EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
PA-22SuperPacer
-
Listing for Category : landing gear
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (321)
Research
- (7)
Workshop
- (13)
Empennage
Fuselage
- (28)
Firewall
Tail Feathers
Wings
- (268)
Controls
Avionics
- (1)
Lighting
Instrument Panel
Landing Gear
- (3)
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
- (1)
Builder Name:
Alan Levinson
-
Project:
Piper PA-22 Super
-
VIEW REPORTS
Total Hours:
1121.8
Total Flight Time:
2
Start/Last Date:
Nov 09, 2018 - No Finish Date
Engine:
Lycoming O-320-B1A
Propeller:
McCauley 1A175/GM8244
Friendly URL:
https://eaabuilderslog.org?s=PA-22SuperPacer
Home or Last Project Picture
Apr 30, 2023
Mostly finish temp temp landing gear
Category: Landing Gear
Finish bracing. Just need two casters.
IMG_20230430_184521.jpg
Apr 29, 2023
Make shop gear
- (3 hours)
Category: Landing Gear
Start building temp main gear out of unistrut. It will be narrower than real gear and a little shorter. Easier to work around until wings go on.
IMG_20230430_112950.jpg
Mar 04, 2023
Temp gear
- (1.5 hours)
Category: Landing Gear
Got a 3' stick of tubing that slides into the shock strut tube. Installed on fuselage w/ axles level. Then marked and drilled tubing. Now have solid landing gear.
signal-2023-03-04-11-46-44-111.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.