Project: Toby   -  
            Listing for Category : firewall
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Toby Tremble   -  
Project:   PA-18 SQ2   -   VIEW REPORTS
Total Hours:926.5
Start/Last Date:Jan 30, 2022 - No Finish Date
Engine:Lycoming 0-360
 
Friendly URL: https://eaabuilderslog.org?s=Toby

Home or Last Project Picture

Dec 15, 2023     Cowling - (3 hours)       Category: Firewall
Installed camloc receptacles and chafe tape on cowling. Attached felt and camloc's on cowling doors. Installed cowling and cowling doors.


 
Nov 06, 2023     Nut plates - (1 hour) Category: Firewall
Installed floating nut plates on the firewall lip for cowling attachment.
 
Nov 05, 2023     Cowling - (3 hours)       Category: Firewall
Had to use body filler to fill over depressions. Finished wet sanding cowling.


 
Nov 04, 2023     Cowling - (3 hours)       Category: Firewall
Drilled a hole in the lower boot cowl to clear the gascolator. Removed cowling and boot cowl to prep for painting. Wet sanding cowling


 
Oct 31, 2023     Cowling door - (2 hours)       Category: Firewall
Right cowl door ready to prep for paint.


 
Oct 30, 2023     Cowling door - (2 hours)       Category: Firewall
Riveted a aluminum stiffener in and riveted to the hinge. Left cowling door is ready to prep for paint.


 
Oct 15, 2023     Cowling doors - (4 hours)       Category: Firewall
Worked on camloc's and slip rolled left cowling door.


 
Oct 14, 2023     Cowling - (2 hours)       Category: Firewall
Started making cowling doors. Used a slip roller to for door shape.


 
Sep 24, 2023     Cowling - (4 hours)       Category: Firewall
Clecoed cowling in place. Laided out and cut out for intake filter and oil cooler. Cut holes for exhaust scoops


 
Sep 22, 2023     Cowling - (6 hours)       Category: Firewall
Sanded cowling extensions and spread another layer of putty. Glassed over old intake opening. Popped plenum scoop off the mold and trimmed.


 
Sep 21, 2023     Cowling - (5 hours) Category: Firewall
Laid my plenum intakes. Popped the molds off of the cowling. Worked on laying structural putty and sanding the extension transition.
 
Sep 20, 2023     Cowling - (3 hours)       Category: Firewall
Worked on extending my cowling and prepped the molds for my plenum scoops.


 
Sep 15, 2023     Firewall - (3 hours)       Category: Firewall
Laid out firewall penetrations, drilled holes, installed grommets and nut plates, and cut out firewall blanket.


 
Aug 29, 2023     Baffling - (1 hour)       Category: Firewall
Mocking up intake scoops for plenums. Looks like the mold from a friends set up are gonna work with a little trimming.


 
Feb 17, 2023     Bottom boot cowl - (1.5 hours)       Category: Firewall
Used a friends bead roller to stiffen up my lower boot cowl piece


 
Feb 10, 2023     Boot cowl - (2 hours)       Category: Firewall
Used a friends slip roller to form the bottom cowl pieces.


 
Feb 07, 2023     Boot cowl - (2 hours)       Category: Firewall
Boot cowl and false cowl are getting close to being finished. Just need to tie together the bottom.


 
Feb 05, 2023     Boot cowl - (3 hours)       Category: Firewall
More boot cowl and false cowl.


 
Feb 04, 2023     Boot cowl - (10 hours)       Category: Firewall
Wasn't happy with the boot cowl template I had made after I mocked up the cowling. Ended up hanging the motor taking measurements and decided to drop the firewall 1 1/2” to make it all flow better. Made the top part of the boot cowl.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.