rivets along nose of the rib.


 
Jun 22, 2022     Right flap - (0.9 hour) Category: Wings
Deburred, scuffed, clean, and primed right flap rib
 
Jun 21, 2022     Right flap Category: Wings
Missing flap rib arrived today
 
Mar 07, 2022     Flap - (2.7 hours)       Category: Wings
Left flap - cleco'd top of skin. Pulled all rivets for assembly


 
Mar 06, 2022     Flap - (1.7 hours)       Category: Wings
Cleco'd ribs to lower left flap skin. Put flap in fixture to square it up upon assembly


 
Feb 23, 2022     Flap - (0.8 hour) Category: Wings
Cleaned and primed left flap skin
 
Feb 22, 2022     Flap - (1.4 hours) Category: Wings
Deburred and scuffed left flap skin
 
Feb 15, 2022     Flap - (1.3 hours)       Category: Wings
Cleco'd ribs in bottom of right flap skin. received a wrong rib in my kit. Have to wait for correct rib to complete this flap.


 
Feb 05, 2022     Flap - (1.3 hours) Category: Wings
Removed plastic from inside left flap skin. Melted and removed exterior plastic along rivet lines.
 
Feb 05, 2022     Flap - (0.4 hour) Category: Wings
Started to cleco ribs in right flap skin. Found a fit problem which I need to check with the dealer.
 
Jan 18, 2022     Flaps - (1.1 hours)       Category: Wings
Scuffed, cleaned, and primed right flap skin


 
Jan 17, 2022     Flap - (0.6 hour) Category: Wings
Deburred right flap skin. Prepped for priming
 
Jan 12, 2022     Flaps - (0.4 hour) Category: Wings
Finished removing plastic along rivet lines exterior right flap skin
 
Dec 15, 2021     Flaps - (1.6 hours) Category: Wings
Removing plastic along rivet lines exterior right flap
 
Nov 30, 2021     Flaps - (1.9 hours) Category: Wings
Finished removing plastic from inside right flap. Taped exterior rivet lines for plastic removal.
 
Nov 29, 2021     Flaps - (0.9 hour) Category: Wings
Removing plastic from inside right flap
 
Nov 10, 2021     Flaps - (0.7 hour) Category: Wings
Removing plastic from inside of right flap skin
 
Oct 04, 2021     Lag on project Category: Wings
Was working on a rack for the components in July. Have not been able to work on my project since Airventure due to injury of my foot. Hope to get back at it slowly 2nd half October.
 
Jul 05, 2021     Flaps - (0.7 hour)       Category: Wings
Cleco'd and riveted rib assemblies for left flap


 
Jul 04, 2021     Flaps - (0.4 hour) Category: Wings
Completed right flap subassemblies
 
Jul 01, 2021     Flaps - (0.4 hour) Category: Wings
Riveted one of the flap subassemblies
 
Jun 30, 2021     Flaps - (0.5 hour) Category: Wings
Cleco'd flap structure subassemblies
 
Jun 28, 2021     Flaps - (1.9 hours) Category: Wings
Cleaned and primed flap structure parts
 
Jun 26, 2021     Flaps - (0.5 hour) Category: Wings
Finished scuffing flap structure parts
 
Jun 21, 2021     Flaps - (1.0 hour) Category: Wings
Scuffing flap structure parts for primer
 
Jun 06, 2021     Aileron - (0.3 hour)       Category: Wings
Finished riveting leading edge of right aileron. Gabrielle helped.


 
May 27, 2021     Aileron - (1.5 hours) Category: Wings
Put right aileron in the fixtures. Riveted all but leading edge.
 
May 25, 2021     Aileron - (1.1 hours)       Category: Wings
Finished riveting left aileron


 
May 24, 2021     Aileron - (2.0 hours)       Category: Wings
Cleco'd aileron assemblies. Riveted underside of left aileron.


 
May 04, 2021     Aileron - (1.1 hours) Category: Wings
Assembled aileron structure subassemblies.
 
May 03, 2021     Aileron - (1.0 hour) Category: Wings
Enlarged mounting holes on anchor nuts. Cleco'd aileron structure parts for subassemblies.
 
Apr 17, 2021     Flaps - (1.7 hours) Category: Wings
Finished deburring flap structure parts
 
Apr 14, 2021     Flaps - (1.7 hours) Category: Wings
Deburring flap structure parts
 
Apr 13, 2021     Flaps - (1.5 hours) Category: Wings
Finished removing plasticfrom flap structure parts
 
Apr 10, 2021     Flaps - (2.1 hours) Category: Wings
Found all flap parts. Started removing plastic.
 
Apr 05, 2021     Aileron - (1.8 hours)       Category: Wings
Cleaned and primed aileron parts


 
Apr 03, 2021     Aileron - (1.0 hour) Category: Wings
Scuffed aileron parts for primer
 
Mar 30, 2021     Aileron - (0.9 hour) Category: Wings
Finished deburring aileron skins. Set up for priming.
 
Mar 29, 2021     Aileron - (1.7 hours) Category: Wings
Removed plastic along aileron rivet lines. Deburred one skin.
 
Mar 27, 2021     Aileron - (1.5 hours) Category: Wings
Taped plastic along rivet lines on aileron skin, melted, and started removing plastic
 
Mar 13, 2021     Aileron - (2.0 hours)       Category: Wings
Removed plastic from inside aileron skins (what a bear to get off)


 
Feb 18, 2021     Aileron - (0.8 hour) Category: Wings
Deburr aileron structure parts
 
Feb 17, 2021     Aileron - (0.2 hour) Category: Wings
Deburr aileron structure parts
 
Feb 16, 2021     Aileron - (0.9 hour) Category: Wings
Deburr aileron structure parts
 
Feb 08, 2021     Aileron - (1.3 hours) Category: Wings
Finished removing plastic from aileron ribs and brackets.
 
Feb 07, 2021     Aileron - (.5 hour) Category: Wings
Started removing plastic from aileron ribs
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.