EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
N56BZ
-
Listing for Category : controls
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (120)
Research
Workshop
- (2)
Empennage
- (35)
Fuselage
- (23)
Firewall
Tail Feathers
- (2)
Wings
- (6)
Controls
- (8)
Avionics
- (13)
Lighting
Instrument Panel
- (7)
Landing Gear
- (4)
Engine
- (9)
Propeller
- (1)
Fuel System
- (2)
Interior Finish
- (3)
Paint / Decals
- (1)
Inspection
- (2)
Tools
Photo Flight
- (2)
Builder Name:
Craig Cousins
-
Project:
Vans - RV-14A
-
VIEW REPORTS
Total Hours:
1453.5
Total Flight Time:
71
Start/Last Date:
Dec 23, 2019 - Oct 10, 2021
Engine:
Lycoming IO390
Panel:
Dynon Skyview, Garmin 175
Friendly URL:
https://eaabuilderslog.org?s=N56BZ
Home or Last Project Picture
Jun 27, 2020
The joy of joysticks
- (4 hours)
Category: Controls
After waiting months for back ordered parts, I was finally able to make the sticks work in unison
8254ECA6-2385-461F-94C5-7ADDD646406F.jpeg
A44AAB09-4E52-4C8B-9C19-4875D07FB91F.jpeg
Jun 25, 2020
Flaps final
- (8 hours)
Category: Controls
Finished with the flap controller
16BDA7DD-7ACC-4B03-9B30-AE1B50B6CA69.jpeg
Jun 24, 2020
And so it begins
- (16 hours)
Category: Controls
Laying out the panel and cutting
1089A052-377B-4F86-A8B0-62E05FC7A224.jpeg
E347FC2B-F39F-4149-B80C-A8DBE0F24D82.jpeg
E658FE5A-C6FA-42E1-ABB4-432D1BECDC96.jpeg
Jun 21, 2020
Flap Actuation System
- (10 hours)
Category: Controls
After waiting months for back ordered torque tubes, was finally able to install the flap system today.
8E2D53EB-4B2D-40FE-8AF6-7D5FAB7E9F8D.jpeg
B9719CE5-DA61-43EF-8341-1D733C36AFFE.jpeg
May 18, 2020
Control sticks
- (4 hours)
Category: Controls
Ray Allen grips installed. Ordered the micro Molex connectors to complete
44D05E6B-1EF0-4275-AF1A-4EA098A3F087.jpeg
4F77629E-50C3-4E50-81C5-32FF67722247.jpeg
A5697345-1941-44AB-ABD8-C7A5C3072D1C.jpeg
Apr 09, 2020
Rudder pedals and brakes
- (20 hours)
Category: Controls
Getting ready for installation, then 20 hours later, done
Need four 7.9 mm spacers. Had to make six to get 4
50F0E34F-00BC-4772-B321-C41646C84A4A.jpeg
5170FD4A-E008-4332-B2F1-943B40B80B25.jpeg
661D038B-0B4A-4C7B-B6D3-A4C236E7D9CA.jpeg
6B45BC5F-A926-4DBD-A240-5A6E0EAE00D7.jpeg
BF0DA0E3-2752-496A-9FFE-5CB94D147B83.jpeg
6E567F35-D8BB-41CC-B944-FDAB9D94377C.jpeg
F816F9EE-C940-450D-BD7F-7625263867A2.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.