Project: S-21   -  
            Listing for Category : Engine
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Kent Ingram   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:538.2
Total Flight Time:
Start/Last Date:May 09, 2020 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=S-21

Home or Last Project Picture

Mar 12, 2023     LSE sensors mounted, other wiring - (5 hours)       Category: Engine
I had taped the 40/1000” spacers onto the sensors Saturday night and so this morning I mounted them tight enough to hold but loose enough to adjust and then temp mounted the flywheel to set the clearance. Once this was set I undid the mounting screws one at a time and used blue loctite on them.
Routing the LSE sensor wires was a head scratcher for me, I did a lot more looking online and finally decided to go above the engine for both the upper and lower sensor wires. Since everything is already soldered on the LSE wire harness I had to cut a couple of slots in the baffling panels with holes and grommets to secure the sensor wiring.
I also shortened my previously finished master solenoid switch wire and also shortened and finished the starter solenoid switch wire.


 