Project: Toby   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Toby Tremble   -  
Project:   PA-18 SQ2   -   VIEW REPORTS
Total Hours:926.5
Start/Last Date:Jan 30, 2022 - No Finish Date
Engine:Lycoming 0-360
 
Friendly URL: https://eaabuilderslog.org?s=Toby

Home or Last Project Picture

Mar 28, 2024     Flight testing - (5 hours)       Category: Inspection
Completed project and working on flight test/breaking in motor. I have 5hrs on it and it's going well.


 
Jan 20, 2024     Airworthiness - (3 hours) Category: Inspection
My DAR gave me a final inspection and provided me with an airworthiness certificate. When the weather gets better I'll start phase 1 testing.
 
Jan 16, 2024     W/B - (4 hours)       Category: Inspection
Got my weight and balance done by an A&P. 1196 lbs I'm happy. Big wing, big tail, slats, wide body, L-21, 6” gear, 35's, baby bush wheel, seats, interior, all inspection covers, 7 quarts of oil. Right where I wanted to be without cheating on the weight. Ready to fly - fuel. 13” behind the leading edge CG empty with an envelope of 10.5” to 22” I'm about perfect. The picture of the scale includes the weight of the wood blocks. 1,104 lbs useful load.


 
Jan 15, 2024     Paper work - (4 hours) Category: Inspection
Turned in the necessary paperwork to the FAA to get the ball rolling on my airworthiness certificate.
 
Jan 15, 2024     Seat belts - (2 hours)       Category: Interior Finish
Cut some bushing on the lathe to allow the attachments to swivel. Installed the front and rear seatbelts.


 
Jan 11, 2024     Door latch - (2 hours)       Category: Fuselage
Powder coated and installed with rivets an upper door latch.


 
Jan 10, 2024     Inspection covers - (3 hours)       Category: Fuselage
Made paper templates and cut out carbon inspection covers. Attached small panels with pk screws and the larger bell crank covers have nut plates and #6 screws.


 
Jan 09, 2024     Inspection covers - (3 hours)       Category: Fuselage
Made paper templates and cut out carbon inspection covers. Attached with pk screws.


 
Jan 06, 2024     Boot cowl - (.5 hour)       Category: Fuselage
Finished up the boot cowl bottom.


 
Jan 03, 2024     Windows - (2 hours)       Category: Fuselage
Cut out lower door glass and install with pop rivets.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.