Project:
PA-22SuperPacer
-
Listing for Category : fuselage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (321)
Research
- (7)
Workshop
- (13)
Empennage
Fuselage
- (28)
Firewall
Tail Feathers
Wings
- (268)
Controls
Avionics
- (1)
Lighting
Instrument Panel
Landing Gear
- (3)
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
- (1)
Builder Name:
Alan Levinson
-
Project:
Piper PA-22 Super
-
VIEW REPORTS
Total Hours:
1121.8
Total Flight Time:
2
Start/Last Date:
Nov 09, 2018 - No Finish Date
Engine:
Lycoming O-320-B1A
Propeller:
McCauley 1A175/GM8244
Friendly URL:
https://eaabuilderslog.org?s=PA-22SuperPacer
Home or Last Project Picture
Jun 01, 2023
Rudder bar and cables
- (4 hours)
Category: Fuselage
Temporarily install rudder bar, master cylinders, rudder cable w/ pulleys. Measure length needed, add 21.75". Old cable 180.125". Clean up parts, cut fittings off old cables, and prime paint.
IMG_20230602_094623.jpg
May 30, 2023
Rudder bar and stab yoke
- (8 hours)
Category: Fuselage
Found rudder bar clamps, installed rudder bar temporarily. Installed horizontal stab trim yoke.
May 26, 2023
Controls
- (2 hours)
Category: Fuselage
Clean up from painting. Put things away. Start assembling control column. Put vertical stab on fuselage.
May 21, 2023
Painting parts
- (3.5 hours)
Category: Fuselage
Prep and prime Ekopoxy rudder bar, rudder pedals, stab trim yoke, vertical stab, engine mount.
signal-2023-05-22-22-09-49-361.jpg
May 19, 2023
Rudder bar
- (2.5 hours)
Category: Fuselage
Disassembled and cleaned rudder bar.
Apr 29, 2023
Painting
- (4 hours)
Category: Fuselage
Paint Stewart's top coat on fuselage where small welding was done and control column, flap handle and elevator bellcrank.
Apr 28, 2023
Painting
- (4 hours)
Category: Fuselage
Paint Stewart's primer on fuselage where small welding was done and control column, flap handle and elevator bellcrank.
Apr 13, 2023
Took airframe to welder
- (1 hour)
Category: Fuselage
Took airframe to Sam Porter to finish welding up tubes that box in tail.
Apr 09, 2023
Baggage door frame
- (5 hours)
Category: Fuselage
Put rivnuts in top of door frame for interior panels. Sorted through flap pulleys, found a couple of damaged ones. Went through aileron pulleys, a couple of bearings are rough. Ordering some replacements.
Apr 08, 2023
Baggage door frame
- (1 hour)
Category: Fuselage
Found pieces for door frame and started to assemble. Need to consult tear down pictures.
Apr 08, 2023
Welding
- (2 hours)
Category: Fuselage
Tried setting up oxy-acetylene torch and practicing on scrap. No luck, kept popping and blowing holes in tubing.
Mar 31, 2023
Airframe top coat
- (3 hours)
Category: Fuselage
Turned airframe LH side down. Spraying top coat. Ran out of 2nd qt of Insignia White Aerothane.
Mar 30, 2023
Airframe top coat
- (5 hours)
Category: Fuselage
Fuselage on RH side. Spraying top coat.
Mar 28, 2023
Airframe top coat
- (4 hours)
Category: Fuselage
Airframe right side up. Spraying top coat. Tiki and Thea got another qt of Aerothane paint in Fairbanks.
Mar 26, 2023
Prime paint
- (1.5 hours)
Category: Fuselage
Spray primer on backseat lower tube. Clean up a little. Out of Aerothane top coat epoxy.
Mar 24, 2023
Painting airframe
- (10 hours)
Category: Fuselage
Airframe upside down. Started spraying top coat Aerothane insignia white.
Mar 23, 2023
Prime paint airframe
- (2.5 hours)
Category: Fuselage
Turn airframe upside down. Final spraying of dark green primer. Ended up using 1 qt white primer, and 0.8 qt dark green primer.
IMG_20230322_231849.jpg
Mar 22, 2023
Primer painting airframe
- (2.5 hours)
Category: Fuselage
Turned fuselage right side up. Painted on more dark green.
IMG_20230322_231849.jpg
Mar 21, 2023
Prime airframe
- (4.5 hours)
Category: Fuselage
Turned airframe onto LH side. Continue primer painting w/ dark green.
Mar 20, 2023
Painting primer on airframe
- (6.5 hours)
Category: Fuselage
Turned airframe on to RH side w/ front on a half height saw horse. Started painting w/ dark green primer.
IMG_20230321_010022.jpg
Mar 18, 2023
Spraying primer
- (4.5 hours)
Category: Fuselage
Spraying primer on fuselage tubing.
Mar 17, 2023
Prime paint
- (8 hours)
Category: Fuselage
Started brushing on white primer then switched to spraying. Very slow going.
signal-2023-03-17-08-30-41-972.jpg
Mar 16, 2023
P/u fuselage
- (5 hours)
Category: Fuselage
Got fuselage from sandblasting in Fairbanks. Also p/u more 100' control cable Nicopress sleeves, and thimbles.
signal-2023-03-16-17-56-43-694.jpg
Mar 10, 2023
Sandblasting
- (5 hours)
Category: Fuselage
Took fuselage to Fairbanks to get sandblasting. Picked up Polyfiber epoxy primer (2 qts, 2 colors) and Aerothane top coat.
signal-2023-03-10-13-03-09-984.jpg
Mar 04, 2023
Change angle of strut fittings
- (6 hours)
Category: Fuselage
Installed wings on fuselage with JW and Greg's help. Leveled fuselage and adjusted wing dihedral to PA-22 specs (4 ⅞"). Heated strut fittings with rose bud torch and lowered fitting angle with 16" Crescent wrench. Measured length for front strut=121 23/32", rear 125 9/32.
signal-2023-03-04-17-06-27-536.jpg
signal-2023-03-04-12-16-30-717.jpg
signal-2023-03-04-15-28-57-944.jpg
Feb 23, 2023
Fit temporary landing gear
- (3 hours)
Category: Fuselage
Got old beat up landing gear from Sutton Aircraft Salvage for $10! Had to grind a little off the RH gear to fit the fuselage fittings. Mounted gear and wheels (from Truman) and tied rope between legs to hold together. Put old 6" Scott t/w on Citabria tail spring and mounted on fuselage. Fuselage is somewhat mobile now!