Project:
Toby
-
Listing for Category : tail feathers
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (285)
Research
Workshop
- (2)
Empennage
- (4)
Fuselage
- (50)
Firewall
- (19)
Tail Feathers
- (13)
Wings
- (76)
Controls
- (17)
Avionics
- (7)
Lighting
- (3)
Instrument Panel
- (2)
Landing Gear
- (6)
Engine
- (24)
Propeller
- (1)
Fuel System
- (11)
Interior Finish
- (18)
Paint / Decals
- (27)
Inspection
- (4)
Tools
- (1)
Builder Name:
Toby Tremble
-
Project:
PA-18 SQ2
-
VIEW REPORTS
Total Hours:
926.5
Start/Last Date:
Jan 30, 2022 - No Finish Date
Engine:
Lycoming 0-360
Friendly URL:
https://eaabuilderslog.org?s=Toby
Home or Last Project Picture
Sep 28, 2023
Elevators and rudder
- (3 hours)
Category: Tail Feathers
Installed elevators and rudder. Cables and control links torqued, tensioned, and cotter keyed.
IMG_6255.jpeg
Sep 23, 2023
Horizontal stabilizers
- (2 hours)
Category: Tail Feathers
Mounted horizontal stabilizers and drag wires. Squared tail and set tension on drag wires. Everything is torqued and torque sealed
IMG_6206.jpeg
Sep 19, 2023
Paint prep
- (3 hours)
Category: Tail Feathers
Wet sanded and washed tail feathers. Prepped the spray booth for top coat after everything dries out.
IMG_6180.jpeg
Sep 18, 2023
Primer
- (3 hours)
Category: Tail Feathers
Quick sand and applied the second coat of primer on all the tail surfaces
Sep 17, 2023
Primer
- (4 hours)
Category: Tail Feathers
Prepped all my tail surfaces and sprayed the first cross coat of superflight primer.
IMG_6175.jpeg
IMG_6177.jpeg
Sep 10, 2023
Covering
- (10 hours)
Category: Tail Feathers
Horizontal stabilizers, elevators, and rudder are ready to prime and paint.
IMG_6153.jpeg
IMG_6154.jpeg
Sep 04, 2023
Covering
- (5 hours)
Category: Tail Feathers
Shrank and surfaces to 350 and started rib stitching.
IMG_6104.jpeg
Aug 31, 2023
Covering
- (7 hours)
Category: Tail Feathers
Elevators and Rudder covered and shrink to 250.
IMG_6079.jpeg
Aug 30, 2023
Covering
- (6 hours)
Category: Tail Feathers
Horizontal stabilizer's covered and shrink to 250. Started working on an elevator.
IMG_6076.jpeg
Apr 03, 2023
Tail
- (3 hours)
Category: Tail Feathers
Installed tail surfaces and drilled attachment bolt holes. Checked and adjusted control deflection.
F521D655-7678-4C6E-8294-883E36A7F414.jpeg
Nov 18, 2022
Powder coating
- (1 hour)
Category: Tail Feathers
Dropped the tail surfaces and slats off to get powder coated.
369C7CB2-D13E-48DE-AFA7-D1033AE9B6A4.jpeg