Project: ElectricXenos   -  
            Listing for Category : workshop
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Timothy Drager   -  
Project:   Electric motor   -   VIEW REPORTS
Total Hours:591
Total Flight Time:
Total Expense:$122553.00
Start/Last Date:Aug 30, 2021 - Aug 30, 2023
Engine:Zero DSR
Propeller:PTip
Panel:FALKEN AVIONICS , FLIGHTVIEW EFIS FLIGHTBOX PRO, AIR DATA
 
Friendly URL: https://eaabuilderslog.org?s=ElectricXenos

Home or Last Project Picture

May 04, 2023     MOVED - BOXES AND BOXES - (50 hours)       Category: Workshop
Got married to the love of my life. Moved into her farm. All workshop tools moved. Unpacking now.


 
Oct 01, 2022     Fuselage inside workshop - (5 hours)       Category: Workshop
The main fuselage of a Sonex is 40 inches. The workshop door needed 42 inches to clear not only the fuselage, but the latch and exterior aluminum L brackets.
I removed the pre-hung door and two 2x6 studs surrounding it. Viola: 42 inches.

Started inventory of all parts.


 
Sep 20, 2022     DELIVERY DAY - (3 hours)       Category: Workshop
Delivery day for the quick build kit!

It was a cluster bomb because:
- 18 wheeler got stuck approaching the house
- 18 wheeler could not get into the 400ft driveway, necessitating 5 trips up and down the driveway with a trailer
- rained
- police
- blocked school buses

First-world problems…
The good news is that the parts were safely delivered…no injury to people or airplane.


 
Jan 04, 2022     Analyzed squareness of build bench - (2 hours) Category: Workshop
Went flying in my Cessna 172, then:

- organized the work bench
- analyzed squareness of aluminum work bench

I need to square the stabilator spar cap, tabs and ribs.
 
Jan 03, 2022     Installed shop air and vice - (7 hours)       Category: Workshop
Procured and installed shop air and vice.


 
Jan 03, 2022     Rearranged workshop - (4 hours)       Category: Workshop
Installed two cabinets
Installed 1971 stereo from my parents. Played vinyl LP American Pie.
Installed air compressor
Cleaned up pegboard mounting pegs


 
Dec 19, 2021     Set up 25 pegboard hooks - (1 hour) Category: Workshop
Set up 25 pegboard hooks, mainly for mill tools : collets and mills.
 
Dec 10, 2021     Erected five peg boards - (6 hours)       Category: Workshop
Erected five peg boards for tool organization.


 
Dec 09, 2021     Installed table saw - (2 hours) Category: Workshop
Installed Craftsman table saw from Lowes.
 
Dec 09, 2021     Installed mini split heat pump - (8 hours)       Category: Workshop
Installed mini split heat pump, a Mitsubishi 9K, which can heat down to -13 degrees F. See https://youtu.be/51Zx1MJL3Qc


 
Nov 30, 2021     POWERED UP WORKSHOP - (6 hours)       Category: Workshop
Wired two breaker boxes for workshop 50amp service at 220VAC.


 
Nov 29, 2021     Installed 50Amp cable in garage - (5 hours) Category: Workshop
Placed and cemented PVC conduit and cable in garage. Will energize 50Amp service tomorrow. Contacted HVAC installer about installing a Mitsubishi 9K BTU heat pump, SEER 30.5
 
Nov 28, 2021     Completed power cable and conduit run to Garage - (4 hours) Category: Workshop
Placed and cemented PVC conduit and cable into trench from workshop to garage, where there is 200 Amp service. Inside garage work can commence tomorrow. 50Amp service will be installed.
 
Nov 27, 2021     Wire workshop - (16 hours) Category: Workshop
- Procured conduit, cable, fittings, breaker box
- Installed breaker box, 12 breakers
- Dug trench for conduit, 50% rock
- Installed 26 ft of cable in conduit
 
Oct 01, 2021     Parts Bins and Pegboard - (1 hour)       Category: Workshop
Small parts storage bins, shelves, hooks and pegboard.


 
Sep 28, 2021     Ordered 12x24 shed workshop - (8 hours)       Category: Workshop
Includes:
4 x 4 Pressure Treated Skids form the foundation Floor joists are standard 2 x 4's 8″ on center 3/4″ T&G SmartFinish Wood Flooring Walls are Standard with 2 x 4s 16″ OC 8′ High Walls ��rtside Siding Finishes the Exterior, 1-9 x 7 Solid Steel Garage Door w/ Aluminum Diamond Plate Guard (Note: 8 x 7 Garage Door in 10′ Wide Buildings) 36″ Single Door with Aluminum Floorguard Transom Windows above Garage Door Includes 2- 24 x 36″ Windows w/Screens Trim around Windows 2- Pair Shutters Rafters are constructed of 2 x 6s 24″ OC 3 ���Ridge Beam 10- Pitch Roof Hurricane Ties securing Rafters to Wall 7″ Gable Overhang Arch Gable Vents 4′ Loft on Gable of Building Roof consists of ��ng Tar Paper Standing seam metal roof. Insulated 100%. Climate control w/ mini split.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.