Project:
ElectricXenos
-
Listing for Category : workshop
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (138)
Research
- (5)
Workshop
- (17)
Empennage
Fuselage
Firewall
Tail Feathers
- (71)
Wings
- (14)
Controls
Avionics
- (14)
Lighting
Instrument Panel
- (2)
Landing Gear
Engine
- (7)
Propeller
- (2)
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
- (6)
Builder Name:
Timothy Drager
-
Project:
Electric motor
-
VIEW REPORTS
Total Hours:
591
Total Flight Time:
Total Expense:
$122553.00
Start/Last Date:
Aug 30, 2021 - Aug 30, 2023
Engine:
Zero DSR
Propeller:
PTip
Panel:
FALKEN AVIONICS , FLIGHTVIEW EFIS FLIGHTBOX PRO, AIR DATA
Friendly URL:
https://eaabuilderslog.org?s=ElectricXenos
Home or Last Project Picture
May 04, 2023
MOVED - BOXES AND BOXES
- (50 hours)
Category: Workshop
Got married to the love of my life. Moved into her farm. All workshop tools moved. Unpacking now.
IMG_8987.jpeg
Oct 01, 2022
Fuselage inside workshop
- (5 hours)
Category: Workshop
The main fuselage of a Sonex is 40 inches. The workshop door needed 42 inches to clear not only the fuselage, but the latch and exterior aluminum L brackets.
I removed the pre-hung door and two 2x6 studs surrounding it. Viola: 42 inches.
Started inventory of all parts.
58607AD3-FA66-4148-9E44-A7F4F49BAAB6.jpeg
Sep 20, 2022
DELIVERY DAY
- (3 hours)
Category: Workshop
Delivery day for the quick build kit!
It was a cluster bomb because:
- 18 wheeler got stuck approaching the house
- 18 wheeler could not get into the 400ft driveway, necessitating 5 trips up and down the driveway with a trailer
- rained
- police
- blocked school buses
First-world problems…
The good news is that the parts were safely delivered…no injury to people or airplane.
7FCC01D5-F0F5-4D76-B702-93C1D40F7DB3.jpeg
A150C583-0CFC-4619-B738-C23F7DF5B36F.jpeg
FD7F8F73-0290-420F-976E-13AC9BD8F3CF.jpeg
F3125ECA-69BF-4FA1-A89F-B88DBD557F92.jpeg
2E9A5175-2EC1-4588-8D38-AA371F24C736.jpeg
11BFAC73-1647-441B-A95D-22BC8C818C42.jpeg
81CE31E5-7194-4377-A5A2-5EEBF3670B3E.jpeg
Jan 04, 2022
Analyzed squareness of build bench
- (2 hours)
Category: Workshop
Went flying in my Cessna 172, then:
- organized the work bench
- analyzed squareness of aluminum work bench
I need to square the stabilator spar cap, tabs and ribs.
Jan 03, 2022
Installed shop air and vice
- (7 hours)
Category: Workshop
Procured and installed shop air and vice.
IMG_4320.jpg
IMG_4319.jpg
Jan 03, 2022
Rearranged workshop
- (4 hours)
Category: Workshop
Installed two cabinets
Installed 1971 stereo from my parents. Played vinyl LP American Pie.
Installed air compressor
Cleaned up pegboard mounting pegs
IMG_4310.jpg
Dec 19, 2021
Set up 25 pegboard hooks
- (1 hour)
Category: Workshop
Set up 25 pegboard hooks, mainly for mill tools : collets and mills.
Dec 10, 2021
Erected five peg boards
- (6 hours)
Category: Workshop
Erected five peg boards for tool organization.
S.png
Dec 09, 2021
Installed table saw
- (2 hours)
Category: Workshop
Installed Craftsman table saw from Lowes.
Dec 09, 2021
Installed mini split heat pump
- (8 hours)
Category: Workshop
Installed mini split heat pump, a Mitsubishi 9K, which can heat down to -13 degrees F. See
https://youtu.be/51Zx1MJL3Qc
I.png
O.png
Nov 30, 2021
POWERED UP WORKSHOP
- (6 hours)
Category: Workshop
Wired two breaker boxes for workshop 50amp service at 220VAC.
View recent photos.png
Nov 29, 2021
Installed 50Amp cable in garage
- (5 hours)
Category: Workshop
Placed and cemented PVC conduit and cable in garage. Will energize 50Amp service tomorrow. Contacted HVAC installer about installing a Mitsubishi 9K BTU heat pump, SEER 30.5
Nov 28, 2021
Completed power cable and conduit run to Garage
- (4 hours)
Category: Workshop
Placed and cemented PVC conduit and cable into trench from workshop to garage, where there is 200 Amp service. Inside garage work can commence tomorrow. 50Amp service will be installed.
Nov 27, 2021
Wire workshop
- (16 hours)
Category: Workshop
- Procured conduit, cable, fittings, breaker box
- Installed breaker box, 12 breakers
- Dug trench for conduit, 50% rock
- Installed 26 ft of cable in conduit
Oct 01, 2021
Parts Bins and Pegboard
- (1 hour)
Category: Workshop
Small parts storage bins, shelves, hooks and pegboard.
Capture.jpg
Sep 28, 2021
Ordered 12x24 shed workshop
- (8 hours)
Category: Workshop
Includes:
4 x 4 Pressure Treated Skids form the foundation Floor joists are standard 2 x 4's 8″ on center 3/4″ T&G SmartFinish Wood Flooring Walls are Standard with 2 x 4s 16″ OC 8′ High Walls rtside Siding Finishes the Exterior, 1-9 x 7 Solid Steel Garage Door w/ Aluminum Diamond Plate Guard (Note: 8 x 7 Garage Door in 10′ Wide Buildings) 36″ Single Door with Aluminum Floorguard Transom Windows above Garage Door Includes 2- 24 x 36″ Windows w/Screens Trim around Windows 2- Pair Shutters Rafters are constructed of 2 x 6s 24″ OC 3 Ridge Beam 10- Pitch Roof Hurricane Ties securing Rafters to Wall 7″ Gable Overhang Arch Gable Vents 4′ Loft on Gable of Building Roof consists of ng Tar Paper Standing seam metal roof. Insulated 100%. Climate control w/ mini split.
image1.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-