Project: ElectricXenos   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Timothy Drager   -  
Project:   Electric motor   -   VIEW REPORTS
Total Hours:583
Total Flight Time:
Total Expense:$122553.00
Start/Last Date:Aug 30, 2021 - Aug 30, 2023
Engine:Zero DSR
Propeller:PTip
Panel:FALKEN AVIONICS , FLIGHTVIEW EFIS FLIGHTBOX PRO, AIR DATA
 
Friendly URL: https://eaabuilderslog.org?s=ElectricXenos

Home or Last Project Picture

Apr 30, 2024     Delay in installing Aileron push rods - (12 hours)       Category: Wings
Not only is the depiction of the aileron push rod fasteners and bearings inconsistent, but it's missing parts and clear instructions.

I spent days racking my brain on how to resolve this. So I went to EAA CHAPTER 1250 INC and asked the experts. They gave me enough to resolve the problem in that the flanged sintered bronze flanged and thrust bearings supplied with a kit was too short to fit in the rod end, so I had to manufacture a small bushing to take up the slack in the rod end.

This has halted the project for weeks. The photo shows a solution that will provide adequate bearing surface using centered bronze bearings.

These bearings will be soaked with turbine oil prior to installation. I'm using turbine oil because Symmco recommends saturating the bearings in R&O 100 turbine oil.


 
Apr 10, 2024     Drilled holes left aileron wing hinge.       Category: Wings
Drilled holes left aileron wing hinge.


 
Apr 08, 2024     Aileron Hinge Drilling - (1 hour) Category: Wings
Continued drilling left hinge, using clamps to hold it in position.
 
Apr 05, 2024     Positioned left aileron on wing - (4 hours) Category: Wings
Progress:
- Riveted right aileron 118 places
- Final positioning of left aileron wing hinge, held on with 20 clamps
- Drilled 15 pilot holes. 103 to go
 
Apr 01, 2024     Drilled right aileron wing hinge - (2 hours)       Category: Wings
Right Aileron work completed:
- Drilled and installed one cotter on inner hinge
- Cut one 19.5 inch hinge pin
- Drilled and clecoed 1/8 holes in wing hinge
- Re-checked hole location for outer hinge cotter pin


 
Mar 26, 2024     Located holes for right aileron hinge cotter pin - (2 hours) Category: Wings
Located two holes by:
- Studying the drawings
- Understanding the design
- Measuring the angles
- Marking the hinge
 
Mar 24, 2024     Aileron right hinge mated - (4 hours)       Category: Wings
Aligned, mated and drilled right aileron wing hinge. Clecoed and mated the aileron and installed pin for a trial fit. Works well so far.


 
Mar 23, 2024     Aileron push rods and wing hinge - (5 hours)       Category: Wings
Getting ready to drill the right aileron hinge by:

Locating the drawings and understanding the correct dimensions
Measuring and cutting the wing hinges
Drawing locator marks on the wing hinge and wing
Clamping it in place.


 
Mar 22, 2024     Ailerons Done - (8 hours)       Category: Wings
Completed riveting both ailerons. This included a lot of drilling, clecoing, deburring, cleaning, reassembling, re-clecoing and riveting.

The results are strong and light. The light in the photo amplifies the fact the skin is dimpled where the ribs are riveted. For future reference, I would have, just to be sure measured and adjusted the bend angle of the ribs with a sheet metal tool and a square.


 
Mar 14, 2024     Ailerons getting done - (2 hours) Category: Wings
Left aileron complete, including drilling and riveting. Right aileron 70% drilled, including hinge.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.