Project:   Plans Built   -   VIEW REPORTS
Total Hours:487.5
Total Flight Time:
Total Expense:N/A
Start/Last Date:Nov 16, 2017 - No Finish Date
Engine:Mosler CB-40
Propeller:St Croix
 
Friendly URL: https://eaabuilderslog.org?s=LincolnSport

Home or Last Project Picture

Nov 06, 2018     Modify floorbds and modify attach point - (4.00 hours)       Category: Wings
Cut rear attach point to match wing contour and raise up rtrailing edge of wing to get 1 1/2 degrees of incidence.


 
Feb 16, 2018     fabrication of n-struts - (5.00 hours)       Category: Wings
Fabricated the right front and and 2 rear struts. Then I fabricated the diagonals. Next step is to relevel and rerig the wings before welding the diagonals in place. Things are moving forward quite nicely.


 
Feb 12, 2018     wing struts - (5.00 hours)       Category: Wings
After practicing technique, Im fabricated my first strut from fuse to wing.


 
Dec 13, 2017     welded pulley brackets onto fuse - (4.00 hours)       Category: Wings
Tack welded aileeron pulley brackest to fuse. made and ran the new cables.


 
Dec 12, 2017     remake of aileron pulley brackets - (5.00 hours)       Category: Wings
aileron pulley brackets had to be remade. Here is the mockup and cutouts of the new brackets.
I bent them up and they fit really well. Tomorrow is welding time. Things are going well.


 
Dec 11, 2017     new bolt order came - (3.00 hours)       Category: Wings
Spent the afternoon installing new bolts, washers and nuts. Now it is time to install working aileron cables.


 
Dec 10, 2017     ran balancing cable - (6.00 hours)       Category: Wings
Today i ran the balancing cable. Still need to whip the ends. I also tack welded the main aileron cable tabs to the control stick. Pictures to come on the tabs.


 
Dec 09, 2017     Balancing cable routing - (6.00 hours)       Category: Wings
Today I fabricated the fairleads for the right side and center and installed. I ran a string to check the location of the cable routing and it all looks good.


 
Dec 07, 2017     continuation of aileron cable routing - (6.00 hours)       Category: Wings
Today I fabricated the left and right aileron cable pulley fittings. i also fabricated the 2 outboard fairleads. Things are moving forward.


 
Dec 05, 2017     figuring out the aileron control system - (5.00 hours)       Category: Wings
today I measured for bolts and made an order with the bolt company. I also ran a string to simulate the routing of the work cable. tomorrow I will work on the balancing cable


 
Dec 04, 2017     Installed lower wing and other - (5.00 hours)       Category: Wings
Bill came over and helped install the lower wing. I fitted the aileron and installed the hinges. Easier said than done. I have to fabricate a wedge to mate the lower wing to fit flush to the wing attach fitting of the fuse at the rear attach point Life is good..


 