EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
LincolnSport
-
Listing for Category : fuselage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (110)
Research
- (1)
Workshop
Empennage
Fuselage
- (10)
Firewall
Tail Feathers
Wings
- (11)
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
- (17)
Engine
- (2)
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Paul Isakson
-
Project:
Plans Built
-
VIEW REPORTS
Total Hours:
487.5
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Nov 16, 2017 - No Finish Date
Engine:
Mosler CB-40
Propeller:
St Croix
Friendly URL:
https://eaabuilderslog.org?s=LincolnSport
Home or Last Project Picture
Mar 15, 2019
fabrication of fire and instrument bulk heads
- (5.00 hours)
Category: Fuselage
Cut out spruce blocks to go around perimeter of bulkheads. Installed 8-32 breass insert for future cowling mounting. 2 coats of epoxy varnish on instrument panel mwith wet sanding before and after.
FP24032019A0000M.jpg
FP24032019A0000N.jpg
FP24032019A0000O.jpg
Dec 26, 2018
mock up of fuel tank
- (3.00 hours)
Category: Fuselage
Mocked up the the fuel tank out of tag board. Turned out great. Estimated at 5 gallons. That's about an hour and 45 minuts of flight time
FP26122018A0000R.jpg
FP26122018A0000S.jpg
FP26122018A0000T.jpg
Dec 01, 2018
instrument and forward bulkhead
- (3.00 hours)
Category: Fuselage
Mocked up instrument panel and front bulkhead. I can now start fuel tank construction and instrument placement.
FP04122018A0005Y.jpg
FP04122018A0005Z.jpg
FP04122018A00060.jpg
Nov 07, 2018
fixing stringer spacers
- (2.00 hours)
Category: Fuselage
When gluing the spacers and stingers in place, I did not sand the spar varnish and the glue did not hold. Always sand to provide tooth for the glue.
FP04122018A0005L.jpg
FP04122018A0005M.jpg
Jan 30, 2018
finish installing stringers/formers
- (6.00 hours)
Category: Fuselage
Clamped and glued spacers in place to stabilize the lower stringers. Actually came out ver nice and straight. Installed the top and side stringer panels. Pictures don't do justice. They look real nice.
FP31012018A00002.jpg
FP31012018A00003.jpg
FP31012018A00004.jpg
Jan 29, 2018
final fitting of bottom former/stringer
- (6.00 hours)
Category: Fuselage
Spent the day installing the lower former/stringer and figuring out a way to keep the stringers straght. 4" X 4" pieces of basswood were glued and reinforced.
FP30012018A00009.jpg
FP30012018A0000A.jpg
FP30012018A0000B.jpg
Jan 28, 2018
finished weldingof fuselage add-ons
- (6.00 hours)
Category: Fuselage
Jason Bottolfson, the welder, came over and we spent 6 hours do the finish welding. No Pics.
Nov 15, 2017
moved 1st stringer station
- (3.00 hours)
Category: Fuselage
After moving the seat back back 2 1/2", the first stinger station had to move back. Cut out formers , repositioned stringer station, and cut and glued formers in their new postion.
FP16112017A000D6.jpg
Oct 28, 2017
Remove lower formers
- (3.00 hours)
Category: Fuselage
Had to lift fuse off the ground to remove landing gear so lower former could be removed. Reinstalled landing gear. Repostioned lift to lft fuse. Lower wing ready to install
FP29102017A0001D.jpg
FP29102017A0001E.jpg
FP29102017A0001F.jpg
Aug 19, 2017
lower stringer fitting
- (2.00 hours)
Category: Fuselage
Lower fuse stringers need fitting to make room for diagonal cable bracing of font landing gear attachment.
FP10102017A00011.jpg