Project: PA-22SuperPacer   -  
            Listing for Category : workshop
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Alan Levinson   -  
Project:   Piper PA-22 Super   -   VIEW REPORTS
Total Hours:1121.8
Total Flight Time:2
Start/Last Date:Nov 09, 2018 - No Finish Date
Engine:Lycoming O-320-B1A
Propeller:McCauley 1A175/GM8244
 
Friendly URL: https://eaabuilderslog.org?s=PA-22SuperPacer

Home or Last Project Picture

May 31, 2023     Move parts storage - (2 hours) Category: Workshop
Move parts stored in greenhouse to garage and shed.
 
Apr 08, 2023     Cleanup and parts - (2 hours) Category: Workshop
Clean up some things. Get parts from shed for fuselage.
 
Apr 01, 2023     Clean up - (2 hours) Category: Workshop
Clean up from painting. Clean and assemble spray gun. Put things away. Sweep the floor.
 
Feb 25, 2023     Wing stands - (7 hours) Category: Workshop
Construct stands to support the wings on the fuselage w/o struts.
 
Apr 28, 2022     Putting away hardware. - (2 hours) Category: Workshop
Putting away hardware that came in the mail. Organizing hardware better.
 
Apr 26, 2022     Clean up - (1 hour) Category: Workshop
Clean up tools and sweep bench, floor. Moved bandsaw so it isn't in front of the window.
 
Mar 29, 2022     Clean up - (1 hour) Category: Workshop
Disassemble and put away aileron and flap jig. Put away tools, clean up mess.
 
Feb 05, 2021     Receive lts of hardware for wings - (3 hours) Category: Workshop
Received bolts, washers, nuts, screws, cotter pins from Acft Spruce, Northland, and Glacier Acft. Put most into organizer bins.
 
Dec 14, 2020     small parts racks - (3 hours) Category: Workshop
Made two frames or racks covered in metal mesh to clean and spray paint small parts on.
 
May 25, 2020     rear spar assembly - (2 hours) Category: Workshop
up drill angle extrusions to final #5 size, clean up chips, start disassembly of spar doubler plates and begin deburring
 
May 18, 2020     rear spar assembly - (1.5 hours) Category: Workshop
install and start up drilling angle extrusions between spar butt and strut mount
 
May 16, 2020     rear spar assembly - (1.5 hours) Category: Workshop
drilling holes for aileron pulley mounts, locate and start installing angle extrusions between butt and strut mount
 
May 06, 2020     seasonal rearrangiong - (1 hour) Category: Workshop
Moved all of the wing parts, landing gear, etc. out of the greenhouse and into one side of the garage
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.