EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
N56BZ
-
Listing for Category : empennage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (120)
Research
Workshop
- (2)
Empennage
- (35)
Fuselage
- (23)
Firewall
Tail Feathers
- (2)
Wings
- (6)
Controls
- (8)
Avionics
- (13)
Lighting
Instrument Panel
- (7)
Landing Gear
- (4)
Engine
- (9)
Propeller
- (1)
Fuel System
- (2)
Interior Finish
- (3)
Paint / Decals
- (1)
Inspection
- (2)
Tools
Photo Flight
- (2)
Builder Name:
Craig Cousins
-
Project:
Vans - RV-14A
-
VIEW REPORTS
Total Hours:
1453.5
Total Flight Time:
71
Start/Last Date:
Dec 23, 2019 - Oct 10, 2021
Engine:
Lycoming IO390
Panel:
Dynon Skyview, Garmin 175
Friendly URL:
https://eaabuilderslog.org?s=N56BZ
Home or Last Project Picture
Mar 22, 2020
Tip fairings
- (12 hours)
Category: Empennage
Sanding, shaping,sanding, more sanding, dust, dust, dust. Almost ready to close in the HS and VS tip fairings. Tail cone now relaxing in the living room.
297EA353-23CD-47EC-AD5F-B36A45124459.jpeg
914BFD66-FCC3-4261-84B8-A43C3C78AB47.jpeg
C9577DB8-1349-4C14-A868-50F1F0DABE42.jpeg
EC5D3B37-478D-42BF-A098-CD68B3ED18A2.jpeg
Mar 15, 2020
Trail fit, HS and VS
- (4 hours)
Category: Empennage
Install the HS and complete the match drilling. Test fit the VS
78EC33F3-7827-45D7-A8F2-76FA7F6015C7.jpeg
B691CB7F-B8D7-4E18-8791-730545A917DD.jpeg
Mar 15, 2020
Elevator installation
- (6 hours)
Category: Empennage
Fitting the elevators onto the HS. Most time spent working the interference out of the rounded leading edges. Rod bearings went in ok to spec. The bushing used to keep the drill centered while drilling the control arms to attach to the center bearing does not accommodate a #30 bit. A smaller one was required
DD81D3A3-D240-4C4E-A0E1-89CD2ED78824.jpeg
ED1D81CE-E4DE-4F28-AFFB-721DA159ED1D.jpeg
Mar 15, 2020
Tail cone closing
- (8 hours)
Category: Empennage
With the help of my wife, finally got the tail cone closed
2F6246F2-B855-4AE2-9A2D-6A87CE6BF3A1.jpeg
Just us
8354E54E-DFF9-4B29-9270-D2E6DAFF4F5B.jpeg
My wife bucking rivets and performing quality control (Hit it again!!)
Cushion and pillow for comfort
AAA6ECA1-8527-4FDD-AC93-6BC10F4A4DDC.jpeg
FAA7DF51-212B-40B5-89C2-35917E41B0C6.jpeg
Mar 12, 2020
Tail come close out
- (12 hours)
Category: Empennage
Almost ready to have my wife sit inside and buck the rivets for the tail cone close out
5F1367B6-8D41-455B-BD10-8A998C3778EC.jpeg
F349164D-01C1-4712-A371-435FB587C55D.jpeg
Mar 08, 2020
Top skins
- (4 hours)
Category: Empennage
And so it begins
I usually smile
What's all this blue stuff
Mar 08, 2020
Test fit and match drill the vertical stabilizer
- (18 hours)
Category: Empennage
Rear deck completed with some help. VS installed for match drilling. My inspection crew drops over. 2 builders and the A&P I work with maintaining my RV8
0991FCD2-59CD-4F2C-A1B5-4196B6DB1D19.jpeg
3E9CBE5C-EB34-4A07-8492-0017DB2DD235.jpeg
A85C31CA-B53A-4B17-B814-71C07A1DEF2F.jpeg
B69C1B41-FF39-4383-86F7-C48BD7615EE8.jpeg
Mar 05, 2020
Rear Fuselage Wiring Harness
- (5 hours)
Category: Empennage
Mar 05, 2020
Rear Fuselage Wiring Harness
- (5 hours)
Category: Empennage
Vans asks you to run the wiring harness in the trough of the J-channel. Unfortunately, there is not enough clearance between the channel and the bulkhead. The phone wire to the ELT had to be run on the underside (not a problem). The clearance on the top side is tight enough that I feel it needed some protection from the sharp edge of the J channel and the bulkhead.
Protect your wiring harness from the sharp edge of the bulkhead where necessary
Slice some heat-shrink and put it over the edge of the J channel. Tie-wrap on place
Wires exit the J-channel at the back. Put some sliced heat shrink on the edge where it exits
Feb 23, 2020
Finally the empannage
Category: Empennage
Fitting the bulkheads, stringers, longerons and skins. Cleco heaven
02F25F9E-30AC-44EE-8F1E-44286AA49E5C.jpeg
0ED58364-202D-498E-A4CA-7C627BEE90E0.jpeg
60D3E25D-979D-4CDF-887E-DC87756D0250.jpeg
Feb 23, 2020
Left Elevator
- (20 hours)
Category: Empennage
After a month of waiting on one part due to a mix up, the left elevator is finally done. Just need to install the trim motor (very small job)
29A07478-0171-46AE-9661-538344BE172F.jpeg
802FC25B-8A27-4157-817B-89245E80DA67.jpeg
9B2E02AB-7A94-4C04-BFDD-600944951EE3.jpeg
Feb 16, 2020
Bottom skin and large bulkheads
- (8 hours)
Category: Empennage
Finally starting on the empennage. Building the first part up side down was fun. Turned it over and supported the bulkheads temporarily with tape so that I could inspect the rivets.
0C6BCF8F-CEBF-4E00-B24C-A0BC690041AA.jpeg
0F2714AE-1C75-4709-99FF-F34DB6873074.jpeg
31CDECE2-2EDA-4518-B8B2-A7972EA94201.jpeg
377382E3-936A-4DB9-944B-DA1F3492375F.jpeg
A72A0CC0-AD0D-4A3A-AC58-FCF77B40EFAF.jpeg
D67C4701-9AFC-4A29-BFF4-D6FDB808CAC8.jpeg
Feb 15, 2020
On to the empennage
- (12 hours)
Category: Empennage
Finish up the trim tab using the angled rivet set then started the lower skin, stringers and bulkheads
632AEB38-E529-45CD-9816-1E61D42BD392.jpeg
6E6B5A64-C753-46CD-97A6-68FE13FEEE95.jpeg
DEFED03A-DAA6-42C5-908C-0B4BB97A0D71.jpeg
F37F8F6A-76AC-45DC-8BA7-EE220753854F.jpeg
F4848F5E-D4A2-4B38-B512-01AB0472CFFE.jpeg
Feb 01, 2020
Right elevator done
- (8 hours)
Category: Empennage
Finally closed the trailing edge and rolled the leading edge. The 4 degree offset dies from Aircraft Tool Supply worked like a charm on the double flush rivets
2769502C-5F95-47ED-8427-2DE2EA14244B.jpeg
31486BEF-5C6E-48E4-8D9E-7D2B748D398C.jpeg
5F25A8AF-FBA1-40B2-BD37-DDBB2C5AD951.jpeg
Jan 28, 2020
Parts invade the living room
- (4 hours)
Category: Empennage
Right elevator in the warmth for the adhesive to set after installation of the foam ribs. Moved furniture to make room where it won't get stepped on.
Jan 28, 2020
Parts invade the living room
- (4 hours)
Category: Empennage
Right elevator in the warmth for the adhesive to set after installation of the foam ribs. Moved furniture to make room where it won't get stepped on.
B5BE0B49-F41C-4039-88D3-A1AA422D17A5.jpeg
Jan 26, 2020
Right elevator almost there
- (10 hours)
Category: Empennage
Pretty much closed up. Trailing edge bonding to the bottom TE using the 3M tape. Next glue in the foam ribs then rivet the trailing edge. A firm straight edge is absolutely necessary for this part of the assembly. A 4 foot level match drilled works great.
2B1832EB-FCAE-4DF1-AB4B-51FF91C5C2F1.jpeg
Jan 25, 2020
Right Elevator
- (10 hours)
Category: Empennage
If I have one complaint about the build so far, it's the jumping back and forth between the left and right elevator on every Page in this section. Would prefer to work on one at a time which is what I eventually did.
580CD7D7-427E-4657-8967-5B80E2ACA1BF.jpeg
Jan 21, 2020
Trim tab hinge
- (2 hours)
Category: Empennage
Trim tab hinge installed on elevator and trim tab Z spar. Perfectly straight.
E6696390-4E75-4EA5-B28C-D7432D4965D4.jpeg
Jan 18, 2020
HS done
- (12 hours)
Category: Empennage
Final assembly and riveting completed today
2BD0F82E-E95F-4BD4-9053-E51FC3CBA282.jpeg
374D11B2-340E-4E4D-A5FD-DD2011F8C6FF.jpeg
Jan 10, 2020
HS cleco heaven
- (6 hours)
Category: Empennage
Getting ready to rivet and some help from my wife
BC80B6A2-AB32-4013-A24A-10B98E659669.jpeg
F512AF66-9659-418A-B901-5BBD226C0565.jpeg
Jan 07, 2020
The frame finally gets installed into the skins
- (4 hours)
Category: Empennage
It all lines up. Now I can cleco it to death
4AFD326D-F06C-4886-9121-028135BD37C5.jpeg
Jan 06, 2020
HS ready for assembly
- (20 hours)
Category: Empennage
All skins dimpled. Frame built. Getting ready to start riveting the nose ribs into the skins.
Jan 06, 2020
HS ready for assembly
- (20 hours)
Category: Empennage
All skins dimpled. Frame built. Getting ready to start riveting the nose rubs into the skins.
Jan 06, 2020
HS ready for assembly
- (20 hours)
Category: Empennage
All skins dimpled. Frame built to insertion stage. Getting ready to start riveting the nose ribs into the skins.
BFD35306-C84F-402D-90E6-169FF5F973F1.jpeg
Jan 02, 2020
Horizontal Stabilizer Main Spar
- (4 hours)
Category: Empennage
This may not look like much but getting the HS main spar, spar caps, stringers and doublers ready is at least 4 hours of work. I lost count of the number of match drill holes. Lots of deburring needed.
3F0F4708-84BA-43CD-967A-0DE025275610.jpeg
Jan 01, 2020
A bit of help from my youngest daughter
- (3 hours)
Category: Empennage
Preparing the HS spar. Installing the doubler and brackets
12CA176F-D9D4-4077-9871-62AE8B949566.jpeg
27D8A612-8E5B-4CFC-B358-702B197C3BFC.jpeg
Jan 01, 2020
Happy New Year
- (6 hours)
Category: Empennage
Rudder done this morning. Nice way to start 2020
D069D6A5-EA75-4FAD-8E4D-ECE0CA38278F.jpeg
Dec 31, 2019
Rudder almost done
- (10 hours)
Category: Empennage
Rolling of leading edge done. Just need to pop the rivets then on to the HS
B34B4865-5333-421F-86CD-780D8DBD0439.jpeg
Dec 28, 2019
Quality inspectors
- (4 hours)
Category: Empennage
Friends (A&P plus RV8 builder) giving me a hand to do the rudder internal riveting of the stiffeners. It's definitely at least a two person job.
Checking the work
Yup, that trailing edge is straight
Dec 26, 2019
Stab final assembly
- (12 hours)
Category: Empennage
Done until it's time to do the fiberglass work
Done!
Dec 25, 2019
Dimple, dimple, it's kind of simple
- (10 hours)
Category: Empennage
Final prep of rudder and VS skins. Everything primed where it counts and ready for final assembly
FC50AFF3-8CB2-4990-B0EE-88E243573495.jpeg
Dec 24, 2019
Rudder trial fit
- (10 hours)
Category: Empennage
Lots of clecos still to install the final drill the skins
AECD6193-1DD3-4F7B-BD65-649B4E374898.jpeg
C6BB1167-782C-476A-B71B-0A2386DFA69A.jpeg
436C88CD-038C-44F5-83B1-4FD1DA4E66B6.jpeg
Dec 23, 2019
Vertical Stab first trial assembly
- (5 hours)
Category: Empennage
CB058F5A-599F-4370-9823-4CC769F2639F.jpeg
E5A95EA6-6314-40FD-A9C6-8B427985D146.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.