EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Sling2
-
Listing for Category : empennage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (194)
Research
- (1)
Workshop
Empennage
- (104)
Fuselage
- (8)
Firewall
Tail Feathers
- (1)
Wings
- (80)
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
GARY WOLD
-
Project:
The Airplane Factory - Sling 2
-
VIEW REPORTS
Total Hours:
231.9
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Nov 01, 2019 - No Finish Date
Engine:
Rotax 912iS
Panel:
Garmin
Friendly URL:
https://eaabuilderslog.org?s=Sling2
Home or Last Project Picture
Dec 31, 2023
Elevator
- (1.0 hour)
Category: Empennage
Sanded off excess filler from rivet heads on top side of elevator
Dec 30, 2023
Elevator
- (1.1 hours)
Category: Empennage
Filled rivets on top side of elevator
Dec 21, 2023
Elevator
- (0.9 hour)
Category: Empennage
Sanded off excess filler from rivet heads - underside of elevator (new method)
20231221_151343.jpg
Dec 20, 2023
Elevator
- (0.4 hour)
Category: Empennage
Filled other half of the rivet heads on bottom of elevator. (new method)
20231221_141157.jpg
Nov 28, 2023
Elevator
- (1.3 hours)
Category: Empennage
Filled rivet heads on half of elevator bottom
Aug 05, 2023
Horizontal Stabilizer
- (0.8 hour)
Category: Empennage
Finished filling rivets on horizontal stabilizer
Jul 06, 2023
Horizontal stabilizer
- (1.0 hour)
Category: Empennage
After a multiple month pause due to hand surgery, I filled half of the rivet heads on the bottom side of the horizontal stabilizer
Mar 25, 2023
Horizontal stabilizer
- (1.2 hours)
Category: Empennage
Filled rivet heads on top side of horizontal stabilizer
Mar 18, 2023
Vertical stabilizer
- (0.6 hour)
Category: Empennage
Filled rivet heads on left side of vertical stabilizer
Mar 17, 2023
Vertical stabilizer
- (0.6 hour)
Category: Empennage
Filled rivets on right side of vertical stabilizer
Feb 20, 2023
Rudder
- (0.5 hour)
Category: Empennage
Removed plastic and ground 10 rivet heads on rudder
Feb 15, 2023
Rudder
- (1.0 hour)
Category: Empennage
Finished filling rivet heads on rudder
Feb 14, 2023
Rudder
- (1.1 hours)
Category: Empennage
Filled rivet heads on one side of rudder
Feb 03, 2021
Elevator
- (1.6 hours)
Category: Empennage
Installed elevator fiberglass 'wing' tips
Feb 02, 2021
Elevator
- (1.6 hours)
Category: Empennage
Completed riveting elevator leading edge, removed from fixtures, and installed rivnuts in trim servo
Feb 01, 2021
Elevator
- (.4 hour)
Category: Empennage
Enlarged trim servo mounting holes for 4M rivnuts
Jan 30, 2021
Elevator
- (2.0 hours)
Category: Empennage
Riveted other side of elevator skin and part of leading edge.
Jan 27, 2021
Elevator
- (1.7 hours)
Category: Empennage
Riveted skin on the top of the elevator
Elevator top finished.jpg
Jan 19, 2021
Elevator
- (2.0 hours)
Category: Empennage
Flipped elevator over and put back in the fixtures. Cleco'd skins on other side. Started pulling rivets.
Jan 18, 2021
Elevator
- (1.3 hours)
Category: Empennage
Cleco'd skins on bottom side of elevator
Elevator skinning.jpg
Jan 16, 2021
Elevator
- (0.3 hour)
Category: Empennage
Finished putting elevator structure in fixtures
Jan 12, 2021
Elevator
- (0.6 hour)
Category: Empennage
Setting up elevator structure in fixtures for skinning
Jan 10, 2021
Elevator
- (.7 hour)
Category: Empennage
Cut rivets for elevator trailing edge
Dec 16, 2020
Elevator
- (1.7 hours)
Category: Empennage
Attached trim mounting channel. Set up table extensions for fixtures to install skins.
Dec 12, 2020
Elevator
- (1.7 hours)
Category: Empennage
Drilled out rivets in tip rib counterweight. Assembled tip ribs to structure
Nov 21, 2020
Elevator
- (1.3 hours)
Category: Empennage
Cleaned and primed elevator skins
Nov 16, 2020
Elevator
- (.6 hour)
Category: Empennage
Scuffed elevator skins for primer
Nov 14, 2020
Elevator
- (2.2 hours)
Category: Empennage
Deburred elevator skins
Elevator skins deburred.jpg
Nov 08, 2020
Elevator
- (1.5 hours)
Category: Empennage
Melted plastic along tape and removed tape/plastic
Nov 07, 2020
Elevator
- (.8 hour)
Category: Empennage
Taped off elevator skins for plastic removal along rivet lines
Nov 03, 2020
Elevator
- (1.7 hours)
Category: Empennage
Added primer, riveted counterweights in tip ribs, glued brackets in trim mounting channel to aid in assembly
Oct 26, 2020
Elevator
- (1.5 hours)
Category: Empennage
Fixed fouled rivet and reassembled center section. Installed larger rivet in hole in hole that was fouled.
Oct 05, 2020
Elevator
- (.3 hour)
Category: Empennage
Remove center section bracket due to fouled rivet
Sep 30, 2020
Elevator
- (1.0 hour)
Category: Empennage
Inserted and torqued 4 bolts in elevator center section and closing it out
Sep 23, 2020
Elevator
- (.3 hour)
Category: Empennage
Additional priming of parts
Sep 21, 2020
Elevator
- (1.1 hours)
Category: Empennage
Riveting elevator structure together
Sep 16, 2020
Elevator
- (1.5 hours)
Category: Empennage
Elevator assembly
Sep 12, 2020
Elevator
- (1.7 hours)
Category: Empennage
Completed trim tab. Assembling elevator. Drawings are confusing.
Sep 10, 2020
Elevator
- (0.8 hour)
Category: Empennage
Reshaped and reassembled cut rivets
Sep 08, 2020
Elevator
- (1.0 hour)
Category: Empennage
Cutting rivets for trim tab
Sep 05, 2020
Elevator
- (4.3 hours)
Category: Empennage
Cleaned and primed elevator parts
Elevator - clean and prime.jpg
Aug 18, 2020
Elevator
- (1.1 hours)
Category: Empennage
Test fit elevator parts
Aug 06, 2020
Elevator
- (2.5 hours)
Category: Empennage
Finished scuffing elevator parts
Aug 04, 2020
Elevator
- (.2 hour)
Category: Empennage
Scuff elevator parts
Jul 27, 2020
Elevator
- (.7 hour)
Category: Empennage
Deburr elevator parts
Jul 24, 2020
Elevator
- (.6 hour)
Category: Empennage
Deburr elevator parts
Jul 21, 2020
Elevator
- (.6 hour)
Category: Empennage
Deburr elevator parts
Jul 14, 2020
Elevator
- (1.0 hour)
Category: Empennage
Deburring elevator structure parts
Jul 14, 2020
Horizontal Stabilizer
- (.4 hour)
Category: Empennage
Finished riveting skins on horizontal stabilizer
Jul 09, 2020
Horizontal Stabilizer
- (2.4 hours)
Category: Empennage
Riveted horiz stab skin on flip side. Had to take rivet tool apart twice to clear jams
Horiz stab skinning.jpg
Jul 08, 2020
Horizontal Stabilizer
- (1.4 hours)
Category: Empennage
Riveted skins on one side of horiz stab
Jul 03, 2020
Elevator
- (.5 hour)
Category: Empennage
Finished removing plastic from elevator structure parts
Jul 01, 2020
Elevator
- (.5 hour)
Category: Empennage
Removed plastic from elevator parts
Jun 24, 2020
Horizontal Stabilizer
- (.8 hour)
Category: Empennage
Riveting skins on horiz stab. Riveting puller jamed again (#2) so pretty much dead in my tracks until getting it back from repair or I find something to work on given constraints in garage
Jun 23, 2020
Horizontal Stabilizer
- (1.3 hours)
Category: Empennage
Finished clecoing horiz stab skins on structure
Jun 22, 2020
Horizontal Stabilizer
- (.4 hour)
Category: Empennage
Put horiz stab back in fixtures and started clecoing skins on
Jun 20, 2020
Horizontal Stabilizer
- (1.3 hours)
Category: Empennage
Drill out 24 rivets that must go in as the skin is put on
Jun 19, 2020
Horizontal Stabilizer
- (.3 hour)
Category: Empennage
Completed riveting horiz stab structure
Jun 16, 2020
Horizontal Stabilizer
- (2.5 hours)
Category: Empennage
Riveted horiz stab structure
Horiz stab structure riveting.jpg
Jun 15, 2020
Horizontal Stabilizer
- (1 hour)
Category: Empennage
Extended worktable. Got horiz stab in the fixtures for riveting
Jun 06, 2020
Horizontal Stabilizer
- (1.3 hours)
Category: Empennage
Scuffed, clean, and prime the inside of the horiz stab skins
May 30, 2020
Horizontal Stabilizer
- (1.8 hours)
Category: Empennage
Removed plastic along rivet lines and deburred skins
Horiz stab plastic removed.jpg
May 26, 2020
Horizontal Stabilizer
- (.6 hour)
Category: Empennage
Removing plastic from horiz stab skins
May 17, 2020
Horizontal Stabilizer
- (1.7 hours)
Category: Empennage
Started assembling horiz stab structure. Feeding trim motor wire through the grommets was a bear.
May 16, 2020
Horizontal Stabilizer
- (3 hours)
Category: Empennage
Cleaned and primed horizontal stabilizer structure parts
May 11, 2020
Horizontal Stabilizer
- (1 hour)
Category: Empennage
Completed test assembly of horiz stab structure
May 04, 2020
Horizontal Stabilizer
- (1.5 hours)
Category: Empennage
Clecoed most of the horizontal stabilizer structure for test fit.
Apr 23, 2020
Horizontal Stabilizer
- (1.2 hours)
Category: Empennage
Finished scuffing horizontal stabilizer structure
Horiz stab structure scuffing.jpg
Apr 21, 2020
Horizontal Stabilizer
- (1 hour)
Category: Empennage
Scuffed horizontal stabilizer structure parts
Apr 16, 2020
Rudder
- (1.5 hours)
Category: Empennage
Cut rivets for rudder. Finished riveting skins. Part complete
Rudder completed.jpg
Apr 14, 2020
Rudder
- (1.6 hours)
Category: Empennage
Fixed mismatched holes in rudder skin and riveted one side of skin
Rudder ready for rivets.jpg
Apr 06, 2020
Rudder
- (1.2 hours)
Category: Empennage
Cleco'd main rudder skin in place
Apr 05, 2020
Horizontal Stabilizer
- (1.3 hours)
Category: Empennage
Finished deburring horizontal stab structure
Mar 31, 2020
Horizontal Stabilizer
- (.8 hour)
Category: Empennage
Deburr horizontal stabilizer parts
Mar 30, 2020
Horizontal Stabilizer
- (1.8 hours)
Category: Empennage
Deburr horizontal stab parts
Mar 26, 2020
Horizontal Stabilizer
- (2.0 hours)
Category: Empennage
Removed plastic from horizontal stabilizer structure parts
Horizontal stabilizer structure.jpg
Mar 21, 2020
Rudder
- (1.0 hour)
Category: Empennage
Cleaned and primed inside of rudder skins
Mar 19, 2020
Rudder
- (1.3 hours)
Category: Empennage
Deburr and scuff rudder skins
Rudder skin being scuffed.jpg
Mar 18, 2020
Rudder
- (1.7 hours)
Category: Empennage
Retrieve and remove plastic from rudder skins
Mar 14, 2020
Rudder
- (1.5 hours)
Category: Empennage
Searched for rudder tip and strobe mounting plate. No Joy. Studied rudder plans and parts for assembly
Mar 11, 2020
Rudder
- (2.0 hours)
Category: Empennage
Assembled rudder internal structure
Rudder structure.jpg
Mar 08, 2020
Vertical stabilizer
- (2.0 hours)
Category: Empennage
Completed riveting vert stab skin. Component complete
Vert stab complete.jpg
Mar 07, 2020
Rudder
- (.7 hour)
Category: Empennage
Clean and prime rudder structure parts
Mar 07, 2020
Vertical stabilizer
- (4.0 hours)
Category: Empennage
Primed inside vert stab skin. When dry, fit the skin on vert stab structure and began riveting.
Vert stab skinning 1.jpg
Mar 06, 2020
Rudder
- (1.0 hour)
Category: Empennage
Located rudder parts and scuffed in prep for primer
Mar 06, 2020
Vertical stabilizer
- (.3 hour)
Category: Empennage
Scuffed inside of vert stab skin in prep for primer
Mar 05, 2020
Vertical stabilizer
- (1.7 hours)
Category: Empennage
Find and deburr vertical stabilizer skin
Mar 03, 2020
Vertical stabilizer
- (.5 hour)
Category: Empennage
Ground off remaining rivet head, punched the rivet out and installed new rivet correctly
Feb 27, 2020
Vertical stabilizer
- (1.8 hours)
Category: Empennage
Finished riveting internal structure of vert stab, installed 4 rivnuts, and installed wiring for strobe
Vert stab structure complete.jpg
Feb 26, 2020
Vertical stabilizer
- (2.0 hours)
Category: Empennage
Cleco and start riveting vert stab structure
Feb 25, 2020
Vertical stabilizer
- (0.2 hour)
Category: Empennage
Drilled out 4 rivnuts from rear spar. Error in installation.
Feb 23, 2020
Vertical stabilizer
- (2.5 hours)
Category: Empennage
Started vert stab assembly. Installed rivnuts and protective sleeves for wiring
Initial vert stab assembly.jpg
Feb 22, 2020
Vertical stabilizer
- (1.5 hours)
Category: Empennage
Primed all internal vert stab parts
Feb 21, 2020
Vertical stabilizer
- (1.2 hours)
Category: Empennage
Drill holes for larger rivnuts and screws. Deburr and re-clean parts.
Feb 12, 2020
Vertical stabilizer
- (1.5 hours)
Category: Empennage
Reamed holes for grommets. Cleaned all parts for primer.
Feb 07, 2020
Vertical stabilizer
- (0.5 hour)
Category: Empennage
Completed test assembly of vert stab parts. Removed clecos for priming
Jan 31, 2020
Vertical stabilizer
- (2 hours)
Category: Empennage
Trial assembly of internal vertical stab parts. Ran out of 5/32 clecos so have to wait for order.
Trial assembly of vert stab.jpg
Jan 28, 2020
Vertical stabilizer
- (.2 hour)
Category: Empennage
Separated rudder parts from vertical stabilizer parts which had gotten mixed in. Wrapped in plastic to protect while in the box
Jan 25, 2020
Vertical stabilizer
- (2.0 hours)
Category: Empennage
Scuffed internal vertical stabilizer parts for primer
Scuffing vert stab parts.jpg
Jan 22, 2020
Vertical stabilizer
- (2.7 hours)
Category: Empennage
Finished deburring the internal parts of the vertical stabilizer. Next step is to scuff and prime mating surfaces.
Jan 06, 2020
Vertical stabilizer
- (1.5 hours)
Category: Empennage
Finished removing plastic from parts and started deburring.
Dec 21, 2019
Vertical stabilizer
- (0.3 hour)
Category: Empennage
Plastic removed from additional vert stab parts
Dec 04, 2019
Vertical stabilizer
- (1 hour)
Category: Empennage
Removed plastic from vertical stabilizer aluminium parts
Nov 18, 2019
Vertical stabilizer
- (.7 hour)
Category: Empennage
Identified vertical stabilizer parts and started prep for primer