Project:
N56BZ
-
Listing for Category : instrument panel
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (120)
Research
Workshop
- (2)
Empennage
- (35)
Fuselage
- (23)
Firewall
Tail Feathers
- (2)
Wings
- (6)
Controls
- (8)
Avionics
- (13)
Lighting
Instrument Panel
- (7)
Landing Gear
- (4)
Engine
- (9)
Propeller
- (1)
Fuel System
- (2)
Interior Finish
- (3)
Paint / Decals
- (1)
Inspection
- (2)
Tools
Photo Flight
- (2)
Builder Name:
Craig Cousins
-
Project:
Vans - RV-14A
-
VIEW REPORTS
Total Hours:
1453.5
Total Flight Time:
71
Start/Last Date:
Dec 23, 2019 - Oct 10, 2021
Engine:
Lycoming IO390
Panel:
Dynon Skyview, Garmin 175
Friendly URL:
https://eaabuilderslog.org?s=N56BZ
Home or Last Project Picture
Oct 18, 2020
More wiring
- (8 hours)
Category: Instrument Panel
Worked on routing and tie-wrapping. Made up a connector to mate with the canopy. Started ELT install. You need to order 2 batteries in order to complete
648E5931-D424-4D84-8F5D-B3C8274B7698.jpeg
90DF6FC4-F47C-4B3E-822A-13BE2255E643.jpeg
C725D09F-2F67-41F4-8806-9F937714EA4A.jpeg
Oct 17, 2020
90% done
- (12 hours)
Category: Instrument Panel
Wired all power, P-leads, tach leads, leads for canopy interconnects, master, starter and alternator switches, etc. First power up for the full electrical system. No smoke.
091B3469-3F2F-4DCF-83CD-248190DA01D4.jpeg
609D2C2B-2520-4976-8A6A-A98FBAAE26A4.jpeg
74D35A23-D882-4459-A1B5-3008591A0F55.jpeg
8AA5943C-999F-4F15-9957-F7EFE1DB4F27.jpeg
CBC3B154-619D-421B-BB58-3DA430F35EE2.jpeg
E1F806DA-629B-4D40-BE17-F2A48F2B1877.jpeg
Jun 28, 2020
CB panel done
- (6 hours)
Category: Instrument Panel
Circuit breaker panel final wiring completed. Powered up. No smoke
08EE4374-AC15-4794-944E-B1026E4ED9D9.jpeg
C363773B-7C37-4CAB-966C-C50932F66A5B.jpeg
FC472DF8-8C30-4A49-8F7B-CD27892F50C8.jpeg
Jun 27, 2020
Just more wiring
- (30 hours)
Category: Instrument Panel
Hours and days spent but always hard to see the progress here. My CB panel at 99 percent complete
1E49DD4F-BE67-4617-BD4E-76A4D1C1FF2C.jpeg
2F4CE185-ED57-4326-8DC0-5DFC9629E728.jpeg
9A9ED93A-F17F-4EB4-8C75-371DDF3C9185.jpeg
EFD86B9C-D05E-4FCF-9C15-2F0A1967F261.jpeg
D4EFD4D4-4D1D-4292-BEF6-1563850F8AF4.jpeg
Jun 25, 2020
Continued wiring.
- (16 hours)
Category: Instrument Panel
Lighting controller done. Continue running wires from the CB panel to the instrument panel while I am preparing the panel.
247D8AA9-7A89-4D8F-B1CD-41B816CFEB51.jpeg
Jun 24, 2020
And so it begins
- (16 hours)
Category: Instrument Panel
Laying out, cutting and drilling
Jun 24, 2020
And so it begins
- (16 hours)
Category: Instrument Panel
Laying out, cutting and drilling
I tried the faux carbon fibre overlay and have since decided against it.
Skyview fits
867567FC-709C-414B-AF5F-F5A3D5085B67.jpeg
87879200-B9D5-418E-9B2C-9F2FE52561F2.jpeg