Project: SteveBRV-14   -  
            Listing for Category : Show all entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Steven Bryk   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:378.35
Total Flight Time:
Total Expense:$5870.00
Start/Last Date:Sep 16, 2023 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=SteveBRV-14

Home or Last Project Picture

Feb 17, 2024     Left Fuel Tank - (8 hours) Category: Wings
Building left fuel tank. Proseal is nasty stuff
 
Feb 16, 2024     Installing Small wing stiffeners - (8 hours) Category: Wings
Installed wing stiffeners into both left and right tanks with pro-seal. This is some messy stuff.
 
Jan 19, 2024     Avionics Research - (4 hours)       Category: Avionics
Started my research for a panel and decided to go with Avionics systems


 
Dec 17, 2023     Prep right wing rear spar - (4 hours) Category: Wings
RIGHT WIng Section 15-03. match drill all hols in prep for Rivets
 
Dec 16, 2023     Right Wing Rivet Ribs to Spar 14-08 - (4 hours) Category: Wings
Place bolts and rivet wings to Spar in right wing Section 14-08 . Bucker was Dean Howard
 
Dec 02, 2023     Prep rear spar and doublers 15-03 - (7 hours) Category: Wings
Prep, rear spar after alodine mount and rivet all doublers and aileron Hindge. Section 15-03 and countersinc 15-04 LEFT WING at this time
 
Dec 02, 2023     Elevator completion - (2.7 hours) Category: Tail Feathers
Finshed all sections and installed trim motor Sections 09-22 - 09-26 w JP
 
Dec 01, 2023     Mounting control arms and riveting - (1.5 hours) Category: Tail Feathers
Mounting control arms and riveting section 9-21 9-22
 
Nov 30, 2023     Riveting Lower Skins Category: Tail Feathers
Section 9-20, 9-21 Connecting Ribs to Lower Skins w JP
 
Nov 29, 2023     Connecting SKins - (3.2 hours) Category: Tail Feathers
Connecting skins to ribs 09-18, 09-19
 
Nov 28, 2023     Control Ar and weights - (3 hours) Category: Tail Feathers
Section 09-17 , 09-18
 
Nov 27, 2023     Skin work - (3 hours) Category: Tail Feathers
Skin work with JP Section 09-15, 09-16
 
Nov 26, 2023     Rivet Ribs to left Wing - (6 hours) Category: Wings
Section14-07. LEFT WING
 
Nov 25, 2023     Add Rib Bracket and torque tube to left wing - (2 hours) Category: Wings
Connect inboard and outboard wing flap brackets and torque tubes section 14-06
 
Nov 18, 2023     WIng Bushings 14-04 and 14-05 - (3 hours) Category: Wings
Up drill all bushing holes per 14-04 1nd 14-05 both wings. Put bushings in holes. ADD additional boles for Pitot tube and AOA.
 
Nov 15, 2023     Trim Motor install - (3.5 hours) Category: Tail Feathers
Section 9-11 and 9-12 with JP
 
Nov 15, 2023     Elevator Spars 09-11. 09-12 - (3.5 hours) Category: Tail Feathers
Completed Spare work section09-11 to 09-12 w JP
 
Nov 14, 2023     Section 09-10 Elevator Tip Ribs - (1 hour) Category: Tail Feathers
Worked to complete tips in section 09-10
 
Nov 14, 2023     Section 09-10 Elevator Tip Ribs Category: Tail Feathers
Worked to complete tips in section 09-10
 
Nov 13, 2023     Section 14-02 1n14-03 Torque Tube Assembly and Flap hinge - (6 hours) Category: Wings
Section 14-02 1n14-03 Torque Tube Assembly and Flap hinge. Preped, sent to alodine, and then built both torque tube assemblies and inboard flap hinge assemblies
 
Nov 09, 2023     Trim Hindge 9-07 - (2 hours) Category: Tail Feathers
Section 9-07 9-08, 9-09 Working the trim hinge with JP
 
Nov 08, 2023     Flanges and Ribs section 9-06 - (1.5 hours) Category: Tail Feathers
Continues Section 9-06 Flanges and Ribs W JP
 
Nov 07, 2023     Section 9-06 - (1.5 hours) Category: Tail Feathers
Section 9-06 w JP
 
Nov 06, 2023     Elevator rebuild - (1.5 hours) Category: Tail Feathers
Worked on Section 9-04, 9-06 Flanges and ribs W JP. Had all part Alodined and returned $120
 
Nov 05, 2023     Start Rebuild Elevator - (5 hours) Category: Tail Feathers
Build Section 09-02.09-04. With John Poe Builder assist
 
Nov 04, 2023     Completion of Spars 14-04 and 14-05 - (5 hours) Category: Wings
Both spars completed Section 14-05 in left spar had to update how W-823-1 was connected. Nut plate was stripped. removed nut plat and used a nylock an-3 nut to lock it in place. Nut can be reached from turn buckle access plate under left wing SEE PHOTO . All other torqued to 22 inch pounds as desribed in section 05 torques.
 
Oct 22, 2023     Starting to assemble flap brakets /. Deburing - (2 hours) Category: Wings
 
Oct 21, 2023     Dubur some more - (2 hours) Category: Wings
 
Oct 18, 2023     Prep many wing part Alodine - (2 hours) Category: Wings
Prepping Wing part for Alodine $350 to date
 
Oct 17, 2023     Lights - (2 hours) Category: Wings
Assembled FlyLED Lights
 
Oct 14, 2023     deburing wing parts - (3 hours) Category: Wings
Assemble flap hinges deburing and smoothing in ready for alodine
 
Oct 10, 2023     Ribs 1 - (2.5 hours)       Category: Wings
Worked To flute straighten and debur ribs also dimpled section 14-02


 
Oct 10, 2023     Prepping Ribs - (4 hours)       Category: Wings
Prepping ribs, Align flange 90* , Drilling and Dimpling


 
Oct 03, 2023     Finish Spar 2 - (2 hours) Category: Wings
completed sections 13-04 1nd 13-05 on Right Spar. Same as Left Spar
 
Oct 02, 2023     more nutplates - (5 hours)       Category: Wings
Section 13-03.


 
Oct 01, 2023     Installing the nut plates on the Spar - (4 hours)       Category: Wings
Section 13-04 and 13-05


 
Sep 30, 2023     Second Spar Drilling - (4 hours)       Category: Wings
Worked to drill, deburr and countersink Spar 2 Right 13-03


 
Sep 29, 2023     finish spar 1 - (5.45 hours) Category: Wings
Spent all day Saturday working on prepping drilling and counTersinking side two spar 1 Section 13-03 and 13-04
 
Sep 22, 2023     primming multiple wing parts - (1.5 hours) Category: Wings
 
Sep 22, 2023     Continuing to countersink       Category: Wings
Lerning how to counTersink and fix mistakes 13-03


 
Sep 20, 2023     Starting to countersink - (2 hours)       Category: Wings
Section 13-03


 
Sep 19, 2023     Prepping of multiple parts for Primeing - (3 hours) Category: Wings
Had trouble getting plastic off multiple parts. Remove plastinc before doing anything on part Alodine
 
 
Sep 16, 2023     Section 15 1-5 Match drill J-Channel - (3.0 hours)       Category: Wings
Starting the wing match drilling J-Cahnnels


 
Aug 30, 2023     Power tools - (4 hours) Category: Workshop
Bought drill press, band saw, grider wheel, sanding belt top, and an assortment of air tools, Rivet Gun, Pull Gun, Hydraulic squeezer and Lots of other tools ad dies
 
Aug 20, 2023     Built 3 EAA tables - (8 hours) Category: Workshop
Built 3 EAA tables all 2'by 5'
 
Jun 04, 2023     Empennage build 2 - (100 hours) Category: Empennage
 