Project: Toby   -  
            Listing for Category : engine
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Toby Tremble   -  
Project:   PA-18 SQ2   -   VIEW REPORTS
Total Hours:926.5
Start/Last Date:Jan 30, 2022 - No Finish Date
Engine:Lycoming 0-360
 
Friendly URL: https://eaabuilderslog.org?s=Toby

Home or Last Project Picture

Dec 30, 2023     Oil pressure - (1 hour)       Category: Engine
Added Phillips 20-50 to the sump and filled the oil pressure sensor line with oil. I hand propped the motor until I built oil pressure.


 
Nov 24, 2023     Carb heat - (.5 hour)       Category: Engine
Used scat tube and an exhaust collector to feed the carb heat box.


 
Nov 18, 2023     Wiring - (4 hours)       Category: Engine
Wired my emags, solenoids, main fuses, starter, and ran grounds.


 
Nov 09, 2023     Exhaust - (2 hours)       Category: Engine
Installed exhaust supports and crack case vent on exhaust pipe (anti splat).


 
Oct 14, 2023     Plenum - (1 hour)       Category: Engine
Added silicone baffle seal around plenum intake's.


 
Oct 05, 2023     Plenum's, air box - (3 hours)       Category: Engine
Trimmed and installed nut plates to attach air box to cowling. Trimmed and glued plenum scoops in place using plexus adhesive.


 
Oct 03, 2023     Oil lines - (4 hours)       Category: Engine
Doubled oil cooler mounting flange with .40 aluminum and installed 10-32 nut plates. Mounted oil cooler to cowling and made oil lines from stratoflex 111-6. Routed and used adel clamps to support lines.


 
Sep 27, 2023     Air box - (1 hour)       Category: Engine
Laid carbon on the mold I made for my air box. Hot glued mold in place inside cowling and laid in place for tight fit. Need to trim and sand yet


 
Sep 24, 2023     Air box, plenums - (3 hours)       Category: Engine
Made a mold to lay up a fiberglass/carbon fiber air box. Trimmed plenum openings for air scoops.


 
Sep 23, 2023     Engine hang - (4 hours)       Category: Engine
Installed oil line fittings on accessory case. Hung motor, mocked up cowling, and trimmed.


 
Sep 16, 2023     Sensors - (2 hours) Category: Engine
Installed oil temp, egt, and cht sensors on all 4 cylinders. Everything torqued
 
Sep 16, 2023     Exhaust - (1 hour)       Category: Engine
Installed exhaust and torqued nuts to lycoming spec.


 
Sep 02, 2023     Exhaust - (2 hours)       Category: Engine
Installed my vetterman exhaust to check fit with cowling and scat tube route.


 
Sep 02, 2023     Prop lugs - (1 hour)       Category: Engine
Had to get new prop lugs form saber so I would have proper engagement with my whirlwind propeller. Pressed out the old and pressed in the new.


 
Aug 24, 2023     Engine install - (2 hours)       Category: Engine
Installed the engine mount and set bushings to proper specifications. Installed on aircraft.


 
Feb 05, 2022     Inspection and Accessories - (1 hour)       Category: Engine
Uncreated 0SMOH 0-360 after shipping to inspect. Installed some accessories oil filter, oil drain plug, breather tube, etc. Installed to lycoming torque spec and safety wired.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.